Home / IAG / Determination 918141

Determination 918141

Cash settlement of building repairs, temporary accommodation and other costs after escape of liquid (burst flexi hose) and mould damage

FirmIAG
Decided2024-01-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$535,041
Non-financial loss$5,400
Amount claimed—
SourceAFCA PDF

Summary

After a burst flexi hose caused water and mould damage, the insurer offered a cash settlement the complainant disputed. AFCA required a higher building settlement including the ensuite, extended temporary accommodation, and payment of several other costs plus $5,400 non-financial loss, while rejecting medical, interior designer and some contents claims.

The policy covers escape of liquid and the insurer's poor claims handling and under-assessment of repairs meant the accommodation limit did not apply and further resultant losses were payable, with interest under section 57 of the Insurance Contracts Act.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay interestpay non financial lossrefund fees or charges

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 918141 Financial firm Insurance Manufacturers of Australia Pty Ltd Determination | Case number: 918141 Page 1 of 11 Case number: 918141 11 January 2024 1 Determination overview 1.1 Complaint The complainant lodged a claim with the financial firm (the insurer) on 28 July 2021 after her property sustained water ingress following a burst flexi hose in the kitchen. The insurer assessed the claim and accepted the water ingress and mould damage. It stripped out various parts and undertook mould remediation. The insurer has now sought to cash settle the complainant for the resultant water damages. Part of the reason is there is existing mould damage and other pre-existing issues. The complainant dis putes the insurer‟s settlement. She says all of the existing mould is related to the claimed event or the insurer‟s claims handling. She is seeking compensation for all the outstanding repairs as well as additional temporary accommodation and other costs. 1.2 Issues and key findings Is the insurer’s settlement for the building repairs fair? No. The insurer‟s latest settlement did not include the ensuite. This should be included as there is information to show it is damaged. Therefore, the insurer should settle the building repairs as set out in section 2.1. Is the insurer’s settlement for temporary accommodation fair? No. The insurer should pay for the complainant‟s temporary accommodation until 10 months have passed after it has issued the cash settlement for the building repairs or repairs are completed, whichever comes first. This is because most of the complainant‟s temporary accommodation costs were due to the insurer‟s poor claims handling. What other costs should the insurer pay? The complainant incurred various costs in the course of this claim. Several of these should be covered. This is because they are losses caused by the claimed event or the insurer‟s poor claims handling. Other costs are not required to be covered by the insurer. 1.3 Determination This determination is substantially in favour of the complainant. Within 21 days of receiving notice the complainant accepts this determination, the insurer should issue payments set out in sections 2.1 and 2.3. The insurer is to settle the complainant‟s tempo rary accommodation costs as set out in section 2.2 and follow through with any actions noted in section 2.3. Determination | Case number: 918141 Page 2 of 11 2 Reasons for determination 2.1 Is the insurer’s settlement for the building repairs fair? Complainant is responsible for establishing a valid claim The complainant carries the initial onus to establish, on balance, the loss or damage being claimed falls within the scope of cover under the policy. Only once this is established does the onus shift to the insurer to show, on the balance of probabilities, an exclusion applies or that it is otherwise entitled to decline the claim in whole or in part. The complainant‟s policy is an insured events policy. That means it only responds where one or more of the listed insured events causes the damage. That cover is, however, subject to the remaining policy terms, conditions and exclusions. One of the listed insured events is the escape of liquid (from a fixed pipe). Insurer says not all damage is related to the event The insurer has recently agreed to pay $385,315.61. This is based on the complainant‟s cost minus the ensuite repairs as well as bedroom 3 and 4. The insurer says these areas were not damaged by the claimed event. Insurer liable for all damage except for bedrooms 3 and 4 The panel disagrees wit h the insurer‟s position to an extent. In NR‟s report dated 2 May 2023, evidence of mould was found in the ensuite and other damage in that area. This was supported by photos. The insurer has not explained why this apparent damage is not related to the claim. The panel accepts the ensuite should be included. There has been some variation in the nomenclature used to refer to bedrooms 2, 3 and 4. For the avoidance of doubt, in this determination, references to bedroom 2 refer to the room that shares a wall with bedroom 1 (i.e. the master bedroom, which was directly below the kitchen). Bedrooms 3 and 4 are understood by the panel to be the bedrooms with windows in the western wall of the house; that is, the two bedrooms furthest from the kitchen (referred to at one point by the insurer as the study and gym respectively). On bedroom 3 