Home / Youi / Determination 915891

Determination 915891

Insurer's liability for further damage caused by defective storm repairs by its builder, and rectification costs

FirmYoui
Decided2023-03-21
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$31,615
Non-financial loss$1,500
Amount claimed$161,346
SourceAFCA PDF

Summary

The complainant's roof repairs after a storm claim were defective and caused further roof, solar and internal damage. AFCA found the insurer liable, ordered a cash settlement of the roof after an engineer's scope plus 20% uplift, $31,614.60 for solar and internal damage, and $1,500 non-financial loss.

Under the PDS quality guarantee and GICOP, an insurer that chooses and authorises the repairer is responsible for the quality of the repairs and for loss flowing from faulty work.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial lossrepair or rectify

Related

All Youi determinations · Find similar determinations

Text of the determination

Determination Case number 915891 Financial firm Youi Pty Ltd Determination | Case number: 915891 Page 1 of 6 Case number: 915891 20 March 2023 1 Determination overview 1.1 Complaint The complainant holds a home insurance policy with the financial firm (insurer). In November 2020, the complainant lodged a claim for damage to his property due to a storm. The insurer accepted the claim and completed the repairs in June 2021. In January 2022, the complainant reported further damage to the property (further damage) which he says is due to sub- standard and poor workmanship by the insurer’s builder. He seeks that the roof and the solar panels be replaced and the internal damage to the property be repaired. The insurer says some but not all of the further damage is covered by the lifetime guarantee. The complainant disagrees and seeks that the insurer cover all the further damage. 1.2 Issues and key findings Is the insurer liable for the further damage? Yes. The insurer is required to reinstate the property to the condition it should have been repaired to in 2021. This includes rectification of the 2021 repairs, as well as the internal damage caused by sub-standard 2021 repairs. Accordingly, the insurer is liable for the further damage. Is the complainant entitled to compensation? Yes. I am satisfied that the insurer’s handing of the 2021 repairs a nd the rectification claim has caused unreasonable stress and inconvenience to the complainant. The insurer is required to pay the complainant $1,500 in non-financial loss compensation. Why is the outcome fair? The outcome is fair because the repairs commissioned by the insurer in 2021 were not completed properly and caused further damage to the complainant’s property . It is fair that the insurer ensures the repairs are completed properly and any damage resulting from the faulty repairs is also rectified. 1.3 Determination This determination is in favour of the complainant. In the event that the complainant accepts this determination, within 14 days of being notified of the acceptance, the insurer must:  engage an engineer to do a scope of works and quote for the roof replacement. Within 14 days of the actionable quote being received, the insurer must cash settle the complainant for the quote and pay a 20% uplift for contingencies and the loss of a lifetime guarantee;  pay the complainant $31,614.60 for the solar and internal damage, comprising: > $11,220 for the solar quote plus uplift; and > $20,394.60 for the internal damage quotes plus uplift. Determination | Case number: 915891 Page 2 of 6 2 Reasons for determination 2.1 Is the insurer liable for the further damage? Yes. The insurer is required to reinstate the property to the condition it should have been repaired to in 2021. This includes rectification of the 2021 repairs, as well as the internal damage caused by sub-standard 2021 repairs. Accordingly, the insurer is liable for the further damage. Policy and GICOP provides lifetime guarantee on repairs The product disclosure statement (PDS) says: Quality guarantee If we choose and aut horise repairs with a repairer, we will guarantee the quality of those repairs for as long as you are the owner of the insured property. Further, the General Insurance Code of Practice (GICOP) provides that if an insurer chooses and authorises the repairer, the insurer is responsible for the quality of the workmanship and materials. So, if the repairs are faulty or incomplete then the insurer is responsible for rectifying them and any loss that flows from the original faulty or incomplete repairs. Parties disagree about the cause of the further damage In January 2022, the complainant reported further damage to the property which he believes to be due to sub- standard and poor workmanship by the insurer’s builder , AJ. The insurer again engaged AJ to assess the further damage. It says:  there are minor repairs required to the roof however there is no evidence to suggest that the water entry is related to the workmanship of its trades;  the source of water ingress is three major design faults;  in terms of the solar panels, some of the conduit needs to be relocated, the cable inside the conduit needs to be covered (as it is currently exposed) and the earthing cabling should be moved so it does not touch the roof (as it presently does);  it recommends appointing an engineer to do a site inspection and complete any rectification works; and  if the workmanship is the cause of the internal damage, this will be covered. The insurer also engaged an engineer, CRD, to assess the further damage. Its report dated 29 November 2022 says:  the replacement roof (after the covered insured event) was installed in many areas at the incorrect pitch for the type of roofing material used. Therefore, it was a non-compliant installation;  the Anticon blanket was not installed as per the manufacturer ’ s recommendations and has been left hanging in the gutters, siphoning water during a rain event back into the roof space. With no anti-ponding board, it encapsulates the water which then overflows into the ceiling spaces causing the internal water damage; Determination | Case number: 915891 Page 3 of 6  about 80% of the roof screws, even though correctly sized are overtightened causing warping to the roof sheeting and cappings. There are also incorrect