Text of the determination
Determination
Case number 917572
Financial firm Hollard Insurance Partners Limited
Determination | Case number: 917572 Page 1 of 6
Case number: 917572 5 April 2023
1 Determination overview
1.1 Complaint
The complainant holds home and contents insurance issued by the financial firm (insurer). On
14 June 2022, she lodged a claim for water damage and resultant mould affecting her home’s
basement and the contents within it. She said storms in March 2022 had caused the damage.
The insurer says the water ingress did not occur through a storm created opening, but
through pre-existing cracks at the side of the house. It says the cracks were a maintenance
issue involving gradual deterioration, wear and tear. The insurer says that in the
circumstances, policy exclusions apply. It has denied the claim.
The complainant says the cracks could not have been the source of the water ingress as the
land slopes away from them. She wants the insurer to cover the claim, reimburse professional
costs she incurred and pay non-financial loss compensation for the stress it has caused her.
1.2 Issues and key findings
Is the insurer entitled to deny the claim?
Yes. On the available information, the insurer has proven that it is more likely than not that
the water ingress was not through a storm created opening. The claim is therefore excluded.
Is the insurer required to reimburse professional costs?
No. The complainant’s expert report has not assisted her in establishing she is entitled to be
covered for the damage claimed.
Is non-financial loss compensation payable?
Yes. The insurer accepts that it has caused the complainant stress and inconvenience and
has offered her $5,000 in compensation. It is reasonable that the insurer pays that amount.
Why is the outcome fair?
The insurer has established that the damage claimed is excluded from cover under the policy.
In the circumstances, it would not be fair to require the insurer to pay the claim or reimburse
the complainant’s expert fees. However, as the insurer accepts it h as caused stress and
inconvenience, it is fair to require it to pay the compensation it offered.
1.3 Determination
This determination is substantially in favour of the insurer.
If the complainant provides written notice she accepts this determination, the insurer is
required to pay her within 14 days $5,000 in non-financial loss compensation.
The insurer is not required to take any other action.
Determination | Case number: 917572 Page 2 of 6
2 Reasons for determination
2.1 Is the insurer entitled to deny the claim?
Yes. On the available information, the insurer has proven that it is more likely than not that
the water ingress was not through a storm created opening. The claim is therefore excluded.
Complainant must show a claimable loss under the policy
The complainant is required to show, on the balance of probabilities (that it is more likely than
not), that she suffered a claimable loss under the policy. This means she must show the loss
was caused by a risk for which she is insured.
The complainant holds home and contents insurance with the insurer. Subject to the terms
and conditions set out in the product disclosure statement (PDS), the policy covers damage
to the insured property caused by a listed insured event. One of the listed events is ‘Storm’.
In mid-June 2022, the complainant lodged a claim after noticing water damage and mould in
her home’s basement , affecting building components and contents. She said the damage and
mould were caused by severe storms in March 2022.
Once the complainant proves the existence of a claimable loss, the insurer is liable for the
loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of
proving on the balance of probabilities the application of the exclusion or condition.
Insurer says the damage is not covered
Following claim lodgement, the insurer appointed builder AJ to conduct make safe repairs. AJ
reported that:
there had been water ingress via the cellar stairs, leading to mould growth
visually, the damage appeared consistent with a storm event
the affected items included carpet tiling, the stairs, the plasterboard wall and contents
there were high moisture readings in the plasterboard walls
it had attended to mould remediation and installed drying equipment.
In addition, the insurer appointed builder CS to assist with assessment. CS inspected the
property on 27 June 2022. In its resulting report, CS concluded:
Resultant damage to the basement is consistent with damage caused by storm
where rainwater has entered the building, although maintenance related issues
were identified. The cracks and opening present at the left elevation of the
property was responsible for the water ingress and the resultant damages. Had
these not existed, the damages would not have occurred regardless of the volume
of rainwater.