and 4, the panel notes NR‟s reports following demolition did not show these areas are damaged. None of the photos show damage to those areas. The reports focused on other areas. The panel has identified only three references to any of these bedrooms in NR‟s reports. First, in NR„s report dated 23 November 2022: [U]pon further investigation, the swelling of the flooring and skirting boards in bed 3 (adjacent to Bed 1) indicates to us that water and possible mould damage will have extended further than just bed 1 and 3. Further testing and assessment is advised and most likely will require further remediation works. (The panel notes it is more likely than not that the reference to bedroom 3 in this report is most likely a reference to what this determination calls bedroom 2 i.e. the room that shares a wall with bedroom 1.) Determination | Case number: 918141 Page 3 of 11 Secondly, NR‟s 19 April 2023 report states: We found mould on the ceiling plasterboard in bedroom 2 ceiling space underneath where a floor duct outlet opening allowed water to flow down from the first floor, and similarly in bedroom 3 … [W]e removed the floating floor in bedroom 2 and 3. This left a noticeable damp smell in the area, and the underlay had evidence of water damage, as did the floating floor with areas of swelling and mould. Please refer to the attached photos. However, there are no photographs labelled as depicting bedroom 3 or 4 in this report. Thirdly, NR‟s report dated 2 May 2023 states: With the extent of damage to the linings of the ensuite, and my professional opinion before commencing any works, the ensuite requires refurbishment, along with bedroom 2 and 3, all ceilings of the ground floor require refurbishment, this is in addition to the works already submitted. However, this does not of itself show there was damage to bedroom 3, let alone to bedroom 4. NR‟s report dated 28 March 2023 noted it is possible water damage extended to the plasterboards and floating floors in at least bedrooms 2 and 3. However, this was before the demolition works and was clearly an assumption. The demolition works that followed this only showed physical damage to bedrooms 1 and 2. They did not confirm damage to bedroom 3 or 4. Previous reports do not suggest these areas were physically damaged. Mould reports obtained by both the insurer and the complainant showed issues with bedroom 1 and 2, but not bedrooms 3 and 4. The insurer‟s scope of works and assessment did not identify damage to these two bedrooms. Given all this, the panel does not accept the information shows the damage claimed for bedrooms 3 and 4 have been substantiated. Further, the panel is not persuaded there is sufficient evidence to make out the complainant's allegations that there is damage to these roo ms, and even if it were, that any such damage was caused by the insurer‟s contractors. The panel notes it is possible NR‟s quote refers to what this determination calls bedroom 3, bedroom 2, and vice versa. This would align with the floor plan provided to AFCA by the complainant, and also explain the parenthetical description of bedroom 3 as “ adjacent to Bed 1 ” in NR‟s 23 November 2022 report. NR‟s total for bedroom 2 is $8,938.46; for bedroom 3 it is $11,870.22. It is the latter amount the insurer has discounted from the cash settlement offer. If the complainant accepts this determination, but the insurer has in fact discounted the wrong bedroom, she can also provide written confirmation from NR to that effect with her acceptance of this determination. In that event, the building cash settlement amount (before uplift and interest) would increase by $2,931.76 (because, if NR provides that confirmation, the insurer is only entitled to deduct $8,938.46, not $11,870.22). Determination | Case number: 918141 Page 4 of 11 Mould remediation and floorboard replacement costs The complainant has sought $50,330.50 for mould remediation in addition to NR‟s quote. Her spreadsheet that set out her claim for this referred to NR‟s demolition reports. However, NR‟s reports do not quote this figure. NR‟s second report dated 2 May 2023 only says: Mould remediation has been estimated to cost $8,900 in addition to my previous proposal This is substantively lower than the figure quoted. Further, the reference to “proposal” in NR‟s report was regarding NR‟s previous quote. NR latte r issued a quote dated 6 October 2023. The document refers to the „Proposal on the Remediation Works to your Home‟. It makes no reference that mould remediation is excluded or to be quoted separately. The report accompanying the 6 October 2023 quote says (our emphasis): This further revision of the works required has been compiled following revealing the full extent of the damage and mould conditions present in the home ... requiring further removal of (but not limited to) fittings, fixtures, tiles, plaster, ducting, insulation and remediation of mould found to be present. Reports were provided in April of this year (2023) to evidence the further works required. The costs associated with the works are noted below. Therefore, the panel is not persuaded $50,3 30.50 should be added to NR‟s figure. Instead, it appears NR‟s proposal is to fully repair the claim related damage. If that is the case, then it is not clear why this amount should be added. This similarly applies for the floorboard replacement cost of $30,059.08 for upstairs. The complainant has added this in addition to NR‟s proposal. If such replacement was necessary, it is not clear