The complainant's caravan was flood damaged and the insurer declined the claim under a 72-hour flood exclusion after policy inception. AFCA found the flood more likely than not occurred within 72 hours and decided in favour of the insurer.

Hydrology evidence showed the river peak on 4 March 2022 flooded the caravan within 72 hours of the 5.04pm 1 March inception, so the clear flood exclusion applied.

Issues

Subjects and remedies

broker or intermediarynatural disasterno remedy

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 916267 Financial firm AAI Limited Determination | Case number: 916267 Page 1 of 5 Case number: 916267 26 July 2023 1 Determination overview 1.1 Complaint The complainant, through his broker, arranged a caravan insurance policy on 1 March 2022. On 18 March 2022, a claim was lodged for flood damage to the caravan, reported to have occurred on 8 March 2022. The insurer has declined the claim. The insurer says its investigations show the caravan was flooded from ‘H’ River within 72hrs of policy inception, which is not covered under the policy. The complainant disputes this and says the flood and therefore damage to the caravan occurred outside the initial 72hrs of policy inception. 1.2 Issues and key findings Is the insurer entitled to decline the claim? Yes. Based on the available material, the insurer is entitled to decline the claim. I am satisfied the damage was caused by flood which occurred within the first 72hrs of inception of the policy, which is excluded from cover. Why is the outcome fair? The policy is clear and unambiguous, and it excludes damage resulting from flood with in the first 72hrs of policy inception. The available information shows it is more likely than not that the flood damage to the caravan occurred within 72hrs of the complainant arranging the policy. It would not be fair to require the insurer to pay a claim for damage which is not covered under the policy. 1.3 Determination This determination is in favour of the insurer. The insurer is entitled to rely on the terms and conditions of the policy to refuse payment of the claim. Determination | Case number: 916267 Page 2 of 5 2 Reasons for determination 2.1 Is the insurer entitled to decline the claim? Yes. The insurer is entitled to decline the claim as the flood damage to the caravan more likely than not occurred within the first 72hrs of policy inception, which is excluded from cover. The policy is an accidental damage contract of insurance The insurer provided the complainant with the relevant policy documentation including the product disclosure statement (PDS) and certificate of insurance (COI). Therefore, I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. The policy covers the insured caravan against accidental loss or damage. Cover under the policy is subject to the conditions, limitations and exclusions specified in the PDS. I have considered all the information from the parties. I am satisfied the insurer has shown the policy was incepted at 5.0 4pm on 1 March 2022. I acknowledge the complainant’s position that the policy was arranged earlier and/or that it should be accepted that cover commenced from 12.01am on 1 March 2022. However, I am not satisfied this is consistent with the available information. The information includes evidence of the complainant contacting his broker at 4.53pm on 1 March 2022 to make enquires regarding commencement of the policy and whether he would be covered straight away. It may well be that the parties were communicating about the insurance application earlier than 5.04pm, however, such communications cannot reasonably be considered acceptance of and/or commencement of the contract. The policy does not cover the caravan against flood damage for first 72hrs There is no dispute the policy covers the caravan, contents and annexe against accidental loss or damage, which includes flood damage. However, cover under the policy is subject to conditions, limitations and exclusions including: You are not covered under any section of this policy for damage, loss, cost or legal liability that is caused by or arises from or involves: Bushfires, storms, floods, tsunamis in the first 72 hours of cover any loss or damage caused by a bushfire, storm, flood or tsunami in the first 72 hours of cover. But we will cover these incidents if this policy began on the same day: • you bought your caravan; • that another policy covering your caravan expired or cancelled, but not when you cancelled the policy prior to its expiry date, and only up to the value covered under the expired or cancelled policy (any increase in value will not be covered for these events for the first 72 hours specified). Determination | Case number: 916267 Page 3 of 5 The available information shows the caravan was purchased approximately 11 months prior to 1 March 2022, and it was not covered under a previous contract of insurance. Given this, the exceptions to the above policy exclusion does not apply to the complainant’s circumstances. Information shows Flood damage occurred within 72hrs of policy inception I a cknowledge the complainant’s position that the flood damage to the caravan did not occur within 72hrs of policy inception, rather, that it occurred on 8 March 2022. The complainant has provided a survey report from consultants’ ‘MT’ dated 22 February 2023 which says it was appointed to determine the existing floor level of the caravan, as well as the surface/floor levels of two external floors. MT provides a level of 7.479m AHD for the highest external surface, which is a concrete slab covered by a vinyl floor surface and a level of 7.440m AHD for a second concrete slab with an exposed surface. The report does not include a floor level for the caravan. The