The insurer also relies on a leak detection testing undertaken by CM, plumber, on 25 July
2022. CM ruled out plumbing issues as a cause of the damage and said its opinion was that:
under heavy rain conditions, stormwater is entering the property at the left hand
side where cracking and openings are present to the wall and concrete. This is
allowing water to permeate the cavity and make its way to the bottom of the
stairwell at ground level.
Determination | Case number: 917572 Page 3 of 6
Accordingly, the insurer says that the claimed damage has not been caused by storm. It
notes that the ‘Storm’ insured event does not cover damage caused ‘when rain, hail, wind or
snow enters your building unless the entry point was created by the storm’.
It also relies on general exclusions set out on page 54 of the PDS, precluding damage or
liability caused directly or indirectly by or in any way connected with:
‘wear and tear, rust, corrosion and/or deterioration…’
‘not maintaining your building and/or contents in reasonably good repair and condition’.
Complainant says the storm caused the damage
The complainant relies on a report dated 7 October 2022 from EB, builder. EB reported:
a trail of water ran ‘ from the south-eastern corner towards the north-western side which
would disperse along the concrete floor behind the stairwell ’
the roof drainage system was not connected to the stormwater system and flowed directly
onto the ground
water had been able to penetrate into the subfloor due to a one-off storm event
the water did not come from the north west side given that timber decay/moisture damage
to the timber staircase and structural supports was not observed
‘ water would not be able to enter the property from the driveway window due to the
topography of the site and slope of the driveway’.
The complainant has provided a photo taken from the street of the front of her house and its
driveway ‘to highlight the topography of the site and the subsequent impossibility of the water
ingress coming from the site of the driveway’. The photo shows the house is built on a sloping
block, running from the left down to the right, with the driveway on the right side.
She has also provided a photo of the internal wall under the driveway window after the
plasterboard had been removed. She says there are no observable water damage markings
on the wall, so the water could not have come in from the driveway side of the house.
The complainant says Bureau of Meteorology data shows the total rainfall in March 2022 was
extreme. Rainfall measured at a weather station about 3km away ‘was 554.0 mm, which is
421% increase over the long- term average…, or 471% of the average over recent decades’.
In addition, she notes that a pre-purchase pest and building report she obtained in February
2017 did not refer to any maintenance being required to prevent water ingress or evidence of
mould damage affecting the subfloor.
Further, the complainant submits that section 46 of the Insurance Contracts Act, 1984 (Cth )
(ICA) prevents the insurer from denying the claim. Under section 46, an insurer may not rely
on an exclusion relating to a defect in something at a time before the policy was entered into
if the insured was not reasonably aware of the defect.
Insurer is entitled to deny the claim
The complainant’s house is built on the south western side of her street. The house faces
north east. As noted above, the house is on a sloping block. Looking at the house from the
street, the house’s south eastern external wall (on the left), is much higher than the house’s
north western external wall (on the right). The driveway runs along the north western wall.
It is not in dispute that stormwater has entered the complainant’s home, causing damage to
the basement and contents stored in that area. I am therefore satisfied that the complainant
has shown a claimable loss under the policy. This means the insurer must prove on the
balance of probabilities an exclusion applies, if it is to be able to deny the claim.
Determination | Case number: 917572 Page 4 of 6
CS says the stormwater entered through cracks and openings present at the left elevation of
the building. CM said the water was entering at the left side of the home through cracking and
openings. The left elevation/side is the higher south eastern side. That would appear to be in
keeping with EB’s observation of a water trail running from south east to north west.
However, the external photos CS and CM have provided depicting openings and cracking
appear to have mostly been taken from the driveway. These are at, and in the vicinity of, the
driveway window. That is, from the lower north western wall on the right.
I am unable to reconcile the potential anomaly between the references to the left side of the
house by CS and CM in their reports and the photos they have provided, taken from the right.
Nevertheless, they have both clearly stated that the water ingress was due to the presence of
external cracking and openings. Further, CS specifically says that the cracks and openings
were maintenance issues and if they had not existed, there would not have been water
ingress, ‘regardless of the volume of rainwater’.
