Home / Suncorp Group / Determination 915520
Determination 915520
Cash settlement amount, contingency uplift, loss of rent and claim handling
Summary
Landlord insurer accepted a water damage claim but the cash settlement and handling were disputed. AFCA found for the complainant, requiring an additional 10% contingency uplift, interest, extended loss of rent and $5,400 non-financial loss.
A cash settlement must fairly account for transferred risk using AFCA's 15-20% contingency, and the insurer's poor handling warranted maximum non-financial loss compensation.
Issues
- Claim amount dispute primary · upheld“10% contingency uplift not consistent with AFCA approach of 15 to 20%; insurer to include additional 10% uplift of $16,033.72”
- Poor claim handling secondary · upheld“insurer's handling of the claim has not been satisfactory; effect on complainant at the more serious end of the spectrum”
- Delay secondary · upheld“insurer accepts that there have been delays and service issues causing undue frustration and inconvenience”
- Policy cancellation or underwriting secondary · unclear“not appropriate for me to decide the insurance renewal issue at this time”
- Product terms interpretation secondary · not upheld“insurer's obligation does not extend to covering the cost to make the damaged components comply with current Standards”
- Third-party or outsourcing failure secondary · upheld“complainant concerns about insurer's builder AM; relationship with insurer and its representatives has broken down”
Subjects and remedies
broker or intermediaryhome or building damagepay claimpay interestpay non financial loss
Related
All Suncorp Group determinations · Find similar determinations
Text of the determination
Determination
Case number 915520
Financial firm AAI Limited
Determination | Case number: 915520 Page 1 of 9
Case number: 915520 25 May 2023
1 Determination overview
1.1 Complaint
This complaint relates to a claim by the complainant under his landlord insurance policy held
with the financial firm (insurer), for water damage to the insured property.
The insurer accepted the claim, but a dispute continues as to the insurer’s proposed
settlement and how the insurer and its representatives handled the claim.
1.2 Issues and key findings
Is the insurer’s proposed settlement satisfactory?
No. The insurer is required to meet its obligations to the complainant by complying with the
provisions of this determination.
Has the insurer ’s handling of the claim been sa tisfactory?
No. The insurer’s handling of the claim has not been satisfactory, and upon acceptance of
this determination by the complainant, the insurer is required to pay the complainant $5,400
non-financial loss compensation.
Why is the outcome fair?
The outcome is fair as the insurer has not met its obligations to the complainant and its
actions have left much to be desired.
1.3 Determination
This determination is in favour of the complainant.
The insurer will meet its obligations to the complainant by complying with the provisions of
this determination.
Determination | Case number: 915520 Page 2 of 9
2 Reasons for determination
There has been a full exchange of all material information relied on for the purposes of this
determination and each party has had the opportunity to address all issues.
This complaint has been determined based on what is fair in all the circumstances, having
regard to the relevant law, good industry practice, codes of practice and previous decisions
where applicable.
While the parties have raised numerous issues in their submissions, for the purposes of this
determination commentary has been restricted to those issues considered directly relevant to
the outcome only.
2.1 Is the insurer’s proposed settlement satisfactory ?
Coverage of the policy
The complainant’s landlord insurance policy provides cover for loss or damage to the property
at the insured address caused by an insured event during the period of insurance.
The coverage provided by the policy is subject to conditions, limitations, and exclusions. This
means that not all loss and damage is automatically covered. Rather, only loss and damage
caused by an insured event, during the period of insurance and subject to the conditions,
limitations and exclusions, is covered.
The full details of the policy coverage, conditions, limitations, and exclusions are contained
within the Product Disclosure Statement (PDS) and Certificate of Insurance (COI).
I am satisfied that the PDS and COI have been provided to the complainant. Therefore, the
insurer is entitled to rely upon the terms of the policy, including its conditions, limitations, and
exclusions, to determine its obligations to the complainant.
Insure d events include “Flood” and “Storm”.
It is accepted insurance law that the complainant carries the initial onus to establish, on the
balance of probabilities (that is, more likely than not), a loss which is covered by the terms
and conditions of the policy.
Once the complainant has established a loss which is covered under the policy, the onus
transfers to the insurer to establish the application of a condition, limitation or exclusion upon
which it seeks to rely, to limit its obligations regarding the claim, or to deny the claim.
Circumstances of the loss and claim
The complainant contacted the insurer on 28 February 2022, to lodge a claim for water
damage at the insured address.
