1.1 Complaint
The complainant holds a home insurance policy with the financial firm (insurer). She lodged a
claim on 8 March 2022 for internal water ingress damage, as well as external cracking
damage, caused by a storm.
The insurer partially accepted the claim. It has paid the sum insured for damaged contents
and provided an offer for the internal water ingress damage. It says external damage was not
caused by the storm and has declined this part of the claim.
The complainant says the insurer should urgently settle the claim for building damage, that it
reneged on an increased offer for contents, and the current contents offer is inadequate. She
also says the insurer ignored mould contamination which caused health issues and further
damaged contents, and failed to arrange temporary accommodation.
1.2 Issues and key findings
How should the claim be settled?
The available information shows, on balance, the external damage is pre-existing and was
not caused by the storm. The insurer is not liable for this damage.
There is no dispute the insurer is liable for internal building damage. The insurer has provided
a cash settlement offer which is fair.
The insurer caused avoidable delays, resulting in further damage to contents. As such, it is
not entitled to limit the contents settlement to the sum insured.
Is the insurer liable for compensation?
The insurer caused avoidable delays, and failed to offer temporary accommodation for a long
period despite being aware the property was potentially a health risk and uninhabitable. It
should pay $5,400 in compensation for non-financial loss.
1.3 Determination
This determination is partially in favour of the complainant.
If the complainant accepts this determination, the building damage and temporary
accommodation should be settled in the manner set out in section 2.1.
The insurer should also pay $77,601.99 for contents and $5,400 compensation for non-
financial loss within 14 days of receiving notice the complainant accepts this determination.
Determination | Case number: 917674 Page 2 of 6
2 Reasons for determination
2.1 How should the claim be settled?
Complainant has onus to establish a valid claim
The complainant has the onus to establish the claimed loss is a result of an event covered
under the policy. This must be established on the balance of probabilities, meaning that it is
more likely than not.
If the complainant can establish this, the onus then shifts to the insurer to establish it is
entitled to decline the claim.
Policy covers storm damage, subject to exclusions
The policy covers loss or damage caused by certain insured events listed in the policy
wording. The policy offers optional cover for accidental damage, however the complainant
does not have this option.
The insured events include ‘Storm, cyclone, rainwater or run - off’. Cover is subject to
exclusions and conditions.
Insurer accepts liability for internal damage only
There is no dispute the property was affected by a storm on 21 February 2022. Water
inundated the home from ceilings, windows and doors, resulting in flooding of a downstairs
area and garage.
The insurer accepted liability for damage directly caused by water ingress, as well as
resulting mould remediation, to the internal building and contents. It declined cracking to a
balcony waterproofing and tiles, a swimming pool and an external r endered brick wall , as well
as deterioration of a front entry door. It says this external damage pre - dates, and was not
caused by, the storm.
Insurer is not liable for external cracking damage
The insurer arranged for builder JL to assess the damage. JL was unable to determine if
cracking to external tiling, concrete and rendering, or the swelling and jamming of the front
door, was directly related to the storm.
The insurer subsequently engaged engineer DW to determine the cause of cracking to render
walls, stairs leading to pool, the retaining wall and cracking tiles and concrete. DW says:
some cracking was visible in online street view images which pre-date the loss
cracking to tiles on a lower level veranda are aged and caused by shear failure under
vertical loading, that there was evidence of previous repair, and this damage is aged and
not due to a one off event
horizontal cracking to a lower level pool area retaining wall is aged in appearance, with
evidence of prior repair, and is visible in street view images which pre-date the loss
horizontal cracking to northern lower rendered wall is aged with evidence of prior repairs,
and lacks vertical movement joints; cracking is related to corrosion of an internal steel
beam
The complainant has not provided any reports or information which contradicts these findings.
Having carefully viewed the images provided by DW, I agree that some cracks appear to pre-
Determination | Case number: 917674 Page 3 of 6
date the loss. I also note that the crack on the northern lower rendered wall is uniformly
horizontal, and as such accept this relates to corrosion of a straight, internal steel beam.
The insurer is not liable for this damage as the available evidence does not show it was
caused by the storm.
Insurer ’s cash settlement offer is reasonable
The insurer recently provided an offer to cash settle the accepted repair items for $65,250.47.
This was based on JL ’s quote for $56,739.54 with a 15% contingency ($8,510.93).
The complainant has disputed this. She said the contingency is way below inflation and price
increases beyond that quoted.
I am not persuaded by the complainant’s position. This quote was issued on 3 March 2023 . It
would therefore be based on rates at the time, which is relatively current. There is no
information to show the rates for labour and material in the quote are under-priced. It includes
some level of mould remediation. It also provides a contingency of 15% which should account
for any potential variances in the work. There is nothing to indicate the scope of works is
unreasonable.
Therefore, I accept the in surer’s cash settlement offer is fair. This should be paid within 14
days of the insurer receiving notice the complainant accepts this determination, minus any
outstanding policy deductibles (e.g. excess).
Insurer is not entitled to limit contents settlement to sum insured
The insurer issued a cash settlement offer of $77,601.99 on 13 September 2022 for damaged
contents. An accompanying cash settlement offer fact sheet listed the relevant sum insured
incorrectly as $1,200,000, however the sum insured shown on the policy schedule is $50,000.
It subsequently reduced this offer to $61,050, noting the sum insured of $50,000, and
including a $5,000 allowance for removal of debris, $500 for food spoilage, and paying $5,500
GST.
