Unsatisfactory bathroom repairs by insurer's supplier, reimbursement of fixtures and non-financial loss

FirmHollard
Decided2023-11-09
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$2,975
Non-financial loss$3,000
Amount claimed—
SourceAFCA PDF

Summary

The complainant's home insurer accepted an escape of liquid claim but its appointed repairer's bathroom work was unsatisfactory. AFCA required further repairs, reimbursement of $2,975 for fixtures and $3,000 non-financial loss.

The insurer approved the variations and elected to repair through its supplier, so it remained responsible for the unsatisfactory repairs, necessary fixture costs and the resulting delay and stress.

Issues

Subjects and remedies

elderly or capacityhealth or medicalhome or building damagepay compensationpay non financial lossrepair or rectify

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination Case number 915564 Financial firm Hollard Insurance Partners Limited (insurer) Determination | Case number: 915564 Page 1 of 9 Case number: 915564 2 November 2023 1 Determination overview 1.1 Complaint The complainant held a home insurance policy with the financial firm (insurer). He lodged a claim for escape of liquid from a fixed pipe in a bathroom of the insured property, in November 2021. The insurer accepted the claim. The insurer appointed AG to repair the damage. The complainant is not happy with the repairs and says the insurer:  should repair the unsatisfactory work done in the bathroom, and  pay him compensation for the inconvenience, stress and anxiety he experienced throughout the claim process. The insurer accepted the claim and authorised repairs but says it is only liable for the cost of rectification required due to the claim and it is not liable for any rectification works to upgrades to the bathroom. 1.2 Issues and key findings Does the insurer have to undertake further repairs? Yes. The insurer must affect repairs to eliminate escape of water from the shower area, replace the cabinet with a 650mm deep cabinet and attend to rectification works agreed to by AG. Does the insurer have to reimburse the complainant? Yes. The complainant paid for bathroom fixtures and their installation. This was necessary to make the bathroom functional. The insurer must reimburse the complainant $2,975. Is an award for compensation appropriate? Given the unusual degree of stress, inconvenience and the delays experienced by the complainant in the handling of his claim and complaint, the insurer is required to pay the complainant $3,000 in non-financial loss compensation. Why is the outcome fair? The outcome is fair in all the circumstances because the repairs to the bathroom are unsatisfactory, the complainant expended his own monies and has suffered an unusual degree of stress, inconvenience and delays in the handling of his claim and complaint. 1.3 Determination This determination is in favour of the complainant. Within 14 days of acceptance of this determination the insurer must:  pay the complainant $5,975 ($2,975 reimbursement and $3,000 compensation), and  attend to the rectification works as outlined in this determination as expeditiously as possible. Determination | Case number: 915564 Page 2 of 9 2 Reasons for determination 2.1 Does the insurer have to undertake further repairs? Yes. The insurer must affect repairs to eliminate escape of water from the shower area, replace the cabinet with a 650mm deep cabinet and attend to rectification works agreed to by AG. The policy It is not in dispute the complainant was provided with the product disclosure statement (PDS) which sets out the terms and conditions of the policy. The PDS says: How we settle a claim Building, Contents and Portable Contents claims If we pay your claim we will, in consultation with you:  repair your damaged property where it is practicable and economical to do so;  replace your lost or damaged property where it is not practicable and/or economical to repair it; or  pay you the value that fairly represents your loss, in the form of cash or a pre-paid store card*, up to the relevant sum insured stated on your current Certificate of Insurance. The complainant has the initial onus of proof It is established insurance law the insured has the onus to establish, on the balance of probabilities (that it is more likely than not), there is a valid claim because the loss or damage claimed is due to an insured event that falls within the policy terms. It is not in dispute that the insurer accepted the complainant had shown a valid claim under the ‘Escape of Liquid’ insured event. Once the insured satisfies this onus, the onus shifts to the insurer to prove, on the balance of probabilities the claim is not covered by the policy due to policy exclusions or limitations. The insurer says it not responsible for any further repairs The insurer says AG completed major changes to the bathroom at the complainant’s request. These included among other things:  removal of the bath and shower hob  upgraded basins  tile upgrades, and  cabinetry modification. The insurer says:  the policy only covers returning the property to its pre-incident