1 Determination overview
1.1 Complaint
The complainant holds home building and contents insurance issued by the financial firm
(insurer). On 29 March 2022, he lodged a claim for damage to his home, primarily affecting
the flooring. He attributed the damage to recent storm events and flooding.
The insurer has denied the claim. It says the damage was not a loss claimable under the
policy. Rather, the damage was due to construction defects, gradual deterioration, earth
movement and building movement. The policy does not cover damage from those causes.
The complainant maintains the damage was caused by water ingress following severe
weather events. He wants the insurer to cover the claim. He is also dissatisfied with the
insurer’s claim handling.
1.2 Issues and key findings
Is the insurer entitled to deny the claim?
Yes. On the available information, the insurer has shown it is more likely than not that the
damage was due to causes excluded from cover under the policy terms.
Is non-financial loss compensation payable?
Yes. The insurer should have communicated better with the complainant and at times
delayed progression of the claim. These matters caused the complainant stress and
inconvenience. The insurer is to pay him $1,000 in non-financial loss compensation.
Why is the outcome fair?
The insurer has on balance established that the damage claimed was due to excluded
causes. It would not be fair for the insurer to have to pay the claim when the policy does not
respond. However, it is fair that the insurer pays the complainant $1,000 in non-financial loss
compensation for the stress and inconvenience it unreasonably caused.
1.3 Determination
This determination is substantially in favour of the insurer.
Within 14 days of the complainant providing written notice he accepts this determination the
insurer is required to pay him $1,000 in non-financial loss compensation.
The insurer is not required to take any other steps.
Determination | Case number: 914587 Page 2 of 6
2 Reasons for determination
2.1 Is the insurer entitled to deny the claim?
Yes. On the available information, the insurer has shown it is more likely than not that the
damage was due to causes excluded from cover under the policy terms.
Complainant must show a claimable loss under policy terms
The complainant is required to show, on the balance of probabilities (that it is more likely than
not), that he suffered a claimable loss under the policy. This means he must show the loss
was caused by a risk for which he is insured.
The complainant holds home and contents insurance with the insurer. Subject to the terms
and conditions set out in the product disclosure statement (PDS), the policy covers damage
caused by a listed insured event. Those insured events include ‘Storm’ and ‘Flood and
Rainwater run- off’.
The policy also automatically included cover for accidental damage, defined in the PDS as
‘damage that is caused unintentionally to your home or contents’.
The complainant says that following the storms and floods that affected South East Australia
in February 2022, he noticed floor tile lifting in numerous rooms. The complainant says he
later observed cracking throughout the house. Mould growth subsequently occurred. He says
the issues experienced were the result of the severe weather events.
Once the complainant proves the existence of a claimable loss, the insurer is liable for the
loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of
proving on the balance of probabilities the application of the exclusion or condition.
Insurer says the claim is not covered
Upon being notified of the claim on 29 March 2022, the insurer appointed builder RB to assist
with its assessment. RB inspected the property on 5 May 2022 and reported that:
there were loose floor tiles in the bathroom, laundry, hall, family room, dining room, kitchen
and entry area
the tiles were coming loose due to incorrect installation (lack of expansion joints)
it was also possible the adhesion system used was incorrect for the tiles and their location
photos of the areas where tiles had lifted displayed almost no glue residue, indicating the
incorrect glue had been used
a different tile was use in the bathroom and laundry, but also had adhesion issues.
After the complainant reported the cracking damage and given he had expressed concerns
about RB, the insurer appointed IP, building consultant. IP inspected the property on 15 July
2022. According to IP:
the complainant confirmed that no storm or flood water entered the home. The surrounding
area was however covered by surface water run off and ground seepage
in relation to the tiled floor areas (kitchen, dining room, family room, hallway and entry):
> there was ‘firm evidence’ to suggest the bonding method had hidden defects
> recent storms with extreme wet conditions and elevated above normal relative humidity
also likely contributed to t he tiles’ failure, even though there had been no water ingress
> photos the complainant provided ‘ somewhat connect the damage with the high
atmospheric moisture levels ’
Determination | Case number: 914587 Page 3 of 6
in relation to tiled floor areas in the wet rooms (bathrooms and laundry):
> there were drummy spots. As the flooring is specifically designed to be saturated, to
suggest the drummy tiles are due to the storms is unreasonable
> gapping around tile perimeters was noted, unrelated to the storms
> general maintenance to the wet areas was required, particularly in the shower recesses
the general cracking to the internal ceilings and walls and external brickwork and
pavements was due to gradual deterioration, wear or tear and seasonal swelling of soils.
After IP inspected the property, the complainant sent it additional photos showing the
underside of the loose tiles. IP emailed the complainant stating:
…that is straight out poor glue placement/ techniques....
As I said yesterday, it's an underlying technical defect that no one could be
reasonably be aware of. And now that a succession of storm events has occurred
moisture (atmospheric) has lead [sic] to tile growth (ever so slight) which in turn
has faulted where tile bonding is less than satisfactory.
The insurer says that while storm events occurred, they were not the proximate (dominant,
efficient or operative) cause of the claimed damage. Rather, the proximate cause of the
damage was a combination of the following factors which are the subject of general
exclusions set out in the PDS:
gradual deterioration, wear or tear
earth movement
faulty design or workmanship
atmospheric conditions
the settling, shrinkage or expansion in buildings, foundations, walls or pavements, and
faulty design or workmanship.
