Partial decline of storm claim (roof and flooring), inadequate mould remediation, cash settlement amount, temporary accommodation and contents
Text of the determination
Determination
Case number 915795
Financial firm AAI Limited
Determination | Case number: 915795 Page 2 of 12
Case number: 915795 17 October 2023
1 Determination overview
1.1 Complaint
The complainant holds home building and contents insurance issued by the financial firm
(insurer). On 28 February 2022, he lodged a claim following a storm the day before.
The insurer agreed to cover most of the internal damage, paid the policy limits for temporary
accommodation (TA) and contents, and remediated mould. In January 2023, it paid
$18,926.43 as a cash settlement for the accepted building damage. However, it declined to
cover the roof and flooring damage, saying that was from excluded causes, not the storm.
The complainant wants the insurer to pay more for the building damage. He also says that the
insurer’s delays led to worsening mould damage and that it is still yet to adequately remediate
the mould. Accordingly, he wants the insurer to pay additional amounts for TA and contents.
He also says the insurer breached his privacy and handled the claim inappropriately.
1.2 Issues and key findings
Is the insurer able to deny the roof and floor damage?
Yes. That damage is due to wear and tear, maintenance issues and defects, not the storm.
Should the insurer pay for further mould remediation?
Yes, to an extent. There are concerns about the adequacy of t he insurer’s remediation.
However, it also appears likely some of the ongoing mould is due to factors for which the
insurer is not responsible. To promptly resolve the dispute, the insurer is to pay 50% of the
cost of the actions recommended by the complainant’s mould expert, IE.
Is the insurer to pay more to settle the building damage?
Yes. Whether the quote the insurer relied on was actionable by a retail customer is somewhat
uncertain and the insurer did not include a contingencies uplift. As the insurer’s quote is the
only one available and the parties’ relationship has broken down, a higher than usual 30%
uplift on the quote is to be paid plus interest from the date of the cash settlement.
Is the insurer required to pay additional TA costs?
Yes. The insurer has materially contributed to the complainant having to incur TA costs after
the policy limit was exhausted. It is to pay the complainant $16,800 ($700pw for six months).
Is the insurer required to pay more for contents damage?
No. By 1 July 2022, contents throughout the property were already mould affected. The
contents were subsequently disposed of and it is not possible to determine whether the
insurer’s delays meant that salvageable items became unsalvageable.
Determination | Case number: 915795 Page 3 of 12
Is non-financial loss compensation payable?
Yes. The insurer’s delays and poor claim handling has caused the complainant major stress
and inconvenience and affected his mental health. The insurer is required to pay $5,400 as
compensation. However, the panel considers the insurer’s privacy breach apology sufficient.
Why is the outcome fair?
It is fair that the insurer pays additional amounts where its delays have more likely than not
caused the complainant further loss, and given that it did not include a contingencies uplift in
its cash settlement payment.
1.3 Determination
This determination is substantially in favour of the complainant.
Upon receiving written notice that the complainant accepts this determination (notice), the
insurer is required to:
within seven days of receiving the notice, request a hygienist not previously involved in the
claim to prepare a desktop quote actionable by a retail customer for the cost of
undertaking the recommended actions set out in IE’s report dated 21 December 2022
within seven days of receiving the hygienist’s quote, provide a copy of it to the complainant
and pay him 50% of the quoted amount
within 14 days of receiving the notice, pay the complainant $5,677.93 (30% of $18,926.43)
plus interest on that amount pursuant to section 57 of the Insurance Contracts Act, 1984
(Cth) (ICA) from 19 January 2023 (date cash settlement cheque was raised) until the uplift
amount is paid
within 14 days of receiving the notice, pay the complainant $16,800 in additional TA costs
within 14 days of receiving the notice, pay the complainant $5,400 in non-financial loss
compensation.
Determination | Case number: 915795 Page 4 of 12
2 Reasons for determination
The complainant is represented by his partner, MP. In this determination, the complainant,
MP and their children are referred to as ‘the complainant’, unless context requires otherwise .