condition, not betterment  if it had been made aware of the intention to upgrade the bathroom in lieu of only repairing it, it would have cash settled the complainant for the costs of repairs  there were no issues with or damage caused to any fixtures and they did not have to be replaced Determination | Case number: 915564 Page 3 of 9  it informed AG to keep the costs of the repairs within scope and this does not mean it was advised of or approved any bathroom upgrades  the upgrades were a private matter  a clear line needs to be drawn between insured works and private upgrades, and  it is not responsible for any disputed items relating to upgrades completed and this has to be resolved between AG and the complainant. The complainant says the repairs were faulty The complainant says he was advised by AG that the bath had to be removed, the existing bath was unsalvageable and they may as well change the layout of the bathroom. AG suggested the new design and he agreed to it. The complainant is not happy with the repairs because:  there is insufficient lean/drop on the shower floor and this results in excess water flooding in the bathroom and the room next to it  the replaced cabinet size (about 420mm) is smaller than the original (about 650mm), and  the gap between the cabinet tops and laminate could potentially cause water to seep in future. The complainant says the insurer should:  replace the cabinet, and  provide a new shower screen. The insurer was aware of variations to the original scope of works I have examined all the information provided including pictures of the original bathroom design and the repairs and changes made to the bathroom. The insurer says if it had been made aware changes were to be made to the pre-incident condition of the bathroom, it would have cash settled the complainant for the cost of covered repairs. The insurer’s claim notes show AG was the insurer’s supplier and on 16 May 2022 the insurer paid AG’s final invoice of $47,056. 54 dated 27 April 2022. AFCA has been provided with a scope of works (SOW) provided by AG and signed by the complainant on 2 January 2022. This SOW is entitled ‘Terms and conditions for insurance repairs’ and notes:  at point 3.1 - ‘Service as per Scope of Works authorised by your insurer’  at point 3.2 - ‘ Price: $29,630.11 ’. The insurer’s claim notes dated 28 January 2022 indicate that AG wa s ‘unable to warrant works’ and had requested a urgent review for ‘variation for $17.4K approx.’ The reasons noted were ‘ remove compacted earth to sub-floor in bathroom ’ and ‘supply and install concrete slab to bathroom sub- floor’. The insurer’s claim not es dated 3 February 2022 say AG said ’Existing bath and shower parts need to be replaced. It was common practice and complaint at that time, not to pour the slab. Bottom of the bath is rusted being sitting on the builder’s slab’…’Can we cover the variation arising out of this situation’ . On 21 April 2022 the insurer messaged AG asking: Hi [xxxx], Determination | Case number: 915564 Page 4 of 9 As long as INS's building design was compliant when the building was constructed, it will be Builder's responsibility to put the Bathroom back to the current building standards/codes. - As long as the total building repairs costs don't exceed 50k, it is ok to proceed with the variations. [AFCA emphasis] So, please go ahead with the works if the above applies. Kind regards, [xxxx]. ________________________________________ - AG response: AG confirm the existing condition of the bathroom was compliant at the time of the original build, the total variation is within 50K limit. Can you please approve the variation on [xxx] - Insurer messaged them back advising ok to proceed with the variation [AFCA emphasis]. The insurer says it was not aware of any proposed changes to the pre-incident condition of the bathroom. However, the claim notes clearly indicate the insurer was made aware of changes to the SOW dated 2 January 2022 and agreed to a variation in costs in excess of $20,000. It appears this was to ensure AG could warrant repairs. AFCA has not been provided with a SOW to show precisely what ‘the variations’ relate d to. However, it is clear the insurer was made aware that AG had to ‘remove compacted earth to sub- floor in bathroom’ and ‘ supply and install a concrete slab to the bathroom sub- floor’ ‘the existing bath and shower parts need to be replaced’ and ‘the bottom of the bath is rusted being sitting on the builder’s slab’ . I am satisfied that the insurer was aware that AG had to supply and install a concrete slab to the bathroom sub-floor, the existing bath was unsalvageable and had to replaced and shower parts had to be replaced. The insurer approved a total variation to works up to a limit of $50,000. However, there is no information to show what the total variations to the SOW were. From the information provided it appears AG failed to arrange for a new SOW to reflect the variations and the insurer failed to follow-up. A new SOW in April 2022 would have provided clarity to the parties. The insurer and AG say the complainant asked for a new freestanding bath and open shower