why it was not included given NR has quoted for floorboard replacement elsewhere and its proposal was for all the works required. Further, any such addition would require the panel reaching a state of satisfaction that (a) the upstairs floorboards require replacement, and (b) the need for that replacement arises from the insured event, and was not proximately caused by an excluded event (such as problems with the initial installation of the floorboards, or with water ingress through deteriorated windows). Competing evidence has been provided by the insurer and the complainant in relation to these matters. In circumstances wh ere the complainant‟s preferred builder has not seen fit to include this work in his scope, the panel does not accept the complainant‟s position is substantiated. Insurer should pay $479,282.72 plus interest The panel considers the insurer‟s latest offer should add back the ensuite for reasons articulated. This increases the amount to $435,711.56. The panel considers a 10% contingency ($43,571.16) should be added to account for unforeseen variations that would arise in such a complicated job. Further, interest should apply from one month after the quote was issued given it is likely to be outdated by that timeframe. Determination | Case number: 918141 Page 5 of 11 Accordingly, for the building repairs, the insurer should pay $479,282.72 plus interest in full and final settlement. Interest is payable pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Interest applies from 6 November 2023 until payment is made. (The panel notes the pre-interest amount may increase to $482,507.65 ($435,711.56 + $2,931.76 = $438,643.32, plus 10% uplift $43,864.33), in the event the incorrect bedroom has been deducted from NR‟s quote as set out above.) 2.2 Is the insurer’s settlement for temporary accommodation fair? Insurer should pay the complainant’s rates In its submission dated 15 May 2023, the insurer agreed to cover 26 weeks of additional accommodation at $1,000 per week. This followed an extension of two weeks. Presumably, the 26 weeks was to commence on or around 29 May 2023. The complainant disputes this. She says she should be provided temporary accommodation until the property is fit to be lived in. She also notes the following:  the insurer has covered her current fully furnished property at $2,383.35 per week  home rentals are currently very scarce  the amount of $1,000 per week would be insufficient to find a comparable rental home fully furnished  she signed an additional six month extension following the expiry of her previous agreement (around 18 April 2023) to provide stability for her and her son  it will likely take around 10 months to conduct all the repairs The policy provides temporary accommodation that is reasonable and appropriate for the complainant. The information shows the insurer agreed to cover the accommodation the complainant currently resides in. This shows it accepted that arrangement was reasonable and appropriate. The insurer has not substantiated that its offer of $1,000 per week was reasonable and appropriate having regard to the complainant‟s circumstances and based on available properties in the local area at the time. Th erefore, the panel agrees it is fair that any rate be based on the complainant‟s actual expense provided it is similarly in line with her current arrangement. Policy limit does not apply The panel also does not agree 26 weeks is fair. This period was based on the insurer initially relying on its offer based on R‟s scope of works. That was substantively lower than the amount payable in section 2.1. Even the insurer‟s current offer was not sufficient to fix the claim related repairs for reasons explained. In addition, the insurer does not appear to have made available any of the funds to allow the complainant to begin the claim related repairs. The panel acknowledges the policy contains a 12 month limit for temporary accommodation. However, the panel does not accept this limit applies in circumstances when these costs have been incurred due to the insurer‟s conduct rather than the claim. The panel considers the limit does not apply because:  additional damage and costs have been incurred due to the insurer‟s cla ims handling  the insurer has incorrectly assessed the extent of its liability under the policy, and Determination | Case number: 918141 Page 6 of 11  the complainant has spent a significant amount of time in temporary accommodation whilst challenging the insurer‟s position (and ultimately done so successf ully). Therefore, the panel considers it fair the temporary accommodation limit should only apply once the insurer has issued a cash settlement that fairly reflects the full extent of repairs required. Until then, any temporary accommodation costs incurred is not subject to the policy limit. Insurer is to pay temporary accommodation in the following way The complainant estimated the works would take nine months with an additional month for mould remediation. The insurer has not provided specific evidence to refute this estimated time to repair. Noting the extent of works required, and the fact the insurer allowed six months on its more reduced quote, that does not appear unreasonable. Given this, the panel considers it fair the insurer pays all the complaina nt‟s temporary accommodation expenses until the earliest of the following:  10 months have lapsed after the insurer issues its cash settlement as required under section 2.1, or  the repairs are completed. To