2.1 Is the insurer able to deny the roof and floor damage?
Yes. That damage is due to wear and tear, maintenance issues and defects, not the storm.
Complainant must show a claimable loss under the policy
The complainant is required to show on the balance of probabilities (that it is more likely than
not), that he suffered a claimable loss under the policy. This means he must show the loss
was caused by a risk for which he is insured.
Subject to the terms and conditions set out in the product disclosure statement (PDS), the
complainant’s policy covers damage to his home and its contents caused by a listed insured
event. Those events include ‘Storm’.
On 28 February 2022, the complainant lodged a claim with the insurer. He said heavy rains
during a storm the day before had entered the home and caused water damage. The insurer
partially accepted the claim but has denied it is liable for damage to the roof and flooring.
Once the complainant proves the existence of a claimable loss, the insurer is liable for the
loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of
proving on the balance of probabilities the application of the exclusion or condition.
Insurer says roof and floor damage is not covered
Builder AR attended the home on 3 March 2022 to undertake make safe repairs. Photos AR
included in its report to the insurer show chipped and deteriorated roof tiles, missing barge
capping and cracked pointing. There are also photos of gaps between roof tiles filled with
silicone. AR did not record in its report that it did that work.
AR returned to the property on 25 May 2022 as further water ingress had occurred. In its
resulting report, AR noted its roofer (TR) had inspected the roof and said it was:
in fair condition with no obvious holes or cracks. However, some of the pointing
required attention but trades did not believe this to be the cause of the leak.
Trades suspected that the leaking was caused by wind driven rain under the tiles.
TR’s invoice was attached to AR’s report. In it, TR stated there were numerous cracks to the
ridge capping and tiles. All spots were sealed.
On 1 July 2022, builder AB inspected the home. It concluded that the water ingress was
‘caused by heavy wind driven rain, with contribution from roof maintenance issues’. While
acknowledging that it had not accessed the roof due to wet weather conditions, AB stated
cracking to ridge capping could be seen from ground level.
Roof inspector AA inspected the roof by drone and reported that there were no visible signs
of storm created openings or impact damage. AA considered that the water ingress was due
to cracks in the ridge cap pointing and tiles, due to age and general wear and tear. There
were old and new silicone repairs. It noted wind driven rain could also have been a factor.
Determination | Case number: 915795 Page 5 of 12
On 21 August 2022, forensic builder SE inspected the home. SE said the roof was showing
signs of significant age-related deterioration. It also concluded that the pergola had been
poorly constructed, so water was not captured and dispersed via the stormwater systems.
Water ponded on the concrete paving then entered the home, damaging timber flooring.
The insurer says it is not liable for the damage to the roof and the flooring because the
complainant has not shown either were damaged by the storm. Further, it relies on general
exclusions set out in the PDS, precluding cover for damage to or caused by, connected with
or arising from:
any part of the home not being in good condition (PDS, page 30)
wear, tear or gradual deterioration (PDS, page 33)
defects, faults or poor workmanship (PDS, page 33).
Complainant disagrees
The complainant maintains that the storm damaged the roof and that the resulting water
ingress damaged the flooring.
The complainant has not provided expert reports in support of his position. However, he says
that several of the insurer’s experts found the roof was in good condition prior to the storm.
He questions the reliability of AA’s findings given they are only based on a drone inspection.
Insurer is entitled to deny roof and floor damage
The insurer’s experts have documented that the roof is affected by age related wear and tear,
has required and continues to require maintenance. They have provided many supporting
images. AA confirms there were no signs of storm created openings or impact damage.
The panel is not satisfied that a drone inspection cannot reasonably be relied upon. The
panel also acknowledges that some of the insurer’s experts refer to the roof being in generally
good condition. However, that does not establish that the storm damaged the roof.
SE has persuasively explained how the flooring has been damaged by water ingress due to
construction defects rather than storm.
In the circumstances, and in the absence of any expert reports countering those of the
insurer, the panel is satisfied that the roof and floor damage is due to wear and tear,
maintenance issues and defects, not the storm.
The insurer is therefore entitled to decline to cover the roof and flooring damage.