instead of a like-for-like shower bath hob replacement. The complainant says AG informed him the existing bath was unsalvageable and recommended the new layout and design of the bathroom. On balance, I accept the complainant relied on AG’s expertise about the new layout and design of the bathroom, given his maturing years and lack of knowledge in bathroom renovations. I am satisfied there was no separate agreement between AG and the complainant to upgrade the bathroom. I am also satisfied the insurer was made aware of variations to the original layout and design of the bathroom and approved AG to proceed given the ‘total variation is within 50K limit’ in April 2022. The insurer did not elect to cash settle the claim and authorised its supplier to do Determination | Case number: 915564 Page 5 of 9 the repairs. I do not accept the insurer’s contention that the accountability of the completion of repairs was completely transferred to AG. The insurer must attend to repairs The insurer asked AG to review the repairs that were done. AG reported on the repairs that were done AG said:  the fall created met with the Australian Building Code  the complainant said he was upgrading the shower and bath at his own cost  the frameless shower screens the complainant installed are open and allow water to expel from the shower area and into the bathroom floor in a large volume, flooding the bathroom and into the hallway, and  the complainant needs to install an adequate shower screen to ensure water does not expel from the shower area and it recommended a semi-frameless shower screen to be installed with a lip to contain the water in the shower. The insurer must affect repairs to eliminate escape of water from the shower area The insurer initially declined to do anything about the ongoing shower leak as AG said the fall in the shower floor was built according to Australian Building Standards. On 13 April 2023, TK, Rectifications Supervisor at AG, informed the complainant he agreed to arrange for an enclosed shower screen to be installed to the bathroom to work with the current floor tiling arrangement as the current shower screen is not fit for purpose silicone and seal the perimeters of the bath with white silicone. On 9 May 2023, the complainant accepted the shower screen that was recommended by AG. The insurer must install an appropriate shower screen to ensure water does not flood not the bathroom and escape to adjoining rooms/areas and silicone seal the perimeters of the bath with white silicone, as AG stated the current design is not fit for purpose. The insurer should provide a SOW and provide a copy to the complainant for him to sign and take all necessary steps to see that these repairs are completed in a time fashion. The insurer must replace the cabinet with a 650mm deep cabinet The complainant says:  the new bench top width is only 420mm and significantly smaller than the original 650mm resulting in significantly less storage space and not like for like  there is also a gap in the cabinet top which will inevitably lead to water getting in and the entire top warping/swelling. On 13 April 2023, TK emailed the complainant and said he would arrange the following rectifications:  remove replace vanity top due to unsightly benchtop joins (size of vanity and top remains the same)  repair vanity kick boards due to defective corner mitres, and  silicone seal vanity kick boards in white silicone. On 22 May 2023, TK emailed the complainant and said he would also allow for the following rectification works:  new deeper vanity benchtop to be installed to be 500mm deep instead of the current depth of 430mm  2X new deeper end panels to be installed Determination | Case number: 915564 Page 6 of 9  vanity cabinets to be relocated with 70mm void behind to ensure benchtop has correct overhang  vanity kickers to be repaired and reinstalled to suit new depth  vanity basins to be removed reinstalled to align with door centres  plumbing to be modified to suit new arrangement, and  white Silicone to be reapplied on completion. The insurer says the complainant agreed to the smaller size cabinet. The complainant says as the repair job had been dragging on for so long he felt pressured to accept the smaller cabinet. He says he is entitled to a like for like size replacement. The insurer is responsible for providing a like-for-like replacement size cabinet. There is been no information provided to show a similar size cabinet could not have been installed in the bathroom. It is clear from the correspondence provided there were significant issues with the cabinetry provided. The rectifications works agreed to by AG, outline some of the issues of concern. The insurer must:  replace the bathroom cabinet with a similar size (650 mm deep) prior to the repairs being undertaken  ensure the rectification agreed to by AG as noted above are attended, and  if possible leave the current benchtop cabinet and sinks in place until a replacement benchtop is made available so the bathroom is functional until repairs are completed. The insurer should provide a SOW and provide a copy to the complainant for him to sign and take all necessary steps to see that these repairs are competed in a timely fashion. 