Cash settlement of building repairs, temporary accommodation and other costs after escape of liquid (burst flexi hose) and mould damage
Text of the determination
Determination
Case number 918141
Financial firm Insurance Manufacturers of Australia Pty Ltd
Determination | Case number: 918141 Page 1 of 11
Case number: 918141 11 January 2024
1 Determination overview
1.1 Complaint
The complainant lodged a claim with the financial firm (the insurer) on 28 July 2021 after her
property sustained water ingress following a burst flexi hose in the kitchen.
The insurer assessed the claim and accepted the water ingress and mould damage. It
stripped out various parts and undertook mould remediation. The insurer has now sought to
cash settle the complainant for the resultant water damages. Part of the reason is there is
existing mould damage and other pre-existing issues.
The complainant dis putes the insurer‟s settlement. She says all of the existing mould is
related to the claimed event or the insurer‟s claims handling. She is seeking compensation for
all the outstanding repairs as well as additional temporary accommodation and other costs.
1.2 Issues and key findings
Is the insurer’s settlement for the building repairs fair?
No. The insurer‟s latest settlement did not include the ensuite. This should be included as
there is information to show it is damaged. Therefore, the insurer should settle the building
repairs as set out in section 2.1.
Is the insurer’s settlement for temporary accommodation fair?
No. The insurer should pay for the complainant‟s temporary accommodation until 10 months
have passed after it has issued the cash settlement for the building repairs or repairs are
completed, whichever comes first. This is because most of the complainant‟s temporary
accommodation costs were due to the insurer‟s poor claims handling.
What other costs should the insurer pay?
The complainant incurred various costs in the course of this claim. Several of these should be
covered. This is because they are losses caused by the claimed event or the insurer‟s poor
claims handling. Other costs are not required to be covered by the insurer.
1.3 Determination
This determination is substantially in favour of the complainant.
Within 21 days of receiving notice the complainant accepts this determination, the insurer
should issue payments set out in sections 2.1 and 2.3.
The insurer is to settle the complainant‟s tempo rary accommodation costs as set out in
section 2.2 and follow through with any actions noted in section 2.3.
Determination | Case number: 918141 Page 2 of 11
2 Reasons for determination
2.1 Is the insurer’s settlement for the building repairs fair?
Complainant is responsible for establishing a valid claim
The complainant carries the initial onus to establish, on balance, the loss or damage being
claimed falls within the scope of cover under the policy. Only once this is established does the
onus shift to the insurer to show, on the balance of probabilities, an exclusion applies or that it
is otherwise entitled to decline the claim in whole or in part.
The complainant‟s policy is an insured events policy. That means it only responds where one
or more of the listed insured events causes the damage. That cover is, however, subject to
the remaining policy terms, conditions and exclusions.
One of the listed insured events is the escape of liquid (from a fixed pipe).
Insurer says not all damage is related to the event
The insurer has recently agreed to pay $385,315.61. This is based on the complainant‟s cost
minus the ensuite repairs as well as bedroom 3 and 4. The insurer says these areas were not
damaged by the claimed event.
Insurer liable for all damage except for bedrooms 3 and 4
The panel disagrees wit h the insurer‟s position to an extent.
In NR‟s report dated 2 May 2023, evidence of mould was found in the ensuite and other
damage in that area. This was supported by photos. The insurer has not explained why this
apparent damage is not related to the claim. The panel accepts the ensuite should be
included.
There has been some variation in the nomenclature used to refer to bedrooms 2, 3 and 4. For
the avoidance of doubt, in this determination, references to bedroom 2 refer to the room that
shares a wall with bedroom 1 (i.e. the master bedroom, which was directly below the kitchen).
Bedrooms 3 and 4 are understood by the panel to be the bedrooms with windows in the
western wall of the house; that is, the two bedrooms furthest from the kitchen (referred to at
one point by the insurer as the study and gym respectively).
On bedroom 3 and 4, the panel notes NR‟s reports following demolition did not show these
areas are damaged. None of the photos show damage to those areas. The reports focused
on other areas. The panel has identified only three references to any of these bedrooms in
NR‟s reports. First, in NR„s report dated 23 November 2022:
[U]pon further investigation, the swelling of the flooring and skirting boards in bed
3 (adjacent to Bed 1) indicates to us that water and possible mould damage will
have extended further than just bed 1 and 3. Further testing and assessment is
advised and most likely will require further remediation works.
