Home / IAG / Determination 915225
Determination 915225
Insurer cash settled a fire claim and its make-safe failed, causing further water damage; complainant wanted repairs and compensation
Summary
After a fire, the insurer cash settled the home claim at the sum insured, but its make-safe failed and caused more water damage. AFCA ordered the insurer to obtain a new scope of works, have its builder complete repairs, pay temporary accommodation, contribute $5,000 to professional costs and pay $2,500 non-financial loss.
The insurer is liable for damage from its failed make-safe outside the sum insured, and since that damage cannot be quantified it is fair for the insurer to complete the repairs.
Issues
- Claim amount dispute primary · upheld
“Insurer's cash settlement as total loss not fair; insurer should appoint a builder to reinstate the property.”
- Poor claim handling secondary · upheld
“Insurer consistently sought to avoid liability for the make safe issues and ignored its own assessor's recommendations.”
- Delay secondary · upheld
“Insurer's claim handling has caused the delays in settlement of the claim.”
- Poor communication secondary · upheld
“The insurer neglected to provide a copy of GM's report despite the complainant consistently raising this issue.”
- Repairs or contractors secondary · upheld
“The insurer's make safe failed and further damage has continued to occur.”
Subjects and remedies
home or building damagepay compensationpay non financial lossrepair or rectify
Text of the determination
Determination
Case number 915225
Financial firm Insurance Australia Limited
Determination | Case number: 915225 Page 2 of 10
Case number: 915225 27 April 2023
1 Determination overview
1.1 Complaint
On 28 June 2022 the complainant lodged a claim under her home and contents insurance
policy held with the financial firm (insurer) after a fire damaged t he complainant’s home .
The insurer accepted the claim and decided to cash settle for the sum insured and additional
benefits under the policy.
The complainant says the insurer ’ s initial scope of works were inaccurate and the property
could have been repaired. Further the insurer ’s make-safe failed and resulted in further
damage which the insurer should be liable for as the property was repairable. The
complainant also seeks compensation for non-financial loss and professional costs incurred.
1.2 Issues and key findings
Is the insurer’s assessment of its liability reasonable?
No. The insurer ’s make safe failed and further damage has continued to occur. The insurer is
liable to arrange a builder to repair the complainant’s property including all new resulting
water damage and fire damage over and above the sum insured if required.
Is the complainant entitled to compensation?
Yes . The insurer should contribute $5,000 to the complainant’s professional costs under
AFCA rule D5.1 and pay $2,500 compensation for non-financial loss under AFCA rule D3.3.
Why is the outcome fair?
The available evidence confirms the make safe failed and the insurer failed to properly
remedy the situation. This resulted in additional damage for which the insurer is responsible
outside the sum insured. In the absence of being able to quantify the damage attrib utable to
the fire as against the failed make safe it is fair for the insurer to attend to the repairs after
obtaining a further scope of works.
1.3 Determination
This determination is in favour of the complainant. Within 14 days of the complainant’s
acceptance of this determination the insurer is to:
appoint PB to prepare a further SOW to allow the property to be restored to its pre-fire
condition covering all fire and subsequent water related damages
appoint its preferred builder to complete the repairs in accordance with the SOW and
terms of the policy.
pay or temporary accommodation for the duration of the repair period
contribute $5,000 to the complainant’s professional costs and pay the complainant $2,500
compensation for non-financial loss.
Determination | Case number: 915225 Page 3 of 10
2 Reasons for determination
2.1 Is the insurers assessment of its liability reasonable?
No. The insurer’s make safe failed and further damage has continued to occur. The insurer is
liable to arrange a builder to repair the complainant’s property including all new resulting
water damage and fire damage over and above the sum insured if required.
Complainant has the onus to establish a valid claim
When making a claim, the complainant has the onus of establishing, on the balance of
probabilities (i.e. that it is more likely than not), that they suffered a loss which is covered by
her insurance policy.
If a claimable loss is established, the onus shifts to the insurer to establish, on the balance of
probabilities, the application of any condition or exclusion it relies on to reduce its liability.
The cover provided by the policy is set out in the product disclosure statement (PDS) and the
certificate of insurance. There is no dispute the complainant received these documents.
Details of the policy are set out in section 3.2 of this determination.
The policy coverage details that the building is covered for accidental damage up to a sum
insured of $750,000, which includes a replacement benefit option.
The complainant’s policy is an Accidental Home damage policy that covers the complainant ’s
home for a sum insured of $750,000 and contents for $120,000. The policy provides
additional benefits in addition to the sum insured including:
Reasonable costs of demolition, removal and disposal of debris
Increase in sum insured based on increases in consumer price index since policy
inception.
Circumstances of claim
There is no dispute that the complainant’s home was severely damaged by a fire on or about
28 June 2022.
The insurers builder PB attended the property on 7 July 2022 and provided his SOW. Three
quotes based on the PB’s SOW were obtained as per the following:
PB: $870,921.83
(RI): $823,654.64
(JL): $942,398.07
The quotes include items covered under ‘ Additional things we will pay for when you have
insured your buildings ’ that are in addition to the sum insured ($750,000).
RI’s quotation includes the following which need to be subtracted
Consultants: $9,650
Demolition: $79,230.
This reduced the quotation from RI to $734,774.64 which is less than the sum insured. The
insurer decided to cash settle the claim for the sum insured ($750,000) plus the additional
Determination | Case number: 915225 Page 4 of 10
benefits. The complainant disputes the settlement and says that the insurer should complete
the repairs.
The complainant says the insurer failed to complete the make safe and the property suffered
additional damage for which the insurer should be liable. The complainant says that as the
cost to complete the fire damage repairs is less than the sum insured the insurer should
rebuild the property as the policy cover includes the optional ‘replacement benefit’. The
insurer should separately meet its liability for the additional damage caused by the failed
make safe.
Make safe failure has caused additional water damage.
On 29 June 2022, a make safe was performed by (IP) whom the insurer contracted. It is well
documented this make-safe failed and water entered the property prior to the scope of works
(SOW) being completed by 7 July 2022.
While the insurer has suggested there was zero rainfall prior to the SOW being completed the
panel is satisfied the complainant has shown through nearby stations rainfalls between 50-
100mm for this period.
The panel notes from the claim notes that the insurers internal assessors (GM) acknowledged
rain fell at the property during this time. The claim notes from 9 September 2022 reflect the
contemporaneous view of its internal assessor (GM), which says:
The fire occurred on the 28/06/2022 The property consist of a large rendered
home with concrete tiled roof located on the canals which can be exposed to high
winds. I attended site the next day on 29/06/2022 at which stage part of the tiled
roof had collapsed due to burnt out timber trusses. The fire originated in right
hand side of roof cavity with wind direction indicated by travel of fire and soot to
opposite side. The fire fighters used fire hoses resulting in extensive amount of
water at a high volume blasted into the home resulting in water travelling from top
level through ceilings and light fittings to ground level. On day after fire the tiled
floors to ground level were wet with water covering floor in office. At this stage it
was expected the top level could be demolished and keep ground level with
relatively minor works required such as tiled floors, some plasterboard ceilings,
electrical and cleaning Required. Whilst onsite a temporary make safe tarp was
being installed. Heavy rains were forecasted the next day and the following week.
On second visit on 7th July we found more water throughout lower level as tarps
had failed due to strong winds with water logged upstairs. At this stage I had
discussions with RI Builders and PB group in regards to possible make safe
options.
GM says immediately after the event there was minimal damage to the ground floor and it
was expected the top floor could be demolished and only minor works were required to the
ground floor. However, due to the failed make safe more water was found through the lower
level of the property.
IP reported on 23 July 2022 that the failed make safe was allowing water to penetrate to
internal of the property. All make safe works completed had been undertaken at the outer
areas of the roof as IP could not proceed further due to the severe damage and unknown
structural integrity . Despite further make safe works performed the issue will continue to
occur due to lack of structure at the top of the roof point. The tarps continue to pool with water
Determination | Case number: 915225 Page 5 of 10
as there is no run off point in the middle of the roof area that has been burnt out. IP
recommended the appointment of an engineer to assess the structure ’ s integrity and that a
temporary roof structure be fixed to the remaining, structurally sound items identified by the
engineer, to allow the necessary run off to prevent pooling.
The Panel notes the demolition of the roof structure to allow for the make safe was not
approved until 21 December 2022. The complainant’s builder DP provided a report 2 Marc h
2023, indicating over 600mm of rain has been allowed to enter the property from the date of
loss until recently due to the insurer ’ s failure to make safe the property despite multiple
attempts. DP confirmed the demolition of the top portion of the property has now taken place
and it would now be suitable to complete a make safe for the fire damage and water damage.
The panel is satisfied the failed make safe has allowed additional water to enter the property
and most likely result in additional damage not caused by the fire.
Insurer liable for damage caused by failed make safe
The panel accepts the failed make safe would have resulted in significant water pooling in the
lower level of the home.
