Garden retaining wall storm damage claim declined under exclusion for walls not built to engineering criteria

FirmYoui
Decided2023-05-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed under a home policy for storm damage to a garden retaining wall, which the insurer declined under an exclusion for walls not built to engineering criteria. AFCA found the insurer had not established the exclusion applied and directed the claim be cash settled after a scope of works and quote, plus a 15% contingency allowance.

The insurer bears the onus of proving an exclusion applies, and it failed to show that the data sheet or standard set out the mandatory engineering criteria applying at the time of construction.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Youi determinations · Find similar determinations

Text of the determination

Determination Case number 915271 Financial firm Youi Pty Ltd Determination | Case number: 915271 Page 1 of 5 Case number: 915271 18 May 2023 1 Determination overview 1.1 Complaint The complainant holds a home insurance policy with the financial firm (insurer). He lodged a claim on 9 March 2022 for damage to two retaining walls at his property which he says was due to a storm. The complainant subsequently withdrew the claim in respect of the house retaining wall which the insurer says had termite damage. The insurer has also declined the claim for the garden retaining wall. It says the damage to the retaining wall is as a result of the wall not complying with the relevant standards applicable at the time of construction. It says the policy excludes cover for loss or damage arising from retaining walls not being built in accordance with the engineering criteria that applied at the time of construction. The complainant disagrees with the insurer‟s decision and seeks that the garden retaining wall is covered. 1.2 Issues and key findings Is the insurer entitled to decline the garden wall claim? No. On balance, I am not satisfied that the insurer has established that the relevant exclusion applies. Accordingly, the insurer is not entitled to decline the claim. Why is the outcome fair? I am not satisfied the insurer is entitled to decline the claim because it has not established, on balance, that the exclusion applies. It is fair therefore that the insurer cover the claim for the garden retaining wall. 1.3 Determination This determination is in favour of the complainant. If the complainant accepts the determination, the insurer must obtain a scope of works and quote for the repair of the garden retaining wall as soon as possible. Within 14 days of receiving the scope of works and quotation, the insurer must cash settle the complainant for that sum plus a 15% allowance for contingencies and loss of the lifetime guarantee on repairs. Determination | Case number: 915271 Page 2 of 5 2 Reasons for determination 2.1 Is the insurer entitled to decline the garden wall claim? No. On balance, I am not satisfied that the insurer has established that the relevant exclusion applies. Accordingly, the insurer is not entitled to decline the claim. Policy covers insured events subject to exclusions The insurer‟s policy consists of the policy schedule and product disclosure statement (PDS). It is not in dispute the insurer provided the policy documents to the complainant. The policy is an „insured events‟ policy. This means not all loss and damage is automatically covered. Rather, only loss or damage caused by one or more of the insured events, and not subject to exclusions, is covered. The insured events are set out in the PDS and include storm. However, the policy excludes cover for loss or damage: 20. to retaining walls where the design and construction of the wall was not according to engineering criteria that applied at the time of construction; Complainant has established a claimable loss The complainant is required to show, on the balance of probabilities (that it is more likely than not), that there is a claimable loss under the policy. This means the complainant must prove the loss or damage was caused by a risk that is covered under the policy. Once the complainant proves there is a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving, on the balance of probabilities, that the exclusion or condition applies. The insurer accepts that the retaining wall has been damaged and that the storm event has occurred. The insurer has also sought to decline cover on the basis of an exclusion in the policy. Given this, I am satisfied the insurer has accepted a claimable loss exists to which it says an exclusion applies. The onus is therefore on the insurer to show, on balance, that it is entitled to decline the claim. Insurer provided reports commenting on the cause of damage The insurer appointed a builder, AB, and engineer, CE, to attend the property. AB ‟s report relevantly states :  the damage to the retaining walls is consistent with the insured event; and  the right hand side and split-level retaining walls have slumped as a result of intense rain and flooding. CE ‟s report and subsequent correspondence with the insurer says:  Timber Queensland Technical Data Sheet 9 published in 2014 (data sheet) provides recommended practice for the construction of timber sleeper and post retaining walls;  the existing posts to the garden wall are under sized in comparison to the data sheet and have rotated under load from the backfill;  drainage has not been adequately addressed resulting in excessive soil moisture; Determination | Case number: 915271 Page 3 of 5  due to the natural fall of the land leading to the garden, regular inundations of surface water have ponded and infiltrated the soil behind the retaining walls, rather than being diverted away. This has resulted in excess hydrostatic pressure in addition to earth pressure acting on the rear of the wall and exceeded the design