2.2 Should the insurer pay for further mould remediation?
Yes, to an extent. There are concerns about the adequacy of the insurer’s remediati on.
However, it also appears likely some of the ongoing mould is due to factors for which the
insurer is not responsible. To promptly resolve the dispute, the insurer is to pay 50% of the
cost of the actions recommended by the complainant’s mould expert, I E.
Parties disagree on the adequacy of insurer’s mould remediation
On 18 March 2022, the insurer’s restorer, RX, inspected the home. RX confirmed the
presence of some mould, which it treated with an antimicrobial solution. It said there was no
mould actively growing at the time of attendance. RX said moisture readings showed no
humidity in the ceiling space or carpet.
Determination | Case number: 915795 Page 6 of 12
On 1 July 2022, the insurer’s assessor attended the home. He noted that mould was affecting
various areas and was on contents throughout the home. The assessor considered that the
mould was atmospheric and unrelated to the storm event but arranged for RX to reattend.
RX provided a scope of works (SOW) dated 7 July 2022, quoting $30,874.80 for mould
remediation. It also arranged for hygienist RI to undertake an assessment on 19 July 2022.
Pen ding receipt of RI’s report, the insurer advised the complainant that it had requested RX to
reattend the home to install HEPA vacuums, air scrubbers and dehumidifiers ‘to limit the
mould from spreading further’.
In its report dated 17 August 2022, RI said:
water damaged and mould affected materials were identified in bedroom two and the
bathroom, resultant from a top down water ingress event
all other areas in the home had experienced the occurrence of environmental mould
growth, consistent with prolonged high humidity indoors due to moisture evaporation from
wet materials
there was potential evidence of excess moisture ingress through the concrete slab in the
dining and kitchen area
mould remediation was required as well as further invasive investigations.
Following the inspection it undertook on 21 August 2022, SE said:
Mould was identified to the bedroom ceiling from the claimed event, due to the
failures to encapsulate it or remove it, has resulted in mould spreading. With the
residence left unoccupied and sealed for an extended period of time has created
an environment for surface mould to form and spread throughout.
In an assessment report dated 7 September 2022, another of the insurer’s assessors
in terpreted SE’s report to mean that mould had spread ‘due to poor make safes by previous
personnel’. The assessor recommended a hygienist be engaged to provide a report to
confirm if the mould growth was event related and on how to best remediate the mould.
On 16 September 2022, RX reattended the home. It reported that the entire home had
become ‘heavily affected due to mould contamination’. It also said that as the home had been
damaged since February 2022, most contents items were heavily affected and would have to
be disposed of. It quoted $20,730.88 for remediation works. The reason the quoted amount
had reduced since July 2022 is not clear but it may be some of the work had been done.
RX was instructed to proceed with the required remediation.
On 28 October 2022, RI reinspected the home and issued a post remediation verification
certificate (PRV). RI certified that the home had been assessed and determined to have been
cleaned, remediated and dried in accordance with international industry best practice
guidelines and standards. However, RI added caveats to its certification, including that:
it was based on the understanding the source of water ingress had been rectified
it only related to the condition of the home as at the date of inspection
at the time of inspection, the home was a building site with exposed structural elements
and not suitable for occupancy
elevated moisture levels were detected in the concrete floor area, likely due to unrelated,
pre-existing and ongoing causes
the PRV excluded the air conditioning units, retained contents/fittings/fixtures and isolated
elevated moisture in concrete.
Determination | Case number: 915795 Page 7 of 12
The complainant says the works set out in RX’s SOW was not competed as the floors,
kitchen and all mould affected materials were to be removed and the home restored to its pre-
event condition. He says that did not occur before RI issued its PRV. He also says the PRV is
false as no laboratory test samples were taken and drying equipment was never installed.
The complainant has provided an example of a more comprehensive PRV (unrelated to the
claim) and suggests that RI’s PRV is simp listic and unreliable.