The insurer says no additional damage was caused by the failed make safe. It says that the
assessment reports from PB and UBS show that the fixtures and fittings within the home are
non-repairable due to the fire damage, water damage, soot damage, smoke damage or
mould from water and moisture left by the fire extinguishing process.
The complainant appointed her own building consultant (DP) who provided several responses
and raised questions directly to the insurer ’ s contractors querying the SOW and quotes. DP
made several recommendations in his report dated 10 September 2022 relating to the repair
process and the failed make safe.
PB provided a report on 5 December 2022, which says the main extent of damage was
caused by the fire and the fire extinguishing efforts. PB also explained the extent of soot and
fire damage and the relevant inclusions in its SOW, which the panel accepts is reasonable.
PB considered the floor boards need to be replace due to water damages sustained through
both the extinguishing of the fire and water entry through the torn tarp rendering it non-
restorable . PB considered it not possible to assess and quantify the costs of rain water
ingress versus the fire suppression activities based on the damages observed on 7 July 2022,
as PB was unsure when the torn tarp had occurred allowing rain water ingress.
Water has continued to enter the property due to the failed make safe until recently. The
report from PB does not address this additional damage. The panel is satisfied the insurer is
liable for the additional damage caused by the failed make safe. As it is difficult to quantify the
additional damage it is a question of whether the insurer ’ s offer to settle the claim as a total
loss is fair in the circumstances.
It is fair the insurer appoints a builder to reinstate the property
The complain ant’s policy includes the replacement benefit. Under the replacement benefit the
insurer agrees to pay the cost of rebuilding your buildings or repairing the damaged portions
to the same condition as when they were new. The benefit includes payment of any additional
costs required for your buildings to comply with government or local authority bylaws.
The benefit provides that, if rebuilding or repairing has not commenced within 6 months of the
date of damage, the insurer may determine to either:
Determination | Case number: 915225 Page 6 of 10
reinstate or repair your buildings to the condition they were in just before the loss or
damage occurred
pay you the cost of reinstating or repairing your buildings to the condition they were in just
before the loss or damage occurred or
pay you the value of the land and your buildings just before the loss or damage occurred.
Reduced by the value of your land and your buildings after the loss or damage occurred.
RI’s reduced quotation of $734,774.64 is under the sum insured. The insurer acknowledges
this. At the time of RI’s quote there was no talk of demolition of the property, it appeared the
property was a repairable prospect.
The complainant wanted the insurer to complete the works at the property and was forced to
consistently raise the failure of the make-safes and concern as to the additional damage
being sustained. PB acknowledges that the extent of damage caused by the failed make safe
cannot be quantified. It is fair in the circumstances to accept some of the damage quoted by
RI would be attributable to the failed make safe. The insurer ’ s internal assessor GM clearly
documented this in his file note where he says the ground floor initially experienced minimal
damage.
The panel not es the insurer neglected to provide a copy of GM’s report despite the
complainant consistently raising this issue.
PB’s SOW provided substantial repairs to the lower floor . Extinguishing the fire would have
caused significant water damage however a portion of this damage which cannot be
quantified was in the panel ’ s view caused by the failed make safe. Given RI’s quotation was
already under the sum insured, the panel considers had a further portion of make safe related
damaged been considered it again would have been reduced.
The insurer is liable for the damage caused by its failed make-safes. The panel accepts the
failed make safes allowed 600mm of rain to enter the property and may have made the
property an unrepairable prospect.
When exercising its discretion under the replacement benefits cover under the policy, the
insurer must act fairly, reasonably and consistent with utmost good faith. The insurer is liable
for the full extent of the damage caused by the fire under the terms of the policy. It is also
liable for the subsequent damage caused by the failed make safe. This is in addition to the
sum insured. In the absence of being able to quantify the damage attributable to the fire and
that attributed to the insurers claims handling and failed make safe, in the panels view it is fair
that the insurer to complete the repairs.
Wit hin 14 days of the complainant’s acceptance of this determination the insurer is to appoint
PB to prepare a further SOW to allow the property to be restored to its pre-fire condition. The
SOW will need to cover all fire and subsequent water related damages which have occurred.
The insurer should then appoint its preferred builder to complete the repairs in accordance
with the SOW and terms of the policy.
The policy also provides for temporary accommodation of 12 months or 20% of the sum
insured. Given the panel ’ s view that the insurers claim handling has caused the delays in
settlement of the claim the panel determines it fair the insurer should pay the complainant ’ s
reasonable temporary accommodation for the duration of the repairs.
Determination | Case number: 915225 Page 7 of 10
2.2 Is the complainant entitled to compensation?
AFCA can determine insurer contributes to professional costs incurred
Under AFCA rule D5.1 AFCA, the panel can determine an insurer contributes up to $5,0 to
legal or professional costs incurred by a complainant during a complaint.
When considering whether to require an insurer to contribute to professional costs, it is
necessary to consider the complexity of the complaint and whether the cost was necessarily
incurred to assist a complainant establish the claim.
The complainant has incurred over $18,000 in professional costs in engaging DP to provide
his professional opinion as to the cause of the damage. The panel has found DP’s review of
the damage and expert building analysis of causation of damage (fire/fire extinguishment
versus water ingress on tarp failure), including his provision of photographs and explanations
to support same, useful in establishing the complainant’s claim. The costs were reasonably
incurred in responding to the insurer’s expert opinions.
In the circumstances it is fair the insurer contributes $5,000 to the complainant’s professional
costs incurred.
AFCA can award compensation for poor claim handling
Under the AFCA Rule D3.3, AFCA can award up to $5,400 compensation for non-financial
loss if a complainant suffered an unusual degree of stress, inconvenience, or delay because
an insurer mishandled a claim caused by an insurer mishandling a claim.
Complainant entitled to compensation for non-financial loss
The available information shows the complainant was generally dissatisfied with the insurers
decision not to repair the property and its failure to acknowledge the ongoing damage to the
property caused by the failed make safes. This resulted in ongoing stress and inconvenience
for the complainant.
The insurer does not appear to have considered the complainant in its initial decision to try to
cash settle the claim and has consistently sought to avoid liability for the ongoing issues
associated with the make safe. In doing so it appears to have ignored recommendations from
its own internal assessor GM and the make safe company IP.
The panel considers the insurer in failing to address these issues in a timely manner has
caused the complainant an unusual degree of inconvenience and time taken to resolve the
situation. The panel considers it is fair the insurer pays compensation of $2,500 for non-
financial loss.
2.3 Why is the outcome fair?
The outcome is fair as there is no dispute the complainants home sustained significant
damage during the fire. The available evidence confirms the make safe failed and the insurer
failed to properly remedy the situation. This has resulted in additional damage for which the
insurer is responsible outside the sum insured.
In the absence of being able to quantify the damage attributable to the fire as against the
failed make safe it is fair for the insurer to attend to the repairs after obtaining a further scope
of works.
Determination | Case number: 915225 Page 8 of 10
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive industry experience.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant policy coverage
The cover provided by the policy is set out in the product disclosure statement (PDS) and the
certificate of insurance. There is no dispute the complainant received these documents.
The policy coverage details that the building is covered for accidental damage up to a sum
insured of $750,000, which includes a replacement benefit option. Page 30 of the PDS
outlines the following relevant policy conditions:
Determination | Case number: 915225 Page 9 of 10
The most we will pay for your buildings or your contents
The most we will pay for any claim for your buildings or your contents is the sum
insured shown on your schedule.
This does not apply to amounts payable under ‘Additional things we will pay for
when you have insured your buildings’, or ‘Additional thing s we will pay for when
you have insured your contents’, or ‘Additional things we will pay for when you
have insured your buildings and/or contents'.
How we pay a claim for your buildings
When your schedule shows 'including replacement benefit'
When loss or damage occurs to your buildings, we will pay the cost of rebuilding
your buildings or repairing the damaged portions to the same condition as when
they were new. We will only do this when your schedule shows 'including
replacement benefit'.
We will also pay any additional costs required for your buildings to comply with
government or local authority bylaws. We will not pay these additional costs if you
were required to comply with these bylaws, and had not done so, before the loss
or damage occurred.
Rebuilding or repairing your buildings must commence within six months of the
loss or damage occurring. If it does not commence within six months, we will do
one of the following:
• reinstate or repair your buildings to the condition they were in just before t he loss
or damage occurred
• pay you the cost of reinstating or repairing your buildings to the condition they
were in just before the loss or damage occurred.
• pay you the value of the land and your buildings just before the loss or damage
occurred. We will reduce this payment by the value of your land and your
buildings after the loss or damage occurred.
We decide which one we will do.
On page 15-16 in the PDS it outlines the additional things the insurer will pay above and
beyond the sum insured, relevant to the claim are the following:
We will pay the reasonable costs of demolishing and removing and
disposing of any buildings debris when damage or loss occurs.
Determination | Case number: 915225 Page 10 of 10
We will pay the reasonable costs of architects, surveyors and engineers
and also pay any legal fees
If we agree to pay you for loss or damage to your buildings, we will
increase your sum insured for your buildings by the amount the Consumer
Price Index (all groups) has increased since you took out your policy or
last renewed it.