The insurer accepted the claim, but a dispute continues as to the insurer’s proposed
settlement and how the insurer and its representatives handled the claim.
Cash settlement
The complainant would prefer that the insurer complete repairs, however, he is concerned
that the insurer’s builder (AM) has provided a quotation but will not warrant repairs.
Determination | Case number: 915520 Page 3 of 9
The insurer says that due to maintenance and non-claim related issues, it is unable to
complete repair of the claim related damage.
I am satisfied that the provisions of the policy coverage allow the insurer to cash settle a
claim.
The PDS details:
How we settle property claims
We will aim to use a member of our supplier network to repair or rebuild the
damage to the property. Sometimes, this is not always possible for example if
there is pre-existing damage. This will determine how the property claim will
be settled.
… .
In addition, I am concerned that given the circumstances of the claim, the relationship
between the complainant and the insurer and its representatives has broken down, and note
the complainant’s own statement:
….as well as obvious fundamental breakdown in relationship….
The complainant says, amongst other things:
There is repeated evidence of an inability to provide service creating the likelihood of
further errors,
He has little faith in AM’s ability to provide a scope of works and he has had many
unfavourable and potentially coercive interactions with AM,
He has been dismissed, lied to and treated unfairly, and as the problem,
His brother caught a tradesman from AM breaking into and entering the property,
There is little reason to trust AM’s approach based on evidence to date, and
Ongoing incorrect assumptions by the insurer, including inappropriate usage of
building Standards.
The removal of AM and replacement with an alternate builder would, I believe, only remove
part of the relationship problem between the complainant and the insurer.
In addition, AM has had a long term and intimate involvement in the claim and the complaint.
The engagement of an alternate builder would, in my view, only lead to extended delay and
would not necessarily remove the concerns that the complainant has with the insurer.
I am satisfied that in the circumstances of this claim, the insurer is entitled to elect to cash
settle the claim.
However, if the insurer chooses to cash settle the claim, it must do so fairly.
Cash settlement of a claim results in:
The loss to the complainant of the insurer’s lifetime guarantee on the r epairs,
The transfer of the stress and inconvenience of managing repairs to the complainant,
The transfer of the risk of yet unknown damage, to the complainant and
Any increase in the cost of repairs is borne by the complainant.
When making a cash settlement offer, the insurer must account for these factors.
Determination | Case number: 915520 Page 4 of 9
The insurer says that within the cash settlement offers it has made to the complainant, it has
included a contingency uplift of 10%, to account for these factors.
I’m not convinced that this is the case.
The insurer also says (in its email of 16 January 2023, to the complainant) that:
The settlement offer that has been provided to you includes a 10% contingency
payment due to the delay and ongoing issues on your claim.
As stated above, the contingency uplift is not related to delay and ongoing issues regarding
the claim. The contingency uplift is to account for the transfer of risk when a cash settlement
is made rather than the insurer completing repairs.
Questions of delay and ongoing issues with the claim are more appropriately dealt with by
non-financial loss compensation.
As raised by the complainant, there is a concern that this error may be impacting other
customers of the insurer.
Settlement of the building repairs claim
During the claim and complaint, several issues that were in dispute have been resolved and I
do not propose to deal with those issues in this determination.
The insurer has offered, and the complainant has accepted the amount of $176,370.94, in
settlement of the building repairs’ claim.
The exchanged material confirms that the settlement is based upon the quotation from the
complainant’s builder (EB) in the amount of $160,337.22, with a 10% contingency payment of
$16,033.72.
Based upon the exchanged material, I am satisfied that the quotation from EB is a fair and
reasonable starting point for the cash settlement.
However, a 10% contingency uplift is not consistent with the AFCA approach of 15 to 20%,
which I am confident the insurer is aware of.
Given the amount of damage and the extent of repairs required, in my view, it is fair that the
insurer includes an additional 10% contingency uplift of $16,033.72, to the settlement amount
for building repairs.
Further, EB’s quotation is dated 15 November 2022, and clearly says that it is valid for (only)
30 days, (my addition).
In my view, it is fair that the insurer pay interest, in accordance with the Insurance Contracts
Act , 1984, on the amount of $194,008.03, from 15 December 2022, until the amount is paid.
Claim for loss of rent
The insurer says that it has paid the complainant the policy limit for loss of rent, being 52
weeks (or 10% of the sum insured) and totalling $19,775.31. However, in consideration of
claim delays, the insurer has offered to extend the payment for loss of rent by a further 20
weeks up until 22 July 2023. This results in an additional payment for loss of rent of
$7,660.80.
