Home / Suncorp Group / Determination 913968

Determination 913968

Partial denial of storm and escape of liquid claims under wear and tear exclusions, and adequacy of cash settlement offer

FirmSuncorp Group
Decided2023-07-17
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$12,834
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Home insurers partially denied storm and escape of liquid claims citing wear and tear and poor condition exclusions, and offered a cash settlement. AFCA upheld the partial denial and rejected non-financial loss, but increased the contingencies uplift to 25%, requiring payment of $12,833.59.

The insurer proved on the balance of probabilities that the disputed damage was caused by excluded wear, tear and gradual deterioration, but the cash settlement needed a higher contingencies uplift given the age and non-inclusions of the scope of works.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 913968 Financial firm AAI Limited Determination | Case number: 913968 Page 2 of 8 Case number: 913968 31 May 2023 1 Determination overview 1.1 Complaint The complainants held home building and contents insurance issued by the financial firm (insurer). On 23 May 2022, they lodged a claim after a storm that day. A storm on 10 June 2022 led to a second claim. Claims were also lodged for leaks in the laundry and from a hot water system in 2019. The insurer accepted and has made payments towards the escape of liquid (EOL) claims and has offered a cash settlement for the storm claims. However, the insurer says some of the claimed damage was not due to one off EOL/storms but was caused by wear, tear and gradual deterioration. The policy excludes cover for damage from those causes. The complainants dispute that the exclusion clauses apply. They also say WB, the insurer’s builder, deliberately damaged a roof tile leading to further water ingress damage. They want the insurer to cover all the damage and are also dissatisfied with the insurer’s claim handling. 1.2 Issues and key findings Is the insurer entitled to partially deny the claims? Yes. The insurer has established the disputed damage was more likely than not due to excluded causes. Also, the complainants have not shown the roof tile was deliberately broken and, in an event, the insurer replaced the tile. Is the insurer required to increase its cash settlement offer? Yes. The scope of works (SOW) on which the offer is based was prepared eight months ago and does not allow for pre-painting wall preparation. An increased 25% contingencies uplift is to apply. It is also reasonable that the uplift be applied to the $600 cabinet doors component. Is non-financial loss compensation payable? No. While the complainants have found the claim process stressful, I am not satisfied that the insurer caused unreasonable delay or otherwise mishandled the claims. Why is the outcome fair? The disputed damage was more likely than not due to excluded causes. The alleged misconduct has not been proven and, regardless, the broken tile was replaced. It would therefore not be fair to require the insurer to cover more of the claim. It is fair that an increased contingencies uplift be applied given the age of WB’s SOW and its non-inclusions. 1.3 Determination This determination is substantially in favour of the insurer. Within 21 days of the complainants accepting this determination, the insurer is required to pay them $12,833.59 (the calculation of which is set out in section 2.2 of this determination). Determination | Case number: 913968 Page 3 of 8 2 Reasons for determination The parties provided numerous submissions to AFCA. While this determination does not refer to them all, I have taken each submission into account in reaching my decision. 2.1 Is the insurer entitled to partially deny the claims? Yes. The insurer has established the disputed damage was more likely than not due to excluded causes. Also, the complainants have not shown the roof tile was deliberately broken and, in an event, the insurer replaced the tile. Complainants have shown claimable losses under the policy The complainants are required to show, on the balance of probabilities (that it is more likely than not), that they suffered a claimable loss under the policy. This means they must show the loss was caused by a risk for which they are insured. Subject to the terms and conditions set out in the product disclosure statement (PDS), the complainants’ policy covers damage to the insured property caused by a listed insured event. Those events inc lude ‘Storm’ and ‘Escape of liquid’ . The PDS requires that when making a claim, an insured must be able to prove that an incident covered by the policy took place. ‘Incident’ is defin ed as ‘a single event, accident or occurrence which you did not intend or expect to happen. A series of incidents attributable to one source of originating cause is deemed to be the one incident’. The complainants lodged claims for damage said to have been caused by storm events on 23 May 2022 and 10 June 2022. They also claimed for damage due to EOL in the laundry and from the hot water system. There is no dispute that water ingress occurred during the storms or that the leaks occurred, causing damage inside the home and to contents. In the circumstances, I am satisfied that the complainants have established claimable losses under the policy. Once the complainants prove the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition. Insurer says the disputed damage is excluded Following lodgement of the first storm claim, the insurer appointed WB to assist with assessment. WB attended the property on 3 June 2022, and reported that:  the complainants