(The panel notes it is more likely than not that the reference to bedroom 3 in this report is
most likely a reference to what this determination calls bedroom 2 i.e. the room that shares a
wall with bedroom 1.)
Determination | Case number: 918141 Page 3 of 11
Secondly, NR‟s 19 April 2023 report states:
We found mould on the ceiling plasterboard in bedroom 2 ceiling space
underneath where a floor duct outlet opening allowed water to flow down from the
first floor, and similarly in bedroom 3 …
[W]e removed the floating floor in bedroom 2 and 3. This left a noticeable damp
smell in the area, and the underlay had evidence of water damage, as did the
floating floor with areas of swelling and mould. Please refer to the attached
photos.
However, there are no photographs labelled as depicting bedroom 3 or 4 in this report.
Thirdly, NR‟s report dated 2 May 2023 states:
With the extent of damage to the linings of the ensuite, and my professional
opinion before commencing any works, the ensuite requires refurbishment, along
with bedroom 2 and 3, all ceilings of the ground floor require refurbishment, this is
in addition to the works already submitted.
However, this does not of itself show there was damage to bedroom 3, let alone to bedroom
4.
NR‟s report dated 28 March 2023 noted it is possible water damage extended to the
plasterboards and floating floors in at least bedrooms 2 and 3. However, this was before the
demolition works and was clearly an assumption. The demolition works that followed this only
showed physical damage to bedrooms 1 and 2. They did not confirm damage to bedroom 3
or 4.
Previous reports do not suggest these areas were physically damaged. Mould reports
obtained by both the insurer and the complainant showed issues with bedroom 1 and 2, but
not bedrooms 3 and 4. The insurer‟s scope of works and assessment did not identify damage
to these two bedrooms.
Given all this, the panel does not accept the information shows the damage claimed for
bedrooms 3 and 4 have been substantiated. Further, the panel is not persuaded there is
sufficient evidence to make out the complainant's allegations that there is damage to these
roo ms, and even if it were, that any such damage was caused by the insurer‟s contractors.
The panel notes it is possible NR‟s quote refers to what this determination calls bedroom 3,
bedroom 2, and vice versa. This would align with the floor plan provided to AFCA by the
complainant, and also explain the parenthetical description of bedroom 3 as “ adjacent to Bed
1 ” in NR‟s 23 November 2022 report. NR‟s total for bedroom 2 is $8,938.46; for bedroom 3 it
is $11,870.22. It is the latter amount the insurer has discounted from the cash settlement
offer. If the complainant accepts this determination, but the insurer has in fact discounted the
wrong bedroom, she can also provide written confirmation from NR to that effect with her
acceptance of this determination. In that event, the building cash settlement amount (before
uplift and interest) would increase by $2,931.76 (because, if NR provides that confirmation,
the insurer is only entitled to deduct $8,938.46, not $11,870.22).
Determination | Case number: 918141 Page 4 of 11
Mould remediation and floorboard replacement costs
The complainant has sought $50,330.50 for mould remediation in addition to NR‟s quote. Her
spreadsheet that set out her claim for this referred to NR‟s demolition reports. However, NR‟s
reports do not quote this figure. NR‟s second report dated 2 May 2023 only says:
Mould remediation has been estimated to cost $8,900 in addition to my previous
proposal
This is substantively lower than the figure quoted. Further, the reference to “proposal” in NR‟s
report was regarding NR‟s previous quote. NR latte r issued a quote dated 6 October 2023.
The document refers to the „Proposal on the Remediation Works to your Home‟. It makes no
reference that mould remediation is excluded or to be quoted separately. The report
accompanying the 6 October 2023 quote says (our emphasis):
This further revision of the works required has been compiled following revealing
the full extent of the damage and mould conditions present in the home ...
requiring further removal of (but not limited to) fittings, fixtures, tiles, plaster,
ducting, insulation and remediation of mould found to be present. Reports were
provided in April of this year (2023) to evidence the further works required. The
costs associated with the works are noted below.
Therefore, the panel is not persuaded $50,3 30.50 should be added to NR‟s figure. Instead, it
appears NR‟s proposal is to fully repair the claim related damage. If that is the case, then it is
not clear why this amount should be added.
This similarly applies for the floorboard replacement cost of $30,059.08 for upstairs. The
complainant has added this in addition to NR‟s proposal. If such replacement was necessary,
it is not clear why it was not included given NR has quoted for floorboard replacement
elsewhere and its proposal was for all the works required.