complainant also relies on screen shots of drone footage over the location of the caravan site said to have been taken at 10.00am on 4 March 2022 and pictures of a bridge, which he says is at a similar level as the caravan site. The insurer relies on the information provided by engineering and hydrology consultants ‘MC’ in reports dated 7 July 2022, 23 December 2022 and 14 March 2022. The subsequent two reports were provided by MC in response to concerns and information provided by the complainant after its original report. I have carefully considered these reports and note MC provides the following relevant information:  recorded water levels show the water level hydrograph in the H River at ‘ S ’ , ‘ L V’ and ‘ W F’ for the period from 20 February to 15 March 2022. This river level recording station at S is very close to the property in line with its downstream boundary, so these values are the best estimate of the water level at the subject sites  the difference along the length of the site would be only about 0.1m at the most. The S water level records show an initial peak of 8.33m AHD at 12.00pm on 4 March 2022 and a second peak of 10.68m AHD at 3.00pm on 9 March 2022  the river level at the time of the drone footage at 10.00am on 4 March was 8.156m AHD, or 0.174m below its peak of 8.33m AHD at 12.00pm 4 March 2022  the recorded water levels at the S gauging station provided by the complainant are identical to those provided by MC in its July 2022 report. The only difference is that the data obtained by the complainant is at 15minute intervals, whereas MC used one-hour interval data  the average overflow threshold increases along the length of ‘ S S Gardens ’ (caravan site) from about 6.0m AHD at its SW end to about 7.4m AHD at the boat ramp and increases north of the boat ramp from 6.9m AHD to 7.4m AHD at the site next to site 100 to its NE, which is the highest site in the property  the water level records at the S gauging station indicate that the level of 7.3m AHD was reached at 6.00pm on 3 March 2022 and reached a maximum height in the first rise of 8.33m AHD at 12.00 pm on 4 March  the first peak level of 8.33m AHD at the S water level recording station on 4 March 2022 was sufficient to inundate all the sites to an average depth of 1.3m to 1.5m  the survey report from MT does not provide the floor level of the caravan. Based on photos it appears that the caravan’s floor level is about 0.6m to 0.7m above ground level. This would give a floor level in the range of 8.04m to 8.18m AHD depending on which of the 2 concrete slabs the caravan was placed on. On this basis, as the maximum river level in the first rise on 4 March was 8.33m AHD, the caravan would have been flooded Determination | Case number: 916267 Page 4 of 5  the S gauging station is on the opposite bank and marginally upstream. As it is a straight river reach there will be very little difference, if any, on water levels across the river, so the S gauging station is an excellent surrogate for that at the caravan site. The information from the complainant is not persuasive I accept it is likely MT’s survey report provides more accurate external floor levels, however, this does not assist the complainant in the circumstances. This is because regardless of the accuracy of the floor levels, the available information shows it is more likely that the caravan was damaged by floodwaters at or around 12.00pm on 4 March 2022. This is within 72 hours of the policy being incepted at 5.04pm on 1 March 2022. I also note the complainant ’ s reference to screen shots from drone footage taken at 10.00am on 4 March 2022 and photos of a bridge. However, I do not find this information compelling enough to disregard the comprehensive investigations and opinions from MC, which are supported by persuasive research and data. There is no information which can reasonably be relied on to compare the height of the said bridge to the location of the caravan site and the drone footage is from a few hours before the peak river level recorded on 4 March 2022. Accordingly, although I note the complainant’s various concerns and supporting information, I am satisfied it is more likely than not that the peak river level recorded on 4 March 2022 will have resulted in the floodwater inundation and associated damage to the caravan. Insurer is entitled to decline the claim The policy is clear and unambiguous in stating the complainant is not covered for any loss or damage arising from flood within the first 72hrs from policy inception. The available information shows it is more likely the caravan was damaged by the flood event within 72hrs of policy inception. I empat hise with the complainant’s situation, however, it would be unfair to require the insurer to accept the complainant’s claim in the circumstances. The insurer is entitled to decline the claim in line with the policy. I note the complainant says he was not advised of the 72hr policy limitation when arranging the policy. The complainant arranged the policy through his broker and the insurer is not responsible for the actions or inaction of the complainant’s broker. The c omplainant is entitled to seek his own independent legal advice in this regard. 2.2 Why is the outcome fair? The policy is clear and unambiguous, and it excludes damage resulting from flood with in the first 72hrs of policy inception. The available information shows it is more likely than not that the flood damage to the caravan occurred within 72hrs of the complainant arranging the policy through his broker. It would not be fair to require the insurer to pay a claim for damage which is not covered under the policy. Determination | Case number: 916267 Page 5 of 5 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.