He has also provided a report dated 21 December 2022 by IE, mycologist. In air samples
taken on 16 December 2022 IE detected elevated mould levels in the lounge room, dining
room, and a bedroom. The results were consistent with recent active mould growth. Mould
composition and genera associated with damp buildings were detected. IE recommended:
remediation works be conducted by experienced technicians according to the ANSI/IICRC
s520 standard
HEPA filtration and negative ventilation be installed for the duration of remediation works
and an additional several days post remediation to mitigate airborne spore load
enough HEPA filtration units to perform a minimum of 4 air exchanges/hour be installed
post remediation sampling be conducted to help ensure the mould contamination has been
adequately removed.
RI has commented on IE’s report. RI refer red to the caveats to its PRV and noted IE’s testing
was performed some two months later. RI said the mould IE identified could be linked to
ongoing issues with the leaking roof, building repair work or unrelated environmental
influences. It also raised concerns about the reliability of the IE’s findings, but said it would
need to undertake a further site assessment to comment further.
On 18 Jan uary 2023, the insurer denied responsibility for mould that had developed post RI’s
PRV. It said the mould was due to the complainant’s failure to rectify the maintenance issues
relating to the roof and the pergola.
Insurer is to contribute to further mould remediation costs
The panel acknowledges that RI’s PRV is relatively brief and does not include testing results.
Further, the criticisms the complainant has made of RX’s remediation works are concerning.
On the other hand, it appears more likely than not that the maintenance issues affecting the
roof and the pergola (and therefore the flooring) have contributed to the ongoing mould
growth. It is significant that RI in its PRV in effect identified that those matters could lead to
further mould.
The panel notes RI’s comment that it would need to undertake another site assessment to
comment further. The panel considers that the relationship between the parties is irretrievably
broken. Another assessment will prolong the interactions between them and it seems
inevitable that further disputes will develop as a result.
Accordingly, noting the arguments going both ways but so as to reach a prompt resolution,
the panel considers it fair and reasonable that the insurer pays the complainant as a cash
settlement a 50% contribution towards the cost of the remediation work recommended by IE.
The insurer is to request a hygienist not previously involved in the claim to prepare a desktop
quote actionable by a retail customer for the cost of undertaking the recommended actions
set out in IE’s report dated 21 December 2022. Upon receiving the hygienist’s quote, the
insurer is to provide a copy of it to the complainant and pay him 50% of the quoted amount.
Determination | Case number: 915795 Page 8 of 12
2.3 Is the insurer to pay more to settle the building damage?
Yes. Whether the quote the insurer relied on was actionable by a retail customer is somewhat
uncertain and the insurer did not include a contingencies uplift. As the insurer’s quote is the
only one available and the parties’ relationship has broken down, a high er than usual 30%
uplift on the quote is to be paid plus interest from the date of the cash settlement.
Insurer has paid a cash settlement
On 22 August 2022, AB provided a SOW for building repairs in which it quoted $8,547.67.
After a dual assessment on 28 November 2022, AB provided an updated SOW in which it
quoted $18,926.43 as the cost of covered internal building repairs. The updated SOW was
dated 22 August 2022, but it seems likely this was due to a failure to correct the date from the
first SOW. AB said it could not warrant the works due to the identified maintenance issues.
On 29 November 2022, the insurer informed the complainant it intended cash settling the
building damage claim for $18,926.43. The complainant disputed the adequacy of the cash
settlement proposal.
On 4 January 2023, the insurer advised the complainant that it would be proceeding with the
$18,926.43 payment.
On 18 January 2023, the insurer wrote to the complainant advising that it would be sending a
cheque for $18,926.43 to the insured address to allow him to start repairs. The insurer noted
the payment did not prevent his complaint to AFCA from proceeding. The insurer says the
cheque was raised on 19 January 2023. The complainant has confirmed receipt.
Insurer is to pay a further amount for contingencies
A cash settlement must be based on a reasonable quote for claim related repairs, actionable
by a retail customer. An uplift is then to be applied to the quoted amount to allow for
contingencies and the loss of the lifetime guarantee that applies to insurer approved repairs.