Further, any such addition would require the panel reaching a state of satisfaction that (a) the
upstairs floorboards require replacement, and (b) the need for that replacement arises from
the insured event, and was not proximately caused by an excluded event (such as problems
with the initial installation of the floorboards, or with water ingress through deteriorated
windows). Competing evidence has been provided by the insurer and the complainant in
relation to these matters. In circumstances wh ere the complainant‟s preferred builder has not
seen fit to include this work in his scope, the panel does not accept the complainant‟s position
is substantiated.
Insurer should pay $479,282.72 plus interest
The panel considers the insurer‟s latest offer should add back the ensuite for reasons
articulated. This increases the amount to $435,711.56.
The panel considers a 10% contingency ($43,571.16) should be added to account for
unforeseen variations that would arise in such a complicated job. Further, interest should
apply from one month after the quote was issued given it is likely to be outdated by that
timeframe.
Determination | Case number: 918141 Page 5 of 11
Accordingly, for the building repairs, the insurer should pay $479,282.72 plus interest in full
and final settlement. Interest is payable pursuant to section 57 of the Insurance Contracts Act
1984 (the Act). Interest applies from 6 November 2023 until payment is made.
(The panel notes the pre-interest amount may increase to $482,507.65 ($435,711.56 +
$2,931.76 = $438,643.32, plus 10% uplift $43,864.33), in the event the incorrect bedroom has
been deducted from NR‟s quote as set out above.)
2.2 Is the insurer’s settlement for temporary accommodation
fair?
Insurer should pay the complainant’s rates
In its submission dated 15 May 2023, the insurer agreed to cover 26 weeks of additional
accommodation at $1,000 per week. This followed an extension of two weeks. Presumably,
the 26 weeks was to commence on or around 29 May 2023.
The complainant disputes this. She says she should be provided temporary accommodation
until the property is fit to be lived in. She also notes the following:
the insurer has covered her current fully furnished property at $2,383.35 per week
home rentals are currently very scarce
the amount of $1,000 per week would be insufficient to find a comparable rental home fully
furnished
she signed an additional six month extension following the expiry of her previous
agreement (around 18 April 2023) to provide stability for her and her son
it will likely take around 10 months to conduct all the repairs
The policy provides temporary accommodation that is reasonable and appropriate for the
complainant.
The information shows the insurer agreed to cover the accommodation the complainant
currently resides in. This shows it accepted that arrangement was reasonable and
appropriate. The insurer has not substantiated that its offer of $1,000 per week was
reasonable and appropriate having regard to the complainant‟s circumstances and based on
available properties in the local area at the time.
Th erefore, the panel agrees it is fair that any rate be based on the complainant‟s actual
expense provided it is similarly in line with her current arrangement.
Policy limit does not apply
The panel also does not agree 26 weeks is fair. This period was based on the insurer initially
relying on its offer based on R‟s scope of works. That was substantively lower than the
amount payable in section 2.1. Even the insurer‟s current offer was not sufficient to fix the
claim related repairs for reasons explained. In addition, the insurer does not appear to have
made available any of the funds to allow the complainant to begin the claim related repairs.
The panel acknowledges the policy contains a 12 month limit for temporary accommodation.
However, the panel does not accept this limit applies in circumstances when these costs have
been incurred due to the insurer‟s conduct rather than the claim. The panel considers the limit
does not apply because:
additional damage and costs have been incurred due to the insurer‟s cla ims handling
the insurer has incorrectly assessed the extent of its liability under the policy, and
Determination | Case number: 918141 Page 6 of 11
the complainant has spent a significant amount of time in temporary accommodation whilst
challenging the insurer‟s position (and ultimately done so successf ully).
Therefore, the panel considers it fair the temporary accommodation limit should only apply
once the insurer has issued a cash settlement that fairly reflects the full extent of repairs
required. Until then, any temporary accommodation costs incurred is not subject to the policy
limit.
Insurer is to pay temporary accommodation in the following way
The complainant estimated the works would take nine months with an additional month for
mould remediation. The insurer has not provided specific evidence to refute this estimated
time to repair. Noting the extent of works required, and the fact the insurer allowed six months
on its more reduced quote, that does not appear unreasonable.
Given this, the panel considers it fair the insurer pays all the complaina nt‟s temporary
accommodation expenses until the earliest of the following:
10 months have lapsed after the insurer issues its cash settlement as required under
section 2.1, or
the repairs are completed.
To the extent the complainant has herself paid for temporary accommodation, the insurer is to
pay interest on those costs pursuant to section 57 from when they were incurred until
payment is made.