the extent the complainant has herself paid for temporary accommodation, the insurer is to pay interest on those costs pursuant to section 57 from when they were incurred until payment is made. 2.3 What other costs should the insurer pay? Complainant is seeking the following costs The complainant has sought the following costs or amounts to be reimbursed:  soft furnishings - $101,700.90  unrecoverable items - $3,000  storage and removalist costs - $21,107.36  plants contaminated by mould - $654  medical costs - $73,238.90  demolition costs - $550  hygienist and engineer reports - $9,650  electricity costs – to be determined  valet bill - $1,160  mail redirection - $442  interior designer - $11,350 Soft furnishings The complainant broke this down in the following way:  Furniture (sofas, beds, cushions) - $44,291  Curtains and blinds - $40,000  Sheets thrown out, cushion, + throw - $5,811.90  Mattresses*3 before being removed - $11,598 The complainant said her fabric covered couches and mattresses, blinds, curtains, wooden beds (as well as bedside tables and drawers) were sitting in mould and should be replaced. Determination | Case number: 918141 Page 7 of 11 In support, the complainant provided an email from EVS dated 25 November 2022. This said various window coverings (13 pleated blinds, 6 drapes to two bedrooms and drapes to two windows) were affected and needed to be replaced. EVS said these items were stored in a container for contaminated items. The complainant believes other soft furnishings should also be replaced due to likely being contaminated. The insurer engaged VA to test the contents stored. This included the soft furnishings. VA produced a report dated 22 July 2022 that showed after extensive testing of the stored contents, including the soft furnishings, the only item identified with mould was a timber bed slat. VS said this could be cleaned. It does not appe ar VA‟s test included the blinds and curtains. The complainant‟s hygienist (HH) did not identify mould on all the soft furnishings claimed. Whilst HH noted any semi porous or porous items with visible mould should be discarded, there is nothing to indicate HH identified this on the soft furnishings. Specific testing done by VA indicates mould infestation was not evident. The panel is persuaded the curtains and blinds need replacement. This is supported by EVS and not refuted by the insurer. The panel is not persuaded the complainant has shown the balance of the items need to be replaced. VA‟s report and testings say otherwise. There is no other expert information to show such extensive replacement is necessary. The complainant provided a quote from NI for the replacement of the blinds and curtains totalling $39,902. It is not clear if the insurer has assessed the quote. Despite this, the panel acknowledges the complainant has disclosed the quote and this was exchanged with the insurer who had an opportunity to comment. Given the longstanding nature of this complaint, the panel considers it fair that a cash amount be paid in settlement of these issues. In this regard, the panel accepts the complainant‟s quote dated 21 November 2022 from NI be accepted. Whilst t he complainant‟s spreadsheet in November 2023 referred to $44,000, it is not clear what this is based on. The panel prefers to have regard to the quote provided. The insurer is to pay $39,902 in settlement of these issues plus interest pursuant to section 57 of the Act. Interest applies from 21 December 2022, being one month after NI‟s quote, until payment is made. Unrecoverable items The insurer has agreed to pay $1,000 based on S‟s list of unrecoverable items. The complainant is seeking $3,000. The complainant has not substantiated this amount. The list of items include various kitchen items, a rug, batteries and other implements. They have not been priced or quoted by either party. However, they do not appear to be overly expensive items. The panel is the refore not persuaded the complainant has shown the insurer‟s offer is unfair. The insurer can settle these items based on paying $1,000 as offered. No interest is payable given the complainant has not shown the insurer‟s offer is unfair. Determination | Case number: 918141 Page 8 of 11 Storage and removalist costs The complainant is seeking an additional 12 months storage for her contents. She has estimated this to be $13,107.36. This was based on a discussion with the insurer about how much it is costing the insurer to currently store the goods. It appears the storage costs are currently being incurred by the insurer. For the sake of expedience, rather than a cash settlement, the panel considers it fair the insurer continues to pay and store the contents until the earliest of the following:  ten months have passed after the cash settlement is issued as directed in section 2.1, or  the repairs are completed. For the removalist costs and returning the stored contents, the insurer has agreed to pay for this. The complainant has sought $8,000 in this regard ($7,000 for the return of the contents and $1,000 for removalist). However, as the contents are being stored in the insurer‟s premises, it can facilitate and pay for their return costs. For the removalist, the complainant has provided a quote from the previous one which was over $1,000. This shows the amount sought is reasonable. This should be paid. No interest is payable as the cost has not been incurred yet and there is nothing to indicate the amount will increase. Plants contaminated by mould