Whether AB’s updated SOW/quote was actionable by a retail customer is somewhat
uncertain. The fact that AB said it could not warrant the repairs it had outlined tends to
suggest it may not have been (although, the panel agrees it was reasonable for the insurer to
resolve the claim through a cash settlement payment given the maintenance issues).
On the other hand, no competing SOW/quote has been provided. Further, the complainant’s
main conc erns as to the adequacy of AB’s updated SOW appear to primarily relate to the
non-inclusion of roof and flooring repairs. As noted above, the panel is satisfied the insurer is
entitled to deny liability for those repairs.
It is also notable that the cash settlement was paid soon after the updated SOW was
prepared so it is unlikely the costings no longer reflected current prices.
The insurer did not include a contingencies uplift in the cash settlement payment. When
AFCA asked why it did not do so, the insurer responded ‘ there is no provision in the policy
terms that would require it to include an additional uplift fee for the transfer of risk in the
instance of a cash settlement for building works ’ .
As the insurer’s cash settlement offer and payment were mad e after the complainant lodged
his complaint with AFCA, and AFCA’s position that a cash settlement should reasonably
include a contingencies uplift is well known, the panel finds the insurer’s response surprising.
The panel is satisfied that an uplift should have been applied.
Determination | Case number: 915795 Page 9 of 12
Noting the parties’ very poor relationship, the panel is concerned further inspection and
assessment will result in more delay and further disputes. It also notes the passage of time
since the insurer paid the $18,926.43.
On balance, in an effort to promptly finalise the dispute, the panel considers it reasonable to
require the insurer to pay a higher uplift than would typically be applied. The higher uplift is
payable instead of a further assessment.
The insurer is required to pay the complainant $5,677.93 (a 30% uplift on $18,926.43). As an
uplift should have been included with the cash settlement, it is also to pay interest on that
amount pursuant to section 57 of the ICA from 19 January 2023 (date cash settlement
cheque was raised) until the uplift amount is paid.
2.4 Is the insurer required to pay additional TA costs?
Yes. The insurer has materially contributed to the complainant having to incur TA costs after
the policy limit was exhausted. It is pay the complainant $16,800 ($700pw for six months).
Insurer has paid out TA policy limit
The PDS includes, as an additional benefit,cover for TA costs during the period the home is
rendered unliveable as a result of damage the insurer accepts as covered. The limit payable
for any one incident is 10% of the home sum insured . The complainant’s TA costs policy limit
was therefore $30,760.80.
On or about 13 May 2022, due to continuing water ingress into the home and worsening
mould, the insurer moved the complainant and his family into TA. At the time, the insurer
estimated that approximately three months of TA would be required. The insurer was forced
to pay rates of up to $640/night due to a lack of available cheaper accommodation.
On 24 June 2022, the insurer informed the complainant that it had already paid $15,239.05 in
TA costs and would pay him the remainder of the policy limit ($15,521.75) as a cash
settlement. The $15,521.75 was paid that day.
Insurer has contributed to complainant needing further TA
The complainant says that the insurer’s poor claim handling and delays have meant that his
home has remained unliveable to date. In October 2022, he estimated that in his local area
the average rent was $600pw and the average utility cost was $200pw.
He wants the insurer to pay him additional TA costs approaching $150,000.
The insurer says it has no liability for TA costs under the policy once the limit is paid out.
The panel is satisfied that the insurer has materially contributed to the complainant having to
incur TA costs after the policy limit was exhausted. It did not attend to make safe repairs to
the roof until 25 May 2022, three months after the storm. It appears those repairs were
inadequate, and it was not until late August 2022 that a tarp was installed.
Further, it is apparent that t he mould contamination became worse due to the insurer’s delays
and ineffectual attempts at rectification.
However, the panel accepts that the complainant’s continuing need for TA is not solely due to
the insurer’s conduct. The maintenance issues for whic h the insurer is not responsible have
also materially contributed to the mould problem.
Determination | Case number: 915795 Page 10 of 12
The General Insurance Code of Practice (GICOP) sets four months from claim lodgement as
the standard time frame within which an insurer is to make its claim decision. That period
expired around the same time as the end of the insurer’s three month TA estimate. The
insurer’s building cash settlement payment was made about six months later.