The insurer says that its additional payment for loss of rent is based upon the builder’s
estimation of the time for claim related repairs to be 20 weeks.
Determination | Case number: 915520 Page 5 of 9
The exchanged material indicates that repairs have not commenced.
In my view, it would fair that the insurer pays the complainant loss of rent to the date 30 days
after the date of this determination and then to pay loss of rent for 20 weeks after the date of
the complainant’s acceptance of this determination, if the complainant chooses to do so.
The insurer is to cash settle this aspect of the complaint.
Additional matters
The complainant has raised several additional matters.
Insurance renewal
The insurer says that it has offered, and the complainant has accepted renewal of the policy
for a 12-month period, until 17 February 2024.
The insurer also says it has advised the complainant that if all repairs are completed as per
the relevant Standards and all maintenance issues, building defects and compliance issues
are addressed, insurance renewal will not be a problem.
I am satisfied that this general approach is consistent with the complainant’s policy obligation
to ensure that the property is kept in good condition. This does not necessarily mean that all
of the maintenance repair items are reasonable and/or consistent with the complainant’s
policy obligations.
The insurer says that the following maintenance issues will need to be addressed prior to the
next policy renewal:
Replace rotten bottom plate
Roof pointing touch ups
Replace 2 rusted bolts
Clean gutters
No weep holes installed in ridge capping.
Non - compliance to AS4773 - Damp proof course deficient, weep holes & c avity
flashings.
Pre - existing movement cracking to ceilings in the living room and hallway.
While the complainant accepts that some maintenance issues require completion, he is
concerned that the insurer has and will seek to rely upon building Standards that are not
applicable to his property. This is, in part, based upon the construction date of the property
(1994).
T he complainant is concerned regarding the insurer’s approach to issues with repairing the
mortar and the insurer’s expectations regarding what the insurer say s are the required
building Standards.
The complainant says that the insurer is demanding the damp proof course, flashings and
weep holes be repaired as part of their recurring misinterpretation or misrepresentation that
the building Standard the insurer referred to was applicable to the property at the time of
construction and further says that property was built to the appropriate Standard at that time.
I understand that the maintenance repairs have not been completed.
In the circumstances of this complaint, it is not appropriate or possible for me to deal with the
insurance renewal issue given the information currently available.
Determination | Case number: 915520 Page 6 of 9
AFCA cannot and will not interfere in an insurer’s decision to insure a person , unless the
insurer’s decision was made indiscriminately, maliciously or on the basis of incorrect
information.
The complainant argues that the proximate cause of the damage to the mortar was the
a ctions of the insurer’s representative AM.
The question of whether the insurer will offer insurance renewal to the complainant, will not
be answered until the maintenance repairs are completed.
Given the maintenance repairs have not been completed and a decision regarding insurance
renewal has not yet been made, it would not be appropriate for me to decide, at this time,
regarding this matter.
When a decision is made by the insurer, depending upon the reason for the decision, AFCA
may or may not be able to review the decision.
If the parties disagree after the maintenance repairs are completed, or if they are unable to
resolve the dispute, they may bring the matter back to AFCA, for additional review, subject to
AFCA’s rules.
Up grades
The complainant says that the insurer should pay for the additional work that AM and the
insurer have requested, including:
Upgrades of the brickwork and mortar to current Standards that would satisfy the
insurer’s builder’s warranty,
Weep holes in ridge capping to current Standards,
Cavity flashings to current Standards, and
The inclusion of a damp proof course to current Standards.
The quotation from EB, upon which the insurer’s settlement offer was made, includes an
allowance for external brickwork repairs.
The insurer has agreed to pay for the mortar that was damaged during pressure cleaning,
however, it will not cover the cost of repair of all other defects, but only the repairs to sections
of the mortar removed in the make safe.
The insurer says:
Given the age of the dwelling, construction has been identified as 1994, it is likely that
requirements set out in AS 4773 were not applicable at the time of construction, it is
also noted there is no external "sarking " between and the brickwork and internal
framing, this was not a requirement at the time of construction and is standard
practise now, the issues identified in the JHA report would be non-compliant works as
per AS 4773 , what remediation the customer chooses to complete is his
responsibility, these non-complaint issues are not related to the claimed event and
should not be a factor in undertaking the event related flood repairs.
The complainant says that on balance the house was built to standard at the time of
construction and it is not a defect if the build would not meet current Standards.