2.2 Does the insurer have to reimburse the complainant? Yes. The complainant paid for bathroom fixtures and to have them installed. This was necessary to make the bathroom functional. The insurer must reimburse the complainant $2,975. The insurer must reimburse the complainant for fixtures and installation costs The complainant says he paid $2,975 inclusive of GST for the re-run of new lines for hot and cold-water service, 2x vanity taps and a shower mixer tap ($1,800) and a free standing bath left hand corner 1500mm ($1,125); double rail 600MM ex display ($50). The insurer declined to reimburse the complainant and says as there were no issues with or damage caused to any fixtures in the bathroom the fixtures did not have to be replaced because of the claimed incident. As noted earlier in this determination, t he insurer’s claim notes dated 3 February 2022 say AG said ’Existing bath and shower parts need to be replaced….. Bottom of the bath is rusted being sitting on the builder’s slab’…’Can we cover the variation arising out of this situation’. It is clear the bath and shower parts had to be replaced and the insurer was made aware of this. As noted earlier in my determination the insurer was made aware of variations to the original layout and design of the bathroom and approved AG to proceed given the ‘total variation is within 50K limit’ Determination | Case number: 915564 Page 7 of 9 The money the complainant expended was necessary and required for the bathroom to be functional. The insurer must reimburse the complainant $2,975. 2.3 Is an award for compensation appropriate? Yes. Given the unusual degree of stress, inconvenience and hardship experienced by the complainant in the handling and settlement of his claim and complaint, the insurer should pay the complainant $3,000 in non-financial loss compensation. AFCA can award compensation for non-financial loss Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which caused an unusual degree of stress, delay or inconvenience. The complainant says the claims and complaint process caused him stress The repairs to the bathroom have been drawn out and have taken more than a year resulting in a significant amount of ongoing stress and inconvenience for the complainant. He was also unwell and receiving treatment for cancer and the delays in rectifying the repairs caused additional stress. The flooding of water from the shower is an ongoing concern and dangerous. The insurer’s management of the complainant’s claim was unsatisfactory On 19 November 2021, AG inspected the insured property and recommended to the insurer that the complainant’s claim be accepted as the damage occurred due to a singular once -off policy listed event of escape of liquid. The insurer accepted the claim on 6 December 2021. The insurer’s claim notes sh ow that on 13 June 2022, the complainant:  was waiting for AG to replace the ill-fitting basins on the double vanity and for the adjoining wall to be painted  AG had agreed to carry out completion of tasks but had not acted  was generally unhappy with the quality of the work, and  had raised concerns the insurer had paid AG ’s final invoice when the repairs had not been completed. The insurer’s claim notes and other information provided also show the complainant continued to raise concerns with the insurer ab out the quality of the repairs and AG’s failure to attend to fixing the unsatisfactory work until November 2022. On 30 June 2023, AG told the insurer it had been working with the complainant on rectification works and had arrived with a scope of rectification works with the complainant, but the complainant asked AG to halt rectification works. Given the complainant had raised a complaint with AFCA about the poor quality of repairs it was reasonable for the complainant to question the proposed repairs to the vanity and ask AG to halt rectification works. As explained earlier in this determination I am not satisfied there was a separate agreement between the AG and the complainant to upgrade the bathroom as claimed by the insurer. The insurer authorised and paid for its supplier AG to effect repairs the bathroom which were unsatisfactory. The complainant’s first raised concerns on June 2022 and there have been Determination | Case number: 915564 Page 8 of 9 inordinate delays in attending to rectification works. The insurer had the responsibility of managing and coordinating the rectification of the repairs with AG. Given the unusual degree of stress, delays and inconvenience experienced by the complainant in the handling and settlement of his claim and complaint, the insurer should pay the complainant $3,000 for non-financial loss. 2.4 Why is the outcome fair? The outcome is fair in all the circumstances because the repairs to the bathroom are unsatisfactory, the complainant expended his own monies and has suffered an unusual degree of stress, inconvenience and delay in the handling of his claim and complaint. Determination | Case number: 915564 Page 9 of 9 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.