sized soaker flashings installed;  the guttering does not have any downpipes to manage the storm water;  some roof sheeting has no turn ups to the pan ends and there are no turn downs to the pan ends on any roof sheeting. The roof sheeting has been laid out of square and the lapping has kinks, breaking any capillary seal;  the small roof penetrations (vent pipes) have been installed poorly, using the Decktite without any obvious preparation before installation;  the primary cause of water entry is the Anticon blanket siphoning water from the guttering systems and the poorly installed Decktite. The secondary cause of damage is the non- compliant pitch for the corrugated Colourbond roofing; and  it recommends: reengineering the roof if the corrugated Colourbond is going to be retained; replacing the roof sheeting and flashings (due to the Anticon blanket installation, overtightened screws, and the off square installation) as per AS1562.1:2018 Design and Installation of sheet roof and wall cladding and HB 39- 2015 installation code for metal roof and wall cladding and any manufacturers recommendations for installation ; and a solar specialist be engaged to test the solar panels. Insurer required to repair further damage in accordance with expert report I accept the CRD report prepared for the insurer (and which it has not disputed) is consistent with the further damage identified by the complainant. The insurer also has not obtained a report from a solar specialist in line with CRD’s recommendation. Therefore, on balance, I am satisfied that the insurer is required to repair the further damage and any consequential loss as a result of the poor workmanship. The complainant has provided the following quotes for the repairs, which total $161,345.50:  roof replacement: $135,000  ceilings, walls and floors repairs: $6,380  carpet replacement: $1,194  ensuite cabinets replacement: $9,421.50  solar system repair/replacement: $9,350 I note that the original scope of works from AJ for the roof replacement in 2021 was $55 ,632.50. In light of the fact that the complainant’s quote is almost three times that, I consider the following steps should be taken:  the insurer is to engage an engineer to do a scope of works and quote for the roof replacement; and  the insurer should cash settle the complainant for the value of the quote plus a 20% uplift for contingencies and the complainant’s loss of a lifetime guarantee on repairs. The complainant has provided a quote for the replacement of the solar panels which he says have not been working since the original works were completed in 2021. The insurer has not obtained a report in relation to the panels, despite CRD’s recommendation. Without any Determination | Case number: 915891 Page 4 of 6 information to the contrary, I consider the comp lainant’s submission that the panels need to be replaced and the quote for $9,350 to do so is reasonable (solar quote). Without information to the contrary, I also consider the complainant’s other quotes for ceilings, walls and floors repairs, carpet replacement and the ensuite (collectively the internal damage quotes) are reasonable in the circumstances. Therefore, the insurer is required to cash settle the complainant for the solar quote ($9,350) and the internal damage quotes ($16,995.50). I note that the insurer has not disputed the complainant’s quotes, nor has it provided its own quotes or any reports regarding these matters. In addition, the insurer is to add a 20% uplift on the solar quote and internal damage quotes for the transfer of risk and the complainant’s loss of lifetime guarantee on repairs. Accordingly, the insurer is required to pay the complainant $31,614.60 plus it must cash settle the complainant for the roof repairs. 2.1 Is the complainant entitled to compensation? Yes. I am satisfied that the insurer ’s handing of the 2021 repairs and the rectification claim has caused unreasonable stress and inconvenience to the complainant. The insurer is required to pay the complainant $1,500 in non-financial loss compensation. AFCA can award compensation for non-financial loss Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which causes:  an unusual degree of stress, delay, or inconvenience, and/or  interference with a person’s expectation of enjoyment and/or peace of mind. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. Compensation for non-financial loss is warranted Under the AFCA Rules, compensation of up to $5,400 can be awarded for non-financial loss where a complainant suffers an unusual degree of physical inconvenience or time taken to resolve a situation or interference with a compla inant’s enjoyment of life or peace of mind. AFCA expects a complainant to be moderately robust and will not award compensation for the ordinary degree of inconvenience that comes with making a claim. The complainant says the process of the claim has caused him an unusual degree of physical inconveniences and stress, as the roof did not leak before the repairs were commenced in 2021. Further, the 2021 repairs were so poor that they caused further damage to the interior of the house (which was not damaged in the original hail storm). Given the faulty roof repair in 2021 has been identified by the insurer’s appointed engineer as the cause of the damage, I am surprised that the insurer did not proceed to obtain a scope of works and quote for the cost to repair the damages. Having reviewed the information available, it does suggest the insurer mismanaged the initial repairs and the rectification claim. This caused the complainant an undue degree of stress and inconvenience. Accordingly, given all of the circumstances, the insurer should pay the complainant $1,500 in non-financial loss compensation. Determination | Case number: 915891 Page 5 of 6 Outcome is fair in the circumstances The outcome is fair because the repairs commissioned by the insurer in 2021 were not completed properly and caused further damage to the complainant’s property . It is fair that the insurer ensures the repairs are completed properly and any damage resulting from the faulty repairs is also rectified. Determination | Case number: 915891 Page 6 of 6 3 Supporting information 3.1 The AFCA processes AFCA’s approach is base d on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.