However, the insurer seeks to rely upon the policy provision within the PDS, that says:
Determination | Case number: 915520 Page 7 of 9
We cover When you are covered for the costs of rebuilding or repairing damaged
parts of the property, we will pay the reasonable and necessary costs:
….
— to make the damaged property components comply with current
home building regulations and laws. We only pay these costs if the
property components complied with building laws or regulations when
they were originally built or when construction, repairs, renovations or
alterations were undertaken.
In my view this policy provision makes it clear that the insurer’s obl igation does not extend to
covering the cost to make the damaged property components comply with current Standards,
if they did not comply with the Standards at the time they were damaged or when
built/repaired.
Confidentiality
The exchanged material does not include a specific complaint by the complainant regarding a
breach of confidentially by either the insurer or its representatives.
AFCA expects the insurer to employ its usual approach to confidentiality and privacy,
consistent with the Insurance Code, its policy commitments and accepted insurance law.
The insurer has confirmed that it does not discuss any details relating to the complaint with
any third party. Reports obtained are relevant to the complaint.
As there is no specific allegation of breach, I do not propose to deal with this matter further.
Bank letter
The insurer says that prior to the payment of the settlement amount, it requires a letter from
the bank to determine who has a financial interest in the property.
The complainant agrees with this process and has requested a letter, but asks why it was not
requested earlier and why the requirement is not included in the PDS?
The complainant says that the bank has requested, amongst other things, further valuations,
which has resulted in delay and further work on his part.
While I agree that the insurer’s request is prudent, and I note that the insurer has offered to
assist the complainant with the bank, the insurer should consider altering its processes to
advise the complainant earlier and to include the requirement in the PDS, to clarify the
necessary steps involved with a cash settlement, to hopefully limit delays.
Rights to further remedy
It is not appropriate for AFCA to decide about or give advice regarding what rights to further
remedy, if any, the complainant may have if he accepts this determination.
The complainant should seek his own advice on this question.
If the complainant chooses not to accept this determination, then his right to seek remedy in
an alternate forum, remains open.
Determination | Case number: 915520 Page 8 of 9
2.2 Has the insurer’s handling of the claim been satisfactory ?
Under AFCA’s Rules, we may award compensation (capped at $5,400) for non -financial loss
where a complainant has suffered an unusual degree or extent of physical inconvenience,
time taken to resolve the situation or interference with their expectation of enjoyment or peace
of mind.
However, we adopt a conservative approach to the award of compensation for non-financial
loss. We expect complainants to be moderately robust and bear the usual stress and
inconvenience associated with an insurance claim.
Moreover, non-financial loss is not intended to be a punishment for any wrongdoing on the
part of the insurer.
The complainant says that the insurer has not acted reasonably and there is ongoing
evidence of bad faith, “ gaslighting ” and undue delays resulting in unnecessary psychological
distress. Further, there has been ongoing misrepresentation and incorrect provision of
information in a manner that is at best reckless and potentially malicious. These details are
not exhaustive of the complainant’s list of concerns with the insurer.
The complainant has provided an extensive chronology of events and interactions between
the parties. The complainant has also provided details of the impact the insurer’s failings have
had upon himself and his family.
The insurer agrees that the service provided to the complainant has fallen short of the
complainant’s expectations.
The insurer says it accepts that there have been delays and service issues causing undue
frustration and inconvenience to the complainant because of the ongoing claims process.
In recognition, the insurer offered $1,000 non-financial loss compensation for the
complain ant’s claim experience.
The complainant has raised multiple issues with the approach taken by the insurer, issues
which the insurer appears to no longer rely upon. The issues include, but are not limited to;
inappropriate reliance upon Standards that do not have application to the property,
multiple assessments at the property,
multiple desk top reviews, relying on limited photographs rather than attendances at
the property,
damage caused by the actions of the insurer ’s representatives , and refusal to warrant
repairs and denial based upon maintenance allegations, and
reliance upon policy exclusions that do not appear to be applicable.
Further the insurer made several offers, increasing as the complainant provided further
information or the insurer obtain additional reports.
Given the exchanged material I am satisfied that the effect on the complainant from the
conduct of the insurer is at the more serious end of the spectrum.
Upon acceptance of this determination by the complainant, the insurer is to pay the
complainant $5,400 non-financial loss compensation.
If it has already paid the amount previously offered, the insurer is only required to pay a
further $4,400.
Determination | Case number: 915520 Page 9 of 9
2.3 Why is the outcome fair?
The outcome is fair as the insurer has not met its obligations to the complainant and its
actions have left much to be desired.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.