Summary

The complainant claimed for home damage he attributed to the 2021 Victorian earthquake; the insurer declined it. AFCA upheld the decline but ordered $1,500 for non-financial loss due to delays and lack of response.

The onus was on the complainant to show earthquake was the proximate cause, and the expert reports were persuasive, but unexplained delays in claim handling warranted non-financial loss compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial loss

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 917286 Financial firm Allianz Australia General Insurance Limited Determination | Case number: 917286 Page 1 of 6 Case number: 917286 14 April 2023 1 Determination overview The complainant holds a home and contents insurance policy with the financial firm (insurer). He lodged a claim for damage he says was due to the Victorian earthquake on 22 September 2021. The insurer denied the claim because it says the damage is not consistent with the earthquake and the damage is excluded from cover as it is due to:  soil movement  long-term deterioration, and/or  general wear and tear. The complainant disagrees with the insurer’s decis ion and says the insurer should accept his claim and repair the damage. 1.1 Issues and key findings Is the insurer entitled to decline the claim? Yes. The complainant has not established, on balance, that the damage was proximately caused by the earthquake. Is non-financial loss compensation payable? Yes. The lack of response and delays in obtaining responses from the insurer about his claim upset the complainant. He had a poor claims experience and it is appropriate that the insurer pay the complainant $1,500 for non-financial loss. Why is the outcome fair? The outcome is fair because:  the onus is on the complainant to show an insured event caused the damage  the complainant has not provided persuasive information to show the earthquake was the dominant or effective cause of the damage, and  the complainant suffered an unusual degree of stress and inconvenience due to the insurer’s handling of her claim. 1.2 Determination This determination is partially in favour of the complainant. Within 14 days of the complainant’s acceptance of this determination, the insurer is to pay the complainant $1 ,500 compensation for non-financial loss. Determination | Case number: 917286 Page 2 of 6 2 Reasons for determination 2.1 Is the insurer entitled to deny the claim? Yes. The complainant has not established, on balance, that the claimed damage was proximately caused by the earthquake. The claim The complainant ’s house is a triple storey brick veneer with a terracotta tiled roof and was constructed approximately 30 years ago. The complainant says: The Sep 2021 earthquake caused damages to our house such as shifting of roof tiles and ridges, falling of a peripheral roof tile, sinking of balcony/deck, and casing of evaporative unit. Policy covers damage caused by earthquake, subject to terms and conditions The policy is made up of the Policy Schedule and the Product Disclosure Statement (PDS). There is no dispute the insurer sent these documents to the complainant. The policy is an ‘insured events’ policy which responds to loss or damage arising from certain insured events subject to conditions and exclusions as set out in the policy. This means not all loss and damage is covered. Earthquake is an insured event. The complainant must show the proximate cause of the damage is earthquake When an insurance policy used the term ‘caused by’, this typically means proximate cause. Proximate cause is a question of fact depending on the circumstances. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause of the loss. Therefore, to establish cover under the policy, the complainant must show on the balance of probabilities (that is, more likely than not), that the proximate cause of the claimed damage is earthquake. Once the complainant has established a loss which is covered under the policy, the onus shifts to the insurer to establish the application of a condition, limitation or exclusion upon which it seeks to rely, to limit its obligations regarding the claim, or to deny the claim. Insurer provided reports commenting on the cause of damage The insurer appointed MK builder, to attend the property and report on the cause of the damage. MK inspected the property on 27 September 2021 and provided a report dated 6 October 2021 which stated:  it is our opinion that the damage to the mortar bedding to the ridge capping is due to age- related gradual deterioration over a prolonged period of time and the earthquake has likely highlighted the loose mortar  the damage to the evaporative cooling unit is not consistent with an earthquake event, rather hail impact which the complainant advised he experienced two years ago and predate policy inception Determination | Case number: 917286 Page 3 of 6  damage sustained to the rear pergola is due to wear and tear, gradual deterioration and poor workmanship to the footings. The insurer appointed engaged a structural engineer, L, to report on the damage. In its report dated 9 Mary 2022, L reported the following:  subject site is approximately 100km from the earthquake epicentre  classification of the earthquake on the Modified Mercalli Intensity (MMI) Scale in the locality of the subject site confirms a classification of MMI IV (light) classification is described as ‘ felt indoors by many, dishes, windows, door disturbed; walls make cracking sound. Sensation like heavy truck striking building. Standing motor cars rocked noticeably’  damages to structure are not associated with MMI IV classification  analysis of the lateral loading on the structure confirms that the structure is subject to greater lateral force from wind pressure than that imposed by the reported earthquake event  lateral loading from forces imposed by the reported earthquake event is considered to be within the design capability of the building  cracking is not consistent with laterally imposed force  the pattern of damage is consistent with induced stresses from building movement due to differential footing movement  movement and deflection of the roof framing or roof tiles due to lateral earthquake forces is not expected and the observed pointing and dislodgement of a single tile is not consistent with lateral earthquake forces  roof investigations indicate evidence of weathering to tiles and cracks and evidence of prior repairs indicating damage has been a long-term issue  investigation of rear balcony confirms vertical deflection of the structure towards the central column  vertical settlement of the structure is not consistent or symptomatic of lateral earthquake force  investigation of evaporative unit confirms localised punching shear fractures to the plastic lid  the fracture of the lid is not consistent or symptomatic of lateral load from an earthquake event. Complainant says his house was damaged by earthquake The complainant says the house was damaged by the earthquake and questions why the photos he has provided have not been included in L’s report. He