The complainant is seeking for her plants to be replaced that are contaminated. The insurer has disagreed. The insurer says there is no information to show they were damaged by the incident. The complainant has provided photos showing there is mould on them. The panel accepts it is fair this be reimbursed. The photos show mould, which indicates they are likely damaged from the claim. The complainant has provided a screenshot quote in support for the amount claimed ($654). There is nothing to indicate this is unreasonable. The insurer should pay this amount plus interest. Interest is payable from 25 April 2023 (being when the estimate expired) until payment is made. Medical costs and interior designer The complainant is seeking a significant amount of medical costs. She has attributed this to the claimed event and her claims experience. The insurer has noted the policy excludes this type of loss. This would apply for medical costs associated with the claimed event. Therefore, the only possible way the complainant could claim for this is if the information shows this was all caused by the insurer‟s unreasonable claims handling, not the claimed event itself or other factors (such as pre-existing conditions). The information does not show this. There is minimal medical information (such as reports or otherwise) to show these costs were caused by the insurer‟s unreasonable handling of the claim compared to other factors. These costs are not payable. For the interior designer, the complainant is seeking this to „reimagine and bring together the empty shell that is currently my home‟. The panel does not accept this is payable. The insurer‟s obligation is to restore her, as close as possible, to the position she was in prior to the claimed event. This would not include a cost to redesign the interior of the home. Determination | Case number: 918141 Page 9 of 11 Demolition, electricity costs, valet bill and mail redirection The complainant has provided invoices to show she incurred the costs of demolition, valet and mail redirection. The insurer has not provided a specific submission that these costs are not payable. These should be reimbursed if they have not already. Interest is also payable from when the costs were incurred until payment is issued. For the electricity costs, this has not been particularised. To the extent the complainant can show she has incurred additional electricity costs beyond those she otherwise would have paid if residing in her home, this should be payable. The parties are to work together to calculate a fair amount. Hygienist and engineer reports Under Rule D.5, AFCA may decide a financial firm contribute to the professional costs incurred by a complainant in the course of a complaint. These costs can be awarded if the complainant needed an expert to understand or establish their claim. These costs are normally capped at $5,000 unless exceptional circumstances apply. The hygienist (HH) provided several reports on this claim. HH was initially engaged by the complainant who was concerned by the existence of mould and its impact on her health. HH‟s initial reports confirmed there were mould issues and that the property was not safe to reside in. These initial reports assisted the complainant to understand and establish her claim. Given this, the panel considers it fair the insurer contribute up to $5,000 for HH‟s reports. However, the panel does not accept exceptional circumstances apply as the later reports were not as probative. This is because the insurer had engaged VA shortly after HH‟s initial reports and identified similar issues to HH following that. The engineer (JC) was engaged to review the state of the windows and their contribution to the mould. The insurer‟s position was these were contributing to the mould issues. JC provided a report that refuted this. It is not apparent if this report resulted in the insurer no longer pursuing this issue. However, the panel accepts it was reasonable for the complainant to engage JC to assist her on that point. Therefore, his report fee should be reimbursed. Non-financial loss The insurer has agreed to pay $5,400. This is the maximum amount AFCA can award. The complainant has not sought a greater amount. It is fair this is paid given the extent of works outstanding and the time that has passed. Insurer is to pay and do the following Therefore, after careful consideration of all the exchanged information, the insurer should pay the $56,758 plus interest and do the various things set out above. These particulars are summarised below: Item Amount Soft furnishings $39,902 plus interest Unrecoverable items $1,000 Determination | Case number: 918141 Page 10 of 11 Storage and removalist $1,000 plus insurer to cover storage and relocation of stored contents Plants $654 plus interest Medical costs and interior designer $0 Demolition, electricity, valet and mail $2,152 plus interest. Insurer to assess electricity costs Hygienist and engineer reports $6,650 Non financial loss $5,400 2.4 Why is the outcome fair? The policy provides cover for resultant damage caused by an escape of liquid. The exchanged evidence indicates, on balance, the property was not correctly remediated which allowed mould to spread. It is fair the insurer covers the complainant‟s costs in this regard as set out in sections 2.1, 2.2 and 2.3. Determination | Case number: 918141 Page 11 of 11 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fair ness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.