resistance of the already undersized wall posts, causing it to rotate;  it estimates the wall was constructed in 2017 although the complainant says the retaining wall was constructed by the previous owners (who purchased the property in 2015); and  had the retaining wall been built in accordance with the data sheet and AS4678 (standard) the storm event is unlikely to have caused the rotation of the wall which has now occurred. Complainant says damage caused by storm The complainant says:  whilst the data sheet is provided by Timber Queensland, there is no specific code in which retaining walls are required to be built within the building codes managed by QBCC. Further, the heading within the Data Sheet states it is “recommended practice” and not stated as the only way in which such walls can be constructed;  the local council has confirmed that certification for the retaining wall in question is not required;  the Queensland Development Code Building Regulation 2006 NMP Retaining Walls and Excavation and Filling, says approval is not required under the Building Regulation 2006 for retaining walls that are not more than 1m in height, closer than 1.5m to any other structure or have a surcharge loading;  CE‟s report shows a wall height of 1.1m at its highest point, however the height should be calculated on an average where the retaining wall does not have a constant height or is on a sloping ground (as is the case here). Based on this, the wall‟s average height is under 1m and, therefore, building certification and council approval is not required;  in any event, he has spoken with the original builder who claims the wall was built in accordance with all relevant codes. A statement has been requested from the builder but is yet to be provided as he is not in good health;  AB‟s report states the „Bureau of Meteorology advised SEQ is in the midst of the worst flooding for 30 years and parts of Brisbane have had more than one month‟s worth of rain in one day. The Brisbane River (and associated river systems) are experiencing some of the worst flooding since 2011 with inundation caused to thousands of prope rties‟;  when asked if the wall would have failed from the rain event in February 2022 had it been constructed correctly, CE says: the rotation of the retaining wall in the February rains would have been unlikely to have occurred  the fact that insurer does not have a definitive answer from CE to the above indicates that even if the wall was built to code there is still no guarantee that the damage would not have occurred; and  in his opinion, the damage to the retaining wall would have occurred regardless of the construction. Proximate cause of the damage must be established The insurer needs to show the proximate cause of the damage being claimed is, on balance, excluded under the policy. Determination | Case number: 915271 Page 4 of 5 The proximate cause of a loss is the dominant, effective or operative cause. It does not have to be the first, the last or the sole cause. This is a question of fact depending on the circumstances. If there are several causes, each needs to be examined for qualities of reality, predominance and efficiency to identify the proximate cause. For example, if one cause would have caused the loss in any case, and the other one would not have done so without the first, then the first is the proximate cause. Insufficient evidence to establish that exclusion applies Having reviewed all of the available information, I am not satisfied that the insurer has established that the policy exclusion applies. There is a question about whether „engineering criteria‟ means mand atory requirements only or whether it includes any recommendations or guidance notes as well. I consider the more suitable interpretation is that it covers mandatory requirements only. The insurer relies on the data sheet and the standard in order to establish the non- compliance with the engineering criteria referred to in the exclusion. I note the data sheet is a recommendation only. I also accept that, based on the height of the retaining wall, it did not require building approval from a private building certifier since the overall height was not more than 1m. Further, the standard relates to design criteria and guidance for the use in the design of earth retaining structures. It is intended to be consistent with the loading code for structures and to be used in combination with structure design standards. However, the insurer has not referred to any of these other standards which more specifically address engineering criteria for retaining walls. Therefore, I am not satisfied that either the data sheet or the standard set out the relevant engineering criteria to be applied at the time of construction. I also note for completeness that the complainant‟s most recent submission dated 4 May 2023, which referred to the Building Regulations, was provided to the insurer and it has not made any submissions in reply. Given these circumstances, I am not satisfied that the insurer has established the relevant engineering criteria that applied at the time of construction. Therefore, it is not possible to consider whether or not the retaining wall was property constructed. Accordingly, the insured must accept cover for the garden retaining wall. The insurer should obtain a scope of works and quote for the repair of the garden retaining wall. The claim should then be cash settled with a 15% allowance for contingencies and loss of the lifetime guarantee on repairs. 2.2 Why is the outcome fair? I am not satisfied the insurer is entitled to decline the claim because it has not established, on balance, that the exclusion applies. It is fair therefore that the insurer cover the claim for the garden retaining wall. Determination | Case number: 915271 Page 5 of 5 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.