says the insurer’s reports are ‘untrustworthy’ . Among other things, he says:  the insurer cannot truly say that not a single house 100 km away from the epicentre was not damaged by the earthquake  the damage to the house was as a result of ‘sudden insult caused by external forces’  without external forces it is impossible for tiles to fall and for the deck to sink and the roof tiles in the east to dislodge  a few days after the earthquake he sought approval from the insurer to fix the roof after tiles shifted and fell. This proves the earthquake damaged the roof  the age of the building cannot be a reason for denial of the claim  although there is a degree of ageing of the balcony, it would not cause a sudden settlement of the structure causing the deck to bend  damage to the roof mounted evaporation unit was caused by the twisting force of the shaking generated by the earthquake. If the damage had been caused by hail it would show many fine cracks in all directions and away from the central impact point  the delay by the insurer placed them in severe disadvantage. Determination | Case number: 917286 Page 4 of 6 The complainant submits that: If there is even one house that is over 100km away from the epicentre that has had their earthquake damage claim approved by their insurance company then this illustrates that the report [by L] is not trustworthy. The complainant has not shown the damage was caused by earthquake I have examined and considered all the information provided by the parties including the photographs provided by the complaint. The complainant appears to be suggesting that the insurer has the onus of showing beyond reasonable doubt, that the damage to his house was not caused by earthquake. On the contrary, the onus is on the complainant to show an insured event caused the damage. The complainant says: We have consulted many other people/’s opinion on th is (including professionals) They have all given the same conclusion. That is, the focus should be whether the damage is caused by an external focus. Obviously, the timing of the damage and the photos we provided clearly prove that the damage is caused by an external force, which is earthquake. However, the complainant has not provided any independent professional opinion to show the earthquake event caused the damage. The fact the complainant may have discovered or noticed damage after the earthquake does not show the earthquake caused the damage. Damage to buildings can arise from multiple reasons. The insurer was entitled to assess the claim and did so by appointing MK builder to provide an opinion. MK visited the site and assessed the house and considered the damage was not due to earthquake. Nevertheless, to be fair to the complainant MK considered it would be prudent for the insurer to seek an opinion from an engineer. The insurer did so and appointed engineer L. The reports were obtained to assist the insurer in assessing the damage. The fact that MK and L were appointed by the insurer does not suggest their opinions are biased or that they are ‘untrustworthy’. It is common business practice to seek opinions from individuals who have specific expertise and experience before making decisions. If the insurer had made a decision about liability without the use of expert opinions, this would have been unfair. The complainant expressed concerns that the photographs he provided were not included in the reports of MK and L. It is not uncommon for builders and engineers reports to only include photographs and information they have personally gathered. This is so they can confirm that they personally gathered the information at the time of inspection and report according to their findings. It was prudent and fair for the insurer to appoint a builder and an engineer to assist in assessing the complainant’s claim. The only other information I have before me, apart from the opinions of MK and L, about the cause of damage are the complainant assertions. The complainant says delays caused by the insurer put him at a significant disadvantage in obtaining an independent expert opinion and doing so now does not assist him. Although the complainant did not receive L’s report Determination | Case number: 917286 Page 5 of 6 until 4 August 2022, MK first told him L had concluded the damage was not caused by earthquake in May 2022. The complainant was dissatisfied with this information and sought a review by the insurer which he was entitled to do. As the complainant says he spoke to many professionals about the damage, it was also open to him to obtain his own independent opinion from at least May 2022, given the initial onus of proof rests with him. I consider MK and L are appropriately qualified to comment on the cause of damage and the conclusions in their reports are detailed and persuasive. MK and L did not only rely on the age of the complainant’s house and the MMI classification in providing their respective opinions. They have provided plausible explanations and reasoning for their respective opinions and findings. Their reports have been provided to the complainant and key extracts of their opinions are noted earlier in this determination. I am satisfied the complainant has not shown the damage was caused by earthquake. 2.2 Is an award of compensation appropriate? Yes. The lack of response and delays in obtaining responses from the insurer about his claim upset the complainant. He had a poor claims experience and it is appropriate that the insurer pay the complainant $1,500 for non-financial loss. AFCA can award compensation for non-financial loss Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which caused an unusual degree of stress, delay or inconvenience. The complainant says the insurer delayed in assessing the claim The complainant has provided a timeline of key events during the assessment of the claim and the insurer’s IDR review. The timeline shows excessive delays in providing updates and information requested by the complainant. Among other things, the complainant was told in May 2022, that engineer L had formed the opinion the claimed damage was not caused by the earthquake. Despite repeated requests for the report, the insurer did not pro vide L’s report to the complainant until 4 August 2022. The insurer has provided no explanation for the delays and has not rebutted the complainant’s version of events. Given, this I am satisfied there were undue delays in assessing the claim and respondin g to the complainant’s requests and this caused the complainant undue stress. The insurer should pay the complainant $1,500 for non-financial loss. 2.3 Why is the outcome fair? The outcome is fair because:  the onus is on the complainant to show an insured event caused the damage  the complainant has not provided persuasive information to show the earthquake was the dominant or effective cause of the damage, and  the complainant suffered an unusual degree of stress and inconvenience due to the insurer’s handling of her claim. Determination | Case number: 917286 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.