advised that during weather events over the last few years, water had leaked from behind the kitchen cornice over the overhead cabinets and windows, onto the benchtops and into the low cabinetry and drawers  a few years ago, they had repainted the cabinetry and stripped back the vinyl in the kitchen due to water staining and swelling, but the damage had returned  the (lower) cabinetry had swollen, resulting in the benchtops lifting and separating at the joins, and some of the splashback tiles had cracked due to the pressure  some of the damage to the cabinetry doors and drawers appeared to be wear and tear  the cornice had water staining, but the cracking to the ceiling and cornice was not related to the storm as there was similar cracking elsewhere in the home Determination | Case number: 913968 Page 4 of 8  there appeared to be a roof tile slipped into the valley over the kitchen, and there was leaf litter blocking the valley. There was also a cracked tile that had been silicone sealed in the area. A roof report was therefore required  inspection of the laundry adjacent to the games room found water damage to the laundry cabinet and moisture in the carcass and up to the level of the taps. On 23 June 2022, WB’s roofing specialist inspected the roof and advised:  there were no eave lines above the affected areas of the home, and the gutter lines were located directly above the brick cavity and window frames with no overflow outlets  there was a high probability of substantial gutter overflow to the brick cavity and adjoining window frame of the games room  there was a dislodged roof tile to the gutter line above the kitchen and the valley flashing was also above the kitchen  there was evidence of water ingress to the internal ceiling with affected insulation, probably involving substantial water flooding from the adjoining gutter line and valley flashing  the water ingress appeared to have tracked/flooded the kitchen ceiling and cornice  the maintenance works the complainant should attend to were installation of additional downpipes and overflow outlets, replacement of stormwater connections to prevent downpipe backfill, and replacement of all silicone repaired roof tiles. The insurer engaged engineer MC to prepare a causation report on all claimed damage. In its report dated 19 August 2022, MC said:  the property was generally in good condition for its age, but the various leaks had been occurring for a prolonged period and there was significant long-term water damage  water leaking into the games room/laundry was due to the gutters regularly overflowing, as well water ponding on the adjoining patio roof (because of its low fall) and blowing back towards the building during high winds  water leaking into the games room/laundry internal wall was mostly due to leaks in the laundry trough. There were rising damp issues  a lifted tile near the northern gutter line resulted in leaks through the kitchen ceiling on numerous occasions. It was likely the tile lifted in 2021 when the complainants first noticed water damage in the kitchen  additionally, a roof tile above the kitchen broke sometime between 21 May 2022 (date of last gutter cleaning) and 3 June 2022 (WB inspection date), and a fragment had blocked the valley. The broken tile caused the damage to the kitchen on 10 June 2022  although the complainants said the 10 June 2022 event caused the most damage to the kitchen, it was not possible to determine how much of the damage was directly attributable. The damaged contents for which the complainants claimed included a desk, filing cabinets, rug and linen in the games room, and blinds and a pelmet in the laundry (above tap level). The insurer says that the damage to the lower kitchen cabinets, benchtop, splashback, cornices and to the various contents items referred to above were not damaged by a single storm or EOL event. Instead, that damage was from leaks over time, wear and tear and gradual deterioration. The PDS contains general exclusions under which there is no cover for damage to, caused by, connected with or arising from:  the home or contents not being in good condition (examples include the roof leaking when it rains, blocked gutters, previous damage having not been repaired) (page 31), and  wear, tear and gradual deterioration (page 34). Determination | Case number: 913968 Page 5 of 8 The insurer has also said the reported mould was due to long term moisture issues and water ingress. In addition, it refers to a notation in its claim notes stating the female complainant advised on 12 August 2022 ‘she is goin g to leave the mould and let herself get sick and this will be on [the insurer]’. Complainants say disputed damage should be covered The complainants reject any suggestion that there home was not in good condition. They say they took pride in keeping it well maintained, including by having the gutters cleaned every six months. The last clean before the 23 May 2022 storm occurred only two days earlier. The complainants say that 70% of the kitchen has been damaged by stormwater ingress, including the drawers, doors and cabinetry. They seek a complete kitchen replacement. They have provided a roof report dated 12 January 2023 from PE, roofers. PE identified the presence of various maintenance issues, but concluded: Overall in my inspection the maintenance issues do not contribute to any of the damages that occurred, and from my opinion as a tradesman see that the issues surrounding the damages are storm related, the damage in the valleys from movement due to high winds are also a storm issue which can be rectified by replacing any damaged tiles and putting valley clips in to