The panel is satisfied that it is reasonable that the insurer pays for six months of TA in
addition to the policy limit, at $700pw. That rate is close to the total weekly amount the
complainant suggested and in line with the $100/night the insurer said it would allow if the
complainant stayed with family and friends (and which seems to have occurred often).
The insurer is to pay the complainant an additional $16,800 ($700pw x 24 weeks).
2.5 Is the insurer required to pay more for contents damage?
No. By 1 July 2022, contents throughout the property were already mould affected. The
contents were subsequently disposed of and it is not possible to determine whether the
insurer’s delays meant that salvageable items became unsalvageable.
Complainant says insurer is responsible for additional contents damage
The complainant acknowledges that the insurer paid him the contents sum insured of $70,000
on 18 November 2022. However, he says the insurer’s poor claim handling and delays meant
that more of his contents became mould contaminated and had to be thrown away than would
otherwise be the case.
Taking into account cost of living increases, the complainant seeks a further $126,000 for loss
of contents.
Insurer is not required to pay more for contents damage
The panel a ccepts that the insurer’s claim handling and delays did lead to worsening mould
contamination but notes that the ongoing maintenance issues also materially contributed .
By 1 July 2022 (four months after claim lodgement) contents throughout the property were
already mould affected. It appears that the contamination became markedly worse after that.
The contents were disposed of on 4 October 2022.
There is no information that enables an assessment of whether the insurer’s delays meant
that salvageable items became unsalvageable, or if they did, the extent of this separate from
the maintenance issues contribution. It also notes that the complainants chose to insure their
contents for $70,000, which appears to have been an insufficient sum insured.
The panel is on balance not satisfied it is reasonable to require the insurer to pay more for the
contents damage.
The panel notes that the insurer previously accepted carpet damage. The panel’s decision
regarding the contents complaint does not affect that acceptance and the insurer is to stand
by that earlier decision.
2.6 Is non-financial loss compensation payable?
Yes. The insurer’s delays and poor claim handling has caused the complainant major stress
and inconvenience and affected his mental health. The insurer is required to pay $5,400 as
compensation. However, the panel considers the insurer’s privacy breach apo logy sufficient.
Determination | Case number: 915795 Page 11 of 12
AFCA can award compensation for poor claim handling
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss
(capped at $5,400 per claim) where the insurer’s actions have caused an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or peace of mind.
When considering an award for non-financial loss, AFCA considers the severity and impact of
the insurer’s conduct on the particular complainant.
Insurer has caused major stress and inconvenience
The complainant says the insurer’s poor claim handling and delays meant he and his family
have been out of their home for an extended period. He refers to experiencing huge volumes
of stress and inconvenience, as well as lack of empathy from the insurer.
The complainant has provided information confirming the adverse impact those matters have
had on the physical and mental health of the whole family, necessitating hospital attendances
and ongoing medical treatment.
The panel is satisfied that the insurer is responsible for extensive delays, during which the
damage to the complainant’s home and contents worsened. It is also apparent that the
insurer’s continuing inadequate attempts at make safe repairs were especially frustrating for
the complainant. There have also been instances of poor communication.
The panel is satisfied the insurer’s poor claim handling and delays have had a major impact
on the complainant. It is reasonable that it pays him $5,400 in non-financial loss
compensation.
The complainant also says that the insurer breached his privacy by sending information
concerning his claim to another individual it insures. The insurer has acknowledged the
breach, which it says occurred due to human error. It has apologised to the complainant and
says it has followed its privacy breach procedure.
The panel is not satisfied that a separate award of non-financial loss compensation for the
privacy breach would be fair. It considers the insurer’s apology sufficient. It is open to the
complainant to raise his concerns with the Office of the Australian Information Commissioner.
2.7 Why is the outcome fair?
It is fair that the insurer pays additional amounts where its delays have more likely than not
caused the complainant further loss and given that it did not include a contingencies uplift in
its cash settlement payment.
Determination | Case number: 915795 Page 12 of 12
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.