Overall, I find the CS and CM reports more persuasive than EB’s report. This is because:
they explain how the stormwater ingress occurred. EB simply says it occurred
they have provided photos of water damage to the timber stairs, which contradicts EB’s
statement that there was no water damage in that area
AJ confirmed there was mould affecting the plasterboard wall. EB recorded being informed
by the complainant that mould had not developed on the plasterboard wall lining
CS, CM and AJ inspected the property months before EB did so
by the time EB inspected the property, remedial works had been significantly progressed.
I accept that the slope of the block means it would be unusual for water to ingress from the
lower, driveway side (if that is what occurred). However, as the complainant has observed,
the volume of rainfall in March 2022 was very high. I am not persuaded that ingress from that
side would have been impossible, particularly given the roof drainage system EB describes.
Given that the pre-purchase report was prepared more than five years before the March 2022
storms, its findings are not compelling.
Accordingly, based on the exchanged information, I am satisfied that the insurer has
established on the balance of probabilities that the water ingress was not through a storm
created opening. This means that the claim is excluded from cover under the ‘Storm’ insured
event and the insurer is entitled to deny the claim.
Section 46 of the ICA does not assist the complainant. The exclusion I have determined
applies concerns whether the opening allowing ingress was storm created or not. It does not
refer to a defect or the timing of a defect.
2.2 Is the insurer required to reimburse professional costs?
No. The c omplainant’s expert report has not assisted her in establishing she is entitled to be
covered for the damage claimed.
AFCA may require insurer to contribute to a complainant’s professional costs
The AFCA Rules enable AFCA to require an insurer to contribute to the professional costs
incurred by the complainant. These costs are, however, usually capped at a total of $5,000,
unless special circumstances apply.
Determination | Case number: 917572 Page 5 of 6
When considering whether to require an insurer to make a costs contribution, AFCA takes
into account the complexity of the complaint, and whether the particular complainant needed
to incur costs to understand or establish their claim.
Insurer is not required to reimburse professional costs
The complainant wants the insurer to reimburse professional costs she has incurred. I
assume those costs were paid to EB as the only expert she retained to comment on liability.
EB’s report did not assist the complainant to establish an entitlement to cover. I am also not
satisfied that the complainant needed to obtain EB’s report to understand the claim or the
insurer’s p osition in relation to it.
Accordingly, the insurer is not required to reimburse the complainant’s professional costs.
2.3 Is non-financial loss compensation payable?
Yes. The insurer accepts that it has caused the complainant stress and inconvenience and
has offered her $5,000 in compensation. It is reasonable that the insurer pays that amount.
AFCA can award compensation for poor claim handling
Under paragraph D.3.3 of the AFCA Rules, we may award compensation for non-financial
loss (capped at $5,400) where the insurer’s actions have caused an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or peace of mind.
Insurer is required to pay compensation
The insurer has acknowledged that it has unreasonably caused the complainant stress and
inconvenience. It has offered her $5,000 in compensation.
The complainant says the insurer’s offer is insufficient. She notes she was pregnant at the
time of the claim and the insurer’s de lays and conduct added to an already stressful time. She
wants the insurer to pay the maximum amount of compensation AFCA may award ($5,400).
The insurer reached a claim decision within the standard four-month timeframe referred to in
the General Insurance Code of Practice. Nevertheless, I am satisfied the insurer could have
handled the claim more empathetically, as its compensation offer shows.
This is not a matter in which a maximum compensation award is justified. I am satisfied that
the insurer’s offer is a reasonable one. It is to pay the complainant $5,000.
2.4 Why is the outcome fair?
The insurer has established that the damage claimed is excluded from cover under the policy.
In the circumstances, it would not be fair to require the insurer to pay the claim or reimburse
the complainant’s expert fees. However, as the insurer accepts it has caused stress and
inconvenience, it is fair to require it to pay the compensation it offered.
Determination | Case number: 917572 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairne ss
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. I have reviewed and considered
all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, I have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.