prevent any damages or future movement. Further, the complainants have provided a screenshot of an email received from MC in which MC requested photos ‘especially [of] the lifted tile that s eems to be the start of the kitchen issues’. They say this confirms the true causation position. The email is not dated but it is apparent that it was sent shortly before MC prepared its report dated 19 August 2022. In addition, the complainants maintain that WB deliberately broke a roof tile on 3 June 2022 and placed part of the tile in the valley to set up a basis for the claim to be denied. They note the tile fragment was the main reason for water ingress during the 10 June 2022 storm. They also say that the insurer’s employed assessor tried to bully and intimidate them. The complainants have provided an email dated 18 April 2023 from DM and BM, who they say are their neighbours. According to the email, on 3 August 2022, DM and BM heard the assessor talking to WB about trying to redirect the claim to wear and tear. Further, they witnessed the assessor being aggressive towards the female complainant. In addition, the complainants have provided numerous photos and videos of the damaged areas and items, including the allegedly deliberately damaged roof tile. As for the disputed contents claim, the complainants say that due to the water ingress the items in the games room became mould affected and the laundry items were water damaged. Insurer is entitled to partially deny the claims Based on the exchanged information, I am satisfied that the insurer is entitled to partially deny the claims as it has done. This is because:  the reports of WB and MC provide cogent and persuasive support for the insurer’s decisio n  PE’s report was prepared more than seven months after the storm events, is less detailed than the reports of WB and MC and overall less persuasive  the email from MC the complainant relies on does not carry more weight that MC’s formal report prepared soon after, and the report confirms the presence of a lifted tile Determination | Case number: 913968 Page 6 of 8  the damage to the benchtop and splashback tiles was caused by the long term swelling of the lower cabinets, not due to water damage to the upper cabinets  the insurer did inform the complainants on 1 August 2022, that it would send WB to investigate the complainants’ concern about a mould smell in the laundry drawers. The cash settlement the insurer paid for the laundry damage allowed for their replacement  the allegations of misconduct by WB and the assessor are serious and I need to be comfortably satisfied on the balance of probabilities they are true. The complainants’ comparison of photos and timelines are not sufficient to persuade me  I am unable to place any weight on the email the complainants received from DM and BM on 18 April 2023. To have any real evidentiary value, their comments would need to at least be set out in a signed statement  further, and in any event, the insurer replaced the broken tile and removed the fragment. It also partially covered the 10 June 2022 storm claim. 2.2 Is the insurer required to increase its settlement offer? Yes. The SOW on which the offer is based was prepared eight months ago and does not allow for pre-painting wall preparation. An increased 25% contingencies uplift is to apply. It is also reasonable that the uplift be applied to the $600 cabinet doors component. Insurer has offered a further cash settlement Previously, the insurer has paid the complainants cash settlements, being:  $5,271 for contents damage due to power issues associated with the 10 June 2022 storm  $5,783.67 for damage to the laundry from EOL. In addition, on 9 September 2022, the insurer offered to pay the complainants a further $12,280.24 cash settlement, calculated as follows:  $8,066.87 for covered building repair work  $1,613.37, being a 20% contingencies uplift  $600 ex gratia payment towards replacing cabinet doors disposed of without approval  $1,000 matching undamaged parts maximum benefit, for the storm claims  $1,000 matching undamaged parts maximum benefit, for the hot water system EOL claim. Insurer is required to increase cash settlement offer A cash settlement must be based on a reasonable quote for repairs, actionable by a retail customer. An uplift is then to be applied to the quoted amount to allow for contingencies and the loss of the lifetime guarantee that applies to insurer approved repairs. The $8,066.87 the insurer has offered is based on WB’s itemised SOW and quote, dated 7 September 2022. While the repair works listed appear to be reasonable, WB has specifically noted that its pricing for painting was based on an assumption no preparation work to the walls would be required. As such, the SOW acknowledges that there is a potential for additional work to be required, for which it has not allowed for in the quoted amount. I also note that the SOW/quote was prepared eight months ago. It is reasonable to assume that labour and material prices will have increased during that period. In the circumstances, I am satisfied that it is reasonable that the contingencies uplift to be applied should be 25% rather than 20%. Determination | Case number: 913968 Page 7 of 8 The insurer has included in the cash settlement offer $600 as an ex gratia payment towards cabinet doors the complainants disposed of before it had the opportunity to inspect them. The insurer says that, strictly speaking, it would be entitled to refuse to make that payment as the complainants breached a policy condition by depriving it of the chance to examine the doors. However, given the amount involved and as the insurer has included the cