Determination 917670
Claim declined for water ingress damage to switchboard room under existing defects exclusion endorsement
Summary
A strata corporation claimed for water damage to its residential switchboard room, and the insurer declined it under an existing defects exclusion endorsement. AFCA found in favour of the insurer.
The damage was more likely than not caused by water ingress defects identified in R's May 2021 report, so the endorsement excluded the claim.
Issues
- Claim denial primary · not upheld“The panel accepts the insurer is entitled to deny the claim, including damage to the building and temporary accommodation.”
- Product terms interpretation secondary · not upheld“relevant defect is the water ingress through the roof and walls; drip trays are merely temporary measures”
Subjects and remedies
home or building damageno remedy
Related
Text of the determination
Determination
Case number 917670
Financial firm Chubb Insurance Australia Limited
Determination | Case number: 917670 Page 1 of 8
Case number: 917670 31 July 2023
1 Determination overview
1.1 Complaint
The complainant is a strata corporation, represented by the treasurer of the Owners
Corporation’s executive committee , which holds a commercial strata insurance policy (policy)
with the financial firm (insurer).
On 20 October 2021, the complainant lodged a claim seeking cover for loss and damage
resulting from a water ingress event in the insured building’s residential switchboard room on
17 October 2021.
The insurer assessed the damage and declined the claim. The insurer says the damage to
the electrical switchboard was caused by defects identified by consultants ‘R’ in May 2021 .
This policy was endorsed to exclude such damage relating to defects identified in R’s Report.
The complainant disagrees with the insurer’s decision. She says no defect was noted in
relation to the residential power room (room) by R. The complainant says the items from
which the water escaped had not been installed at the time of R’s assessment and therefore
cannot be accepted as being defects relevant to R’s r eport.
1.2 Issues and key findings
Is the insurer liable for the damage?
No. Given the exchanged material and the circumstances of the damage, the insurer is
entitled to rely upon the terms and conditions of the policy to deny the complainant’s claim.
Why is the outcome fair?
It is fair because the insurer is entitled to rely on the policy terms to assess its liability under
the complainant’s claim. The exchanged material has shown it is more likely than not that the
damage to the insured building and associated losses, are due to circumstances excluded
under the policy.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to deny the complainant’s claim and is not required to take any further
action.
Determination | Case number: 917670 Page 2 of 8
2 Reasons for determination
2.1 Is the insurer liable for the damage?
No. Given the exchanged material and the circumstances of the damage, the insurer is
entitled to rely on the policy to deny the complainant’s claim.
The policy is an accidental damage contract of insurance
The insurer provided the complainant with the relevant policy documentation including the
product disclosure statement (PDS) and certificate of insurance (COI). Therefore, the panel
accepts the insurer is entitled to rely on the policy provisions to assess its liability under the
claim.
The policy covers the insured property against damage that occurs within the period of
insurance. Section 1 of the policy, relevant to the consideration of this complainant, defines
damage as:
Damage
means direct physical:
• loss of, or
• destruction of, or
• damage to
the Property Insured from any sudden and accidental cause except as hereinafter
excluded.
Given the above, the panel is satisfied that the policy is an accidental damage contract of
insurance. Cover under the policy is subject to the conditions, limitations and exclusions
specified in the COI and PDS.
The panel notes, in addition to the general and specific policy exclusion provided in the PDS,
the policy is also subject to an endorsement noted in the COI. This endorsement excludes
cover for damage caused by defects identified by R in an assessment of the insured building
in May 2021. The endorsement states:
BCE 24 Existing Defects Exclusion
Policy 1 exclusions applicable to Policy is amended by adding the following
exclusion to excluded causes:
Policy 1 of this package does not cover damage directly or indirectly caused by,
occasioned by arising from:
Determination | Case number: 917670 Page 3 of 8
4.5 Defects, deficiencies or faults relating to the building as identified or itemised
in the report by R Group of Companies, referenced as Part 6; detailed defect
report (and sent to [FF] by email on 13 September 2021).
All other terms and conditions remain unchanged.
Circumstances giving rise to the claim
The complainant lodged the claim for water damage to the power board in the room, said to
have occurred over 16 and 17 October 2021.
Exchanged material shows:
in July 2021, there was an incident of water ingress in the room which tripped the electrical
switchboard and caused a power outage in the building
the complainant arranged repairs which included installation of an additional drip tray and
a runoff pipe that was then connected directly into the building’s stormwater system. A
claim was not lodged under the policy
on 16 October 2021, there was another incident of water overflow from a drip tray in the
room causing power outage. The complainant arranged repairs and power was restored
on the morning of 17 October 2021
shortly after the power was restored, another incident of power outage occurred. The
complainant appointed plumber ‘ O ’ and electrician ‘ H ’ to investigate
upon inspection, H noted the cause of the outage on 16 October 2021 was due to water
emanating from above the switchboard into the cabling of the main switch, tripping the
power supply
H says the cause of the outage on 17 October 2021 was due to excess water being
pumped through the drainage pipe connecting the stormwater pipework and the additional
drip tray (installed in around September 2021). This caused the drip tray to overflow and
'flooded the top of the main switchboard'
the excess water was due to a malfunction in stormwater drain pump after the power
outages and power restorations. This created back pressure which forced water back
along the pipe network and into the run-off pipe and drip tray installed in the room.
Parties disagree on cause of damage
The insurer notes that R’s assessment in May 2021 identified numerous concerns and
defects relating to the insured building. The insurer says, given these concerns and defects,
an endorsement was placed on the policy which excludes damage caused by defects
identified in R’s report.
Relevantly, in its report relating to the basement carpark where the room is located, R says:
It was noted at the time of inspection that there are numerous drip trays installed
throughout all levels of the basement car park. These drip trays are mostly
beneath the control joints in the concrete slab…
Drip trays are only installed where there is unwanted and uncontrolled water
ingress into a building, otherwise there is no reason for them to be installed. They
are only a temporary make safe measure and will do nothing to address the root
cause of the issue
Determination | Case number: 917670 Page 4 of 8
The presence of so many drip trays is worrying as it indicates that water ingress is
a widespread issue …
Recommendation:
The builder is to address the points of water ingress that required the installation
of these drip trays throughout the basement car park.
Once these areas have been rectified above, these drip trays can be removed.
The insurer says the relevant defect identified was the failure of the roof and walls to prevent
water penetration that could cause undue dampness or det erioration of building elements .
The insurer notes R’s view that the presence of numerous drip trays c onfirms the widespread
water ingress issues . The insurer says it is not the installed drip trays that are the defect but
rather the failure of the building’s roof and walls to prevent water ingress which is the relevant
defect.
In the insurer’s opinion, the mechanism or chain of events le ading to the overflow of water
i nto the room and electrical switchboard are directly and/or indirectly related to the water
ingress issues and associated deficiencies and defects noted in the basement car park.
The compl ainant refutes the insurer’s position and says R’s report does not note any potential
water ingress related defects in relation to the room. Further, the cause for the excess water
was not the defects identified in R’s report but rather it was the malfunct ioning of the
stormwater drainage pump after the second power outage on 17 October 2021.
The complainant says the additional drip tray and run-off pipe installed in the room were not
present at the time of R’s inspection in May 2021. Therefore, they canno t have been identified
as a defect for the purpose of R’s report and resultant endorsement placed on the policy.
The complainant accepts R did comment on drainage within the basements being an issue
due to a lack of fall to the drains, however, that R did not comment on any potential for water
penetration into the room. Given the potential for a major problem from water ingress into the
room, the complainant says R would have carefully assessed the room.
It is fair that the insurer be permitted to rely on R’s report
There is no dispute R raised several concerns and identified various building defects in May
2021. This includes concerns and information relating to the present water ingress issues and
noted drip trays. R’s concerns include but are not limited to:
the presence of numerous drip trays installed throughout all levels of the basement carpark
which are mostly beneath the control joints in the concrete slab
drip trays are only installed where there is unwanted or uncontrolled water ingress into a
building, otherwise there is no reason for them to be installed
they are only a temporary make-safe measure and will do nothing to address the root
cause of the issue.
the presence of so many drip trays is worrying as they indicate that water ingress is a
widespread issue
The panel acknowledges the complainant’s position that the proximate cause for the damage
is an escape of liquid event caused by the back flow of water due to a malfunction in the
stormwater drainage pump on 17 October 2021. Also, that the insurer cannot rely on the
Determination | Case number: 917670 Page 5 of 8
policy endorsement given the drip tray and run-off pipe in the room were not present at the
time of R’s assessment and cannot be considered defects identified by R.
The panel does not agree with the complainant’s position. This is because the panel is
satisfied the that the relevant defect, for the purpose of the claim and consideration of this
complaint, is the clear issue of water ingress through the roof and walls of the building. The
drip trays and any associated run-off pipes are merely temporary measures completed in the
attempt to prevent damage due to the defect.
The panel is satisfied, in the absence of any persuasive information to the contrary, it is fair to
accept the earlier power outages in July 2021 and 16 October 2021 were due to this defect.
Further, that it is reasonable to form the view these power outages and associated restoration
works led to the malfunction of the stormwater drainage pump on 17 October 2022. Given
this, the panel accepts the proximate cause for the damage to the building is the water
ingress related defects identified by R in May 2021.
The complainant has not provided any compelling information supporting any attempts or
works that were authorised after May 2021 to rectify these defects. Rather, it appears the
complainant through the appointed consultants continued to authorise installation of further
drip trays, despite being placed on notice this was not a recommended but rather only a
temporary solution.
Accordingly, for these reasons, the panel is satisfied:
it is fair that the insurer be allowed to rely on R’s defect report
it is fair that the insurer be allowed to rely on the policy endorsement because the relevant
defect (wa ter ingress through the building’s roof and walls) in question was identified by R
in its report
it is fair to accept the policy endorsement applies to the claim, given the endorsement was
current at the time of policy renewal for the 2021- 2022 period.
Insurer is entitled to decline the claim
The panel has carefully considered the information provided by the parties, together with the
policy wording and endorsement. In line with the exchanged information and the matters
considered above, the panel is satisfied it is more likely that the damage is due to one or
more of the defects and deficiencies identified by R. The panel is not persuaded by the
complainant’s position as there is an absence of persuasive supporting information.
The panel accepts the insurer is entitled to deny the claim. This includes damage to the
insured building as well as associated losses including temporary accommodation (TA).
Cover for TA is not available where it is required due to the insured building suffering damage
by an excluded cause, which is the case in this instance.
The insurer has put forward other alternative positions in support of an entitlement to decline
the claim. However, given the panel is satisfied the insurer has established the entitlement to
rely on the policy endorsement, consideration of the alternative positions is not necessary.
2.2 Whys is the outcome fair?
Outcome is fair in the circumstances
It is fair because the insurer is entitled to rely on the policy terms to assess its liability under
the co mplainant’s claim. The exchanged material has shown it is more likely than not that the
Determination | Case number: 917670 Page 6 of 8
damage to the insured building and associated losses, are due to circumstances excluded
under the policy.
Determination | Case number: 917670 Page 7 of 8
3 Supporting information
3.1 The AFCA processes
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant policy endorsement and provisions in the PDS
Section 1: Property Damage
Cover
The Company will pay for Damage occurring during the Policy Period to Property
Insured shown in the Schedule caused by or resulting from a cause not otherwise
excluded.
At the option of the Named Insured, the Company shall either:
Determination | Case number: 917670 Page 8 of 8
• reinstate or replace the Building (or any part of it that sustains Damage ); or
• pay the value of the Building (or any part of it that sustains Damage ) at the time
of the Damage having regard to physical deterioration, physical depreciation,
obsolescence or depletion.
...
Policy 1 - Section 2: Temporary Accommodation Expenses and Loss Of
Rent
Loss of Rent and Temporary Accommodation
The Company will pay Loss of Rent or Temporary Accommodation (including
Emergency Accommodation) resulting from interruption of or interference to Your
Unit consequent upon Damage to the Building caused by or resulting from a
cause not otherwise excluded that occurs during the Policy Period.