Complainant disagrees
The complainant says due t o the insurer’s delays, he appointed a local builder, VH, to
prepare a scope of works for the repairs required. On 1 May 2022, VH estimated the cost of
repairs at $50,606. It noted that there were drummy and lifting floor tiles throughout the
house. VH said had been no water ingress and:
…the unprecedented storm/ rain event over the last 5 to 6 months has caused the
swelling of the surrounding ground around the entire house causing the slab to
rise on the outer perimeter’s causing deflection of the slab and subsequent failure
of the tile adhesive in multiple places.
According to the complainant, VH is clearly not a specialised assessor so its opinion on
causation is not persuasive.
The complainant prefers a report dated 1 December 2022 from JL, builders, which he
obtained as part of the NSW Flood Property Assessment Program. JL inspected the property
on 15 August 2022. By that stage, the complainant had removed the floor tiles. JL concluded:
‘Water has not risen up inside the house. However, as per the anecdo tal evidence, water
seepage has damaged floor tiles inside the house’
storm water had flowed around the house, leading to seepage of water through the floor
Determination | Case number: 914587 Page 4 of 6
areas of the property had become mould affected.
The complainant says that when attending to repairs he removed carpeting and discovered
the underlay had been badly deteriorated, which he says was due to water ingress. He also
notes that the mould issues ceased after the carpet and underlay was removed. He has
provided photos of deteriorated underlay and slab after it was removed.
He says JL’s report suggests that rainwater run off was the cause of damage and submits:
AFCA need to make a final decision on this claim based upon the report supplied
by the Australian governments independent assessment. It is the only
assessment that has the privilege of inspecting the property at a time when the
slab was exposed. The assessments supplied by a local builder is in no way an
experts opinion. The two [insurer] appointed assessors have obviously been paid
top dollar to find exclusions denying our right to claim and should be disregarded.
Insurer is entitled to deny the claim
Neither party has commented specifically on the accidental damage cover provided by the
policy. It is clear that the complainant’s home has b een damaged. There is no basis to
conclude the damage was intentionally caused. Accordingly, I am satisfied that there is a loss
claimable under the accidental damage coverage section.
However, the general exclusions the insurer relies on apply to all policy sections, including
the accidental damage cover. I am satisfied that the insurer has proven on the balance of
probabilities the claim is excluded. In making that finding I have noted:
RB, IP and VH all state that there had been no water ingress. While JL suggests water had
seeped through the floor, that was based on anecdotal evidence as the flooring had been
removed when it inspected the property
RB and IP both concluded that the floor tiles had been installed defectively
IP and VH both refer to earth movement
RB, VH and IP inspected the property well before JL did, and they had the advantage of
seeing the claimed damage before the flooring was removed
IP’s 49 page report is very thorough and contains extensive analysis. In co ntrast, JL’s
report is much less detailed and contains less analysis. Critically, JL does not explain how
water seepage through the floor (and slab) would have occurred
VP’s report is based on thorough investigations and I am not persuaded that its findin gs
should be discounted simply on the basis it is a ‘local builder’
experts are entitled to be paid for their work. The fact that the insurer has paid fees to RB
and IP does not mean their independence has been compromised.
On the available information, the insurer has shown it is more likely than not that the damage
was due to causes excluded from cover under the policy terms. It is entitled to deny the claim.
2.2 Is non-financial loss compensation payable?
Yes. The insurer should have communicated better with the complainant and at times
delayed progression of the claim. These matters caused the complainant stress and
inconvenience. The insurer is to pay him $1,000 in non-financial loss compensation.
Determination | Case number: 914587 Page 5 of 6
AFCA can award compensation for poor claim handling
Under paragraph D.3.3 of the AFCA Rules, we may award compensation for non-financial
loss (capped at $5,400) where the insurer’s actions have caused an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the com plainant’s expectation of enjoyment or peace of mind.
Insurer has unreasonably caused stress and inconvenience
The complainant says that the insurer failed to keep him adequately informed of
developments and took too long to reach a (wrong) decision about the claim. He says the
insurer acted unreasonably and that he experienced stress and inconvenience as a result.
The insurer acknowledges that there were issues with its claim handling. It says this should
be seen in the context of the volume of claims it was forced to deal with following the storm
and flood events that affected Eastern Australia. The insurer has apologised to the
complainant and offered to pay him $1,000 in compensation.
The insurer took five months to make a claim decision, which is a month more than the
standard timeframe referred to in the General Insurance Code of Practice. It is also apparent
that it should have communicated more effectively with the complainant. I therefore accept
that the insurer unreasonably caused stress and inconvenience.
However, t aking into account that I have agreed with the insurer’s decision and noting the
claim volumes it was dealing with at the time, I am satisfied its compensation offer is
reasonable.
The insurer must pay the complainant $1,000 in non-financial loss compensation.
2.3 Why is the outcome fair?
The insurer has on balance established that the damage claimed was due to excluded
causes. It would not be fair for the insurer to have to pay the claim when the policy does not
respond. However, it is fair that the insurer pays the complainant $1,000 in non-financial loss
compensation for the stress and inconvenience it unreasonably caused.
Determination | Case number: 914587 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. I have reviewed and considered
all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, I have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.