2.3 What other costs should the insurer pay?
Complainant is seeking the following costs
The complainant has sought the following costs or amounts to be reimbursed:
soft furnishings - $101,700.90
unrecoverable items - $3,000
storage and removalist costs - $21,107.36
plants contaminated by mould - $654
medical costs - $73,238.90
demolition costs - $550
hygienist and engineer reports - $9,650
electricity costs – to be determined
valet bill - $1,160
mail redirection - $442
interior designer - $11,350
Soft furnishings
The complainant broke this down in the following way:
Furniture (sofas, beds, cushions) - $44,291
Curtains and blinds - $40,000
Sheets thrown out, cushion, + throw - $5,811.90
Mattresses*3 before being removed - $11,598
The complainant said her fabric covered couches and mattresses, blinds, curtains, wooden
beds (as well as bedside tables and drawers) were sitting in mould and should be replaced.
Determination | Case number: 918141 Page 7 of 11
In support, the complainant provided an email from EVS dated 25 November 2022. This said
various window coverings (13 pleated blinds, 6 drapes to two bedrooms and drapes to two
windows) were affected and needed to be replaced. EVS said these items were stored in a
container for contaminated items.
The complainant believes other soft furnishings should also be replaced due to likely being
contaminated.
The insurer engaged VA to test the contents stored. This included the soft furnishings. VA
produced a report dated 22 July 2022 that showed after extensive testing of the stored
contents, including the soft furnishings, the only item identified with mould was a timber bed
slat. VS said this could be cleaned. It does not appe ar VA‟s test included the blinds and
curtains.
The complainant‟s hygienist (HH) did not identify mould on all the soft furnishings claimed.
Whilst HH noted any semi porous or porous items with visible mould should be discarded,
there is nothing to indicate HH identified this on the soft furnishings. Specific testing done by
VA indicates mould infestation was not evident.
The panel is persuaded the curtains and blinds need replacement. This is supported by EVS
and not refuted by the insurer.
The panel is not persuaded the complainant has shown the balance of the items need to be
replaced. VA‟s report and testings say otherwise. There is no other expert information to
show such extensive replacement is necessary.
The complainant provided a quote from NI for the replacement of the blinds and curtains
totalling $39,902. It is not clear if the insurer has assessed the quote. Despite this, the panel
acknowledges the complainant has disclosed the quote and this was exchanged with the
insurer who had an opportunity to comment.
Given the longstanding nature of this complaint, the panel considers it fair that a cash amount
be paid in settlement of these issues. In this regard, the panel accepts the complainant‟s
quote dated 21 November 2022 from NI be accepted. Whilst t he complainant‟s spreadsheet
in November 2023 referred to $44,000, it is not clear what this is based on. The panel prefers
to have regard to the quote provided.
The insurer is to pay $39,902 in settlement of these issues plus interest pursuant to section
57 of the Act. Interest applies from 21 December 2022, being one month after NI‟s quote, until
payment is made.
Unrecoverable items
The insurer has agreed to pay $1,000 based on S‟s list of unrecoverable items. The
complainant is seeking $3,000.
The complainant has not substantiated this amount. The list of items include various kitchen
items, a rug, batteries and other implements. They have not been priced or quoted by either
party. However, they do not appear to be overly expensive items.
The panel is the refore not persuaded the complainant has shown the insurer‟s offer is unfair.
The insurer can settle these items based on paying $1,000 as offered. No interest is payable
given the complainant has not shown the insurer‟s offer is unfair.
Determination | Case number: 918141 Page 8 of 11
Storage and removalist costs
The complainant is seeking an additional 12 months storage for her contents. She has
estimated this to be $13,107.36. This was based on a discussion with the insurer about how
much it is costing the insurer to currently store the goods.
It appears the storage costs are currently being incurred by the insurer. For the sake of
expedience, rather than a cash settlement, the panel considers it fair the insurer continues to
pay and store the contents until the earliest of the following:
ten months have passed after the cash settlement is issued as directed in section 2.1, or
the repairs are completed.
For the removalist costs and returning the stored contents, the insurer has agreed to pay for
this. The complainant has sought $8,000 in this regard ($7,000 for the return of the contents
and $1,000 for removalist). However, as the contents are being stored in the insurer‟s
premises, it can facilitate and pay for their return costs.
For the removalist, the complainant has provided a quote from the previous one which was
over $1,000. This shows the amount sought is reasonable. This should be paid. No interest is
payable as the cost has not been incurred yet and there is nothing to indicate the amount will
increase.
Plants contaminated by mould
The complainant is seeking for her plants to be replaced that are contaminated.
The insurer has disagreed. The insurer says there is no information to show they were
damaged by the incident. The complainant has provided photos showing there is mould on
them.
The panel accepts it is fair this be reimbursed. The photos show mould, which indicates they
are likely damaged from the claim.
The complainant has provided a screenshot quote in support for the amount claimed ($654).
There is nothing to indicate this is unreasonable. The insurer should pay this amount plus
interest. Interest is payable from 25 April 2023 (being when the estimate expired) until
payment is made.
Medical costs and interior designer
The complainant is seeking a significant amount of medical costs. She has attributed this to
the claimed event and her claims experience.
The insurer has noted the policy excludes this type of loss. This would apply for medical costs
associated with the claimed event. Therefore, the only possible way the complainant could
claim for this is if the information shows this was all caused by the insurer‟s unreasonable
claims handling, not the claimed event itself or other factors (such as pre-existing conditions).
The information does not show this. There is minimal medical information (such as reports or
otherwise) to show these costs were caused by the insurer‟s unreasonable handling of the
claim compared to other factors. These costs are not payable.
For the interior designer, the complainant is seeking this to „reimagine and bring together the
empty shell that is currently my home‟. The panel does not accept this is payable. The
insurer‟s obligation is to restore her, as close as possible, to the position she was in prior to
the claimed event. This would not include a cost to redesign the interior of the home.
Determination | Case number: 918141 Page 9 of 11
Demolition, electricity costs, valet bill and mail redirection
The complainant has provided invoices to show she incurred the costs of demolition, valet
and mail redirection. The insurer has not provided a specific submission that these costs are
not payable. These should be reimbursed if they have not already. Interest is also payable
from when the costs were incurred until payment is issued.
For the electricity costs, this has not been particularised. To the extent the complainant can
show she has incurred additional electricity costs beyond those she otherwise would have
paid if residing in her home, this should be payable. The parties are to work together to
calculate a fair amount.
Hygienist and engineer reports
Under Rule D.5, AFCA may decide a financial firm contribute to the professional costs
incurred by a complainant in the course of a complaint. These costs can be awarded if the
complainant needed an expert to understand or establish their claim. These costs are
normally capped at $5,000 unless exceptional circumstances apply.
The hygienist (HH) provided several reports on this claim. HH was initially engaged by the
complainant who was concerned by the existence of mould and its impact on her health. HH‟s
initial reports confirmed there were mould issues and that the property was not safe to reside
in. These initial reports assisted the complainant to understand and establish her claim.
Given this, the panel considers it fair the insurer contribute up to $5,000 for HH‟s reports.
However, the panel does not accept exceptional circumstances apply as the later reports
were not as probative. This is because the insurer had engaged VA shortly after HH‟s initial
reports and identified similar issues to HH following that.
The engineer (JC) was engaged to review the state of the windows and their contribution to
the mould. The insurer‟s position was these were contributing to the mould issues. JC
provided a report that refuted this. It is not apparent if this report resulted in the insurer no
longer pursuing this issue. However, the panel accepts it was reasonable for the complainant
to engage JC to assist her on that point. Therefore, his report fee should be reimbursed.
Non-financial loss
The insurer has agreed to pay $5,400. This is the maximum amount AFCA can award. The
complainant has not sought a greater amount. It is fair this is paid given the extent of works
outstanding and the time that has passed.
Insurer is to pay and do the following
Therefore, after careful consideration of all the exchanged information, the insurer should pay
the $56,758 plus interest and do the various things set out above. These particulars are
summarised below:
Item Amount
Soft furnishings $39,902 plus interest
Unrecoverable items $1,000
Determination | Case number: 918141 Page 10 of 11
Storage and removalist $1,000 plus insurer to cover
storage and relocation of stored
contents
Plants $654 plus interest
Medical costs and interior designer $0
Demolition, electricity, valet and mail $2,152 plus interest. Insurer to
assess electricity costs
Hygienist and engineer reports $6,650
Non financial loss $5,400
2.4 Why is the outcome fair?
The policy provides cover for resultant damage caused by an escape of liquid. The
exchanged evidence indicates, on balance, the property was not correctly remediated which
allowed mould to spread.
It is fair the insurer covers the complainant‟s costs in this regard as set out in sections 2.1, 2.2
and 2.3.
Determination | Case number: 918141 Page 11 of 11
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fair ness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.