The complainant says the insurer should honour its initial offer of $77,601.99.
I have considered whether, in the circumstances, the insurer should be bound to its initial
offer. The parties did not sign a strict and binding settlement agreement, with terms limiting
the insurer’s offer to retract. The principles of estoppel and election do not apply given the
complainant has not demonstrated the insurer’s retraction caused a loss, and the insurer was
not exercising inconsistent rights under the policy. As such, the insurer is not bound to its
earlier offer for these reasons.
However, the complainant also says the insurer’s inaction has led to contents which were
undamaged after the storm becoming affected by mould. If this assertion is substantiated,
then losses caused by the insurer’s actions is not limited by the sum insured.
The claim was lodged in March 2022. CC attended in March, and reported staining and mould
had begun to appear, that a bathroom ceiling had black spotting and a damp and mouldy
smell. Photographs taken by CC show contents, not visibly damaged, stacked neatly in a
room.
Claim notes show the complainant raised concerns with mould, including impacts to her
health and that of her daughter, in April and May 2022. These concerns were restated
throughout the life of the claim.
Determination | Case number: 917674 Page 4 of 6
The insurer obtained a report from hygienist and mycologist VA on 12 May 2022. VA
described an abnormal fungal environment, excessive mould growth in an air conditioner,
Pen/Asp spores exceeding tolerances, and warned that individuals entering the property who
have concerns or are vulnerable should seek medical advice. VA also notes that mouldy
contents left in a bedroom have resulted in this room having the highest level of
contamination.
The submissions indicate a somewhat deteriorated relationship between the parties. The
insurer says the complainant refused its contractors entry on numerous occasions. I accept
this frustrated the insurer’s abil ity to efficiently manage the claim. However, it remains the
insurer has not adequately responded to the contamination issue and this likely caused
further damage to contents.
Given inundation was from rainwater, from a few areas, and it appeared various contents
were not damaged at that time, it is unlikely the loss of contents caused by the storm
exceeded the sum insured. Instead, it is likely there was additional damage caused by the
insurer’s failure to address the contamination earlier. As such, I consider the insurer may not
rely on the sum insured to limit its liability for damaged contents, and is therefore liable for
$77,601.99.
Insurer should cover temporary accommodation for the repair period
There is no dispute the property is contaminated with mould. The submissions indicate this
may cause health issues in certain circumstances. The insurer acknowledges this, having
apologised for failing to arrange temporary accommodation given the condition of the
property.
The insurer has recently sought to arrange temporary accommodation. This has not
transpired, primarily because of communication issues between the complainant and the
insurer’s temporary accommodation provider.
Regardless, the complainant has not incurred a cost in arranging temporary accommodation.
Therefore, the insurer is not required to cover any accommodation costs to this point.
However, the policy offers alternative accommodation when a home is lived in when a loss
occurs, and is uninhabitable as a result. Given mould contamination and health issues
described by the complainant, I accept the property is uninhabitable. The insurer should
therefore pay fair and reasonable temporary accommodation costs from the date this
determination is accepted, until the date repairs are expected to be complete.
Complainant should lodge new claim for additional water entry
In recent submissions, the complainant referred to additional water entry to the property. The
insurer says a new claim should be lodged. It also notes a physical assessment has not been
completed.
I agree with this course of action. The available information does not clearly show it is
connected to the outstanding claim related repairs as opposed to the other matters. Further,
there is minimal information to determine if the damage is covered or excluded under the
policy.
Determination | Case number: 917674 Page 5 of 6
2.2 Is the insurer liable for compensation?
AFCA may award compensation in certain circumstances
Under our Rules, we can award up to $5,400 compensation for non-financial loss. We may
award compensation if a complainant has suffered an unusual degree of physical
inconvenience, time taken to resolve the situation or interference with his or her expectation
of enjoyment or peace of mind due to the insurer’s handling of the claim.
We take a conservative approach to compensation and expect a complainant to bear a
normal degree of inconvenience during a claim.
Complainant has raised concerns about handling of claims
The complainant has provided extensive submissions outlining her concerns with the
insurer’s handling of the claim. Her concerns include that the insurer:
ignored her concerns regarding mould contamination
failed to offer alternative accommodation despite potential health risks posed by mould
did not adequately manage the claim, resulting in avoidable delays
communicated poorly and ignored her concerns, causing stress and further delay.
Insurer is liable for $5,400 compensation
I accept the insurer’s claims handling in this regard has been poor. It is clear the home had
been contam inated from mould. This was confirmed in VA’s report. The complainant had
expressed concerns about her health. Despite all this, no temporary accommodation was
offered until much later even though the complainant was plainly entitled to this.
In addition, the insurer failed to adequately scope the works to address the mould
contamination earlier. Instead, this remained outstanding for a fair period of time and
prolonged the claim experience.
I note the insurer has recently said the above issues are due to the complainant failing to do
required maintenance or engage with it. I do not agree. There is mould connected with the
claim. This has remained outstanding for a long period of time. I have set out instances when
the insurer has not progressed the claim. Therefore, I am not persuaded the above issues are
all, or mostly, caused by the complainant.
Further, I accept this all caused a significant degree of inconvenience and interference to the
complainant. She has consistently expressed she is medically vulnerable to these conditions
and feels she has not been heard.
Therefore, I consider if fair in all the circumstances the insurer pays $5,400 in non-financial
loss given these factors.
Determination | Case number: 917674 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim