Dispute over the scope of repairs and cash settlement amount after storm damage, and handling of the claim
Summary
A homeowner disputed the scope of works and cash settlement offered by her insurer after a tree fell on her house in a storm, and alleged mishandling and misconduct. AFCA found for the insurer, finding the $6,267.88 offer fair and the claim properly handled.
The insurer's cash settlement correctly reflected the covered repairs under the policy, including a compliant 63 amp breaker, and the complainant's allegations of mishandling and fraud were not substantiated.
Issues
- Claim amount dispute primary · not upheld“insurer's assessment of damages required to finalise the storm damage is fair and reasonable; cash settle by payment of $6,267.88”
- Poor claim handling secondary · not upheld“The complainant has not shown the insurer has mishandled the claim.”
- Delay secondary · not upheld“initial delay with the first contractor was understandable and acceptable given the state of the repair industry”
- Repairs or contractors secondary · not upheld“complainant says SOW inadequate; contractor placement of mains box and 63 amp breaker found compliant and appropriate”
- Unfounded fraud allegation secondary · not upheld“allegations of fraud, corruption and concealment not supported by clear, cogent and convincing evidence”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
Text of the determination
Determination
Case number 917576
Financial firm Insurance Manufacturers of Australia Pty Ltd
Determination | Case number: 917576 Page 1 of 7
Case number: 917576 7 November 2023
1 Determination overview
1.1 Complaint
The complainant lodged a claim under her home building policy held with the financial firm
(the insurer) after a fallen tree damaged the insured property during a storm on 29 October
2021.
The insurer accepted the claim and arranged for a contractor in conjunction with J (power
authority) to complete a ‘make safe’ process. The insurer also agreed to carry out a second
contractor’s assessed repairs pursuant to a scope of works (SOW).
The complainant is dissatisfied with the overall claim management process and, amongst
other things, says the SOW is inadequate.
1.2 Issues and key findings
Has the insurer correctly assessed its liability under the claim?
Yes. I am satisfied the insurer’s settlement offer correctly includes all required repairs to be
conducted under the policy coverage. I am satisfied the settlement amount is a fair reflection
of the cost of these repairs.
Was the claim handled appropriately?
Yes. Given the state of the repair industry at the time of the event, the initial delay with the
first contractor was understandable and acceptable. The information provided establishes the
insurer (a) adequately addressed the concerns raised by the complainant, and (b) handled
the claim in a proper and reasonable manner.
Why is the outcome fair?
The storm in cident and its impact on the complainant’s property and electricity supply would
have been most disturbing for the complainant. The insurer’s cash offer, however, allows for
the cost of claim related repairs and contingencies in accordance with the policy coverage. It
would not be fair to require the insurer to pay for costs not covered under the policy.
1.3 Determination
This determination is in favour of the insurer. Within 14 days of notification of the complainant
accepting this determination the insurer is to:
pay the complainant $6,267.88 as previously offered in full and final resolution of this claim
and complaint.
Determination | Case number: 917576 Page 2 of 7
2 Reasons for determination
2.1 Has the insurer correctly assessed its liability under the
claim?
Yes. I am satisfied that the repair settlement offered correctly reflects the insurer’s liability for
the remaining repairs.
The complainant bears the onus of proof to establish a valid claim
The initial onus is with the complainant to establish, on the balance of probabilities (that it is
more likely than not), that she has a claim for loss or damage that falls within the terms of the
policy. This is known as a valid (or prima facie) claim.
The insurer has accepted that the complainant has a valid claim under the policy for storm
damage. The onus is therefore on the insurer to establish, on balance, the application of a
policy exclusion or that it is otherwise entitled to decline the claim under the policy.
The insurer has assessed the damage for which it is liable
The insurer had the first contractor partially complete the works necessary to repair the storm
damage in conjunction with J. There were issues with this contractor carrying out necessary
works. The insurer provided an SOW from another contractor outlining the work required to
finalise the remaining repairs covered under the policy.
The builder quoted $4,389.90 to finalise these repairs. The insurer added an increase of 20%
as a contingency for additional repair costs. The total repair cash settlement offered by the
insurer is $6,267.88. This includes an additional $1,000 amount as a goodwill offer to the
complainant.
The SOW includes the supply and installation of a 63 amp circuit breaker to meet compliance
for the existing 16 mm mains cable. However, as a cash settlement offer has been made the
complainant can arrange for another circuit breaker if she can have an electrician install one.
The SOW does not include further work on restoring the level of power supply.
There was a requirement for a circuit breaker compliant with Australian
Standards
It would appear from the information before me that this complaint has escalated from a
difference of opinion between the complainant and the insurer’s contractor over the
placement of a mains power box in its original position to other issues in respect to work done
on the complainant’s power supply. Prior to the storm, the complainant’s property was fitted
with a mains power switch that was rated to 100 amps. This was required and compliant with
regulations at the time it was installed. The complainant says the insurer is required to
replace this damaged item with another mains power switch that is rated at 100 amps.
The complainant says that the installation of a 63 amp breaker was a down grading of her
existing safety switch from a 100 amp to 63 amp. I do not agree with this contention.
According to a report by an electrician contracted by the insurer, he attended the
complainant’s proper ty on 25 August 2022 with a representative of J, the power authority. It
was then agreed that there was a need to replace the property’s 100 amp switch with a load
peak main switch of 63 amps.
Determination | Case number: 917576 Page 3 of 7
The reason for this was that the complainant’s current mains ca ble from overhead mains to
the property’s power panel was 16 mm. This required the protection of an 63 amp current
breaker that met Australian Standards, AS 3008 1.1. 2017 Table 4.
An examination of the relevant Australian Standards in respect to electricity works shows they
have been amended in recent years. Research indicates that 16 mm cables should have 63
amp circuit breakers or safety switches.
I am satisfied (a) the positioning of the mains power box was ultimately the responsibility of
the contracto r’s electrician, (b) the property’s existing safety switch or circuit breaker had to
be replaced with a 63 amp mains power switch to comply with current Australian electrical
standards as the current switch was no longer compliant, and (c) the insurer cannot require
its electrical contractor to replace a power switch which he believed was not compliant with
Australian Standards.
The insurer is not required to repair the mains power box line or cable
During the storm a power cable and mains power box were damaged and required repair or
replacement. The complainant believed the mains cable from the overhead mains box to the
metre panel had been altered at the time of the ‘make safe’ process after the storm. She has
provided no evidence of this.
The insurer obtained confirmation from its registered electrician who had attended the
property that the incoming overhead supply line had not been changed and no change to the
power amperage had occurred. This was confirmed by a previous electrician who had
inspected the system.
The complainant also believed the overhead cable from the street to her property had been
altered by J at the time of the ‘make safe’. The incoming power line from the street to the
complainant’s home and its overhead fuse box belongs to J, not the complainant. The insurer
says that it was not covered by her policy.
The complainant has provided no evidence of this alleged change. However, the attending
electrician believed that if J had changed the cable it would have adhered to Australian
Standards and installed a cable suitable for the property.
It is the responsibility of J, as the local power authority, to control the electricity supply to the
complainant’s home. If the complainant is dissatisfied with the current system of supply, it is a
matter she should take up with the local power authority.
I am satisfied the insurer is not liable for any costs in respect to the power lines or cable.
The insurer is not required to take further action against the local city authority
(LOC)
The complainant asserts that damage was done to power lines affecting her property by a
falling tree that was the responsibility of the LOC. She has provided photographs of the
deteriorated condition of the tree and its positioning after the storm. She contends the LOC
was negligent as trees were a threat to public safety and private property prior to its falling.
She says that the insurer should take action against the LOC on her behalf as her insurance
premium had increased since the claim for the storm damage.
The complainant further contends the insurer had a conflict of interest because of an
insurance arrangement with the LOC. She argues that the insurer’s claim against the LOC
was not pursued due to the LOC’s lack of negligence but due to an intra -company agreement
Determination | Case number: 917576 Page 4 of 7
between the insurer and the LOC, which provided that if a party does not lodge a claim after a
denial of liability by the LOC there was no recovery available against the LOC.
The information before me indicates the complainant had initially sought to claim against the
LOC but it denied liability. This LOC claim was managed by a claims manager of a self-
insurance scheme through the Municipal Association of which the LOC was a member. The
liability of the LOC was assessed through this scheme. Although the findings of the
assessment are challenged by the complainant, mainly in respect to the location of the tree
before it fell, it was determined that the LOC was not negligent. The reason being the
complainant’s property damage was not reasonably foresee able. The complainant did not
take legal action against the LOC but lodged a claim with the insurer.
It is a matter for the insurer to determine to take action against a third party, like the LOC, if it
believes, on the evidence, there was negligence that caused damage to an insured property.
In the face of an investigator’s report that the LOC was not liable for the damage to the
complainant’s property, I am satisfied it would not have been prudent or reasonable for the
insurer to pursue the LOC by taking it further, such as legal action. Moreover, even if the
insurer had pursued the LOC and was successful, the outcome in respect to the cost of
repairs was not likely to be any different.
The complainant has complained about an increase in her home insurance
premium
In the ordinary course of the fixing of insurance premiums, an insurer may increase a
premium after a policyholder makes a claim. I note, in this instance, that the insurer has
included in its offer of settlement the sum of $1,000 by way of a goodwill payment, which
would mitigate any increase in the premium for the complainant.
The complainant has not shown the insurer is otherwise liable
The complainant provided numerous submissions in support of her position. The submissions
included several allegations of malfeasance, misrepresentation, breach of corporate
governance and corrupt and improper actions against the insurer and the builders who
attended and were authorised to conduct the repairs. She suggests there was a scam in
relation to the 63 amp mains power switch. The insurer has provided relevant documentation
from its contractors as well as its claim notes to illustrate the processes it followed in
assessing the claim and the work carried out on the property, including making it safe.
The com plainant’s allegations raise issues of possible fraud which is a serious matter. The
law requires that a person who alleges fraud has the burden of proving each of the elements
of fraud by clear, cogent and convincing evidence. Proof by clear, cogent and convincing
evidence means that the element must be proved that carries greater weight and is more
convincing taking into account all of the evidence.
The complainant is obviously dissatisfied with the insurer’s offer of settlement. I am, however,
not satis fied any of the complainant’s allegations are supported by evidence to satisfy the
necessary burden of proof in respect to her allegations.
The insurer says it could only offer to cash settle the claim
The complainant has drawn attention to uncompleted repairs or poor workmanship. This has
been denied by the insurer, who has provide photographs of the complainant’s home in
support of its submissions.
Determination | Case number: 917576 Page 5 of 7
The insurer also alleges that its contractors were not allowed access to the complainant’s
property to complete works in accordance with the SOW. The complainant says that the SOW
is not adequate and does not deal with all the damage. She further has complaints about the
insurer’s handling of the matter as well as the conduct of its contractors.
It is apparent from reading the respective submissions of the parties that their relationship has
broken down. In normal circumstances an agreed SOW is reached between an insurer and its
insured. Access is then allowed to the insured’s property by contractors to complet e the
works in the SOW. Such access is required for the insurer to meet its obligations.
I am satisfied in the circumstances of the parties’ current relationship, that access to the
complainant’s property to complete the SOW will not be made available by the complainant.
The insurer’s offer of settlement was reasonable
The complainant argues the insurer’s settlement offer is insufficient to finalise the required
repairs. A cash settlement provides for contingencies and allows her the flexibility. The SOW
includes the supply and installation of a 63 amp circuit breaker to meet compliance for the
existing 16 mm mains cable. However, the complainant can arrange for another circuit
breaker if she can have an electrician install one.
Based on the available mate rial I find the insurer’s assessment of damages required to
finalise the storm damage is fair and reasonable and that the insurer is allowed to cash settle
this matter by payment to the complainant of $6,267.88 for the cost of the covered repairs.
2.2 Was the claim handed appropriately?
Yes. The complainant has not shown the insurer has mishandled the claim.
The complainant says her claim has been mishandled
The complainant raised a multitude of various issues she says shows the insurer mishandled
the claim. These include but are not limited to:
the insurer’s builder changed the electrical power cable
the insurer’s builder would not locate the replacement mains power box in its initial position
the insurer and its builders acted to conceal and alter evidence that shows fraudulent and
corrupt practice
the insurer having an improper relationship with the local council
the insurer and its builders engaging in corrupt and coercive tactics to force the
complainant to proceed with repairs.
The claim was handled appropriately
I have reviewed the available information including the submissions made by each party, the
insurer’s claim notes and the available emails and reports. The available information does not
show, on the balance of probabilities, that any of the allegations made by the complainant can
be substantiated.
There is no doubt that the complainant went through a harrowing experience because of the
storm. I believe that the complaint, however, stemmed from a misunderstanding about the
extent of the physical d amage of the complainant’s power supply for which the insurer was
liable to cover and the responsibility of an electrician to complete his work in accordance with
Australian Standards including the installation of the appropriate circuit breaker. In the
circumstances, I am not satisfied the claim was mishandled.
Determination | Case number: 917576 Page 6 of 7
2.3 Why is the outcome fair?
The storm incident and its impact on the complainant’s property and electricity supply would
have been most disturbing to the complainant. The insurer’s offer, however, all ows for the
cost of claim related repairs and contingencies in accordance with the policy coverage. It
would not be fair to require the insurer to pay for costs not covered under the policy.
The complainant will be disappointed with the outcome of this complaint. However, the
outcome is fair because the available evidence does not show the insurer acted
inappropriately in handling the claim, and the insurer has shown the current settlement is fair
and reasonable and complies with the coverage provided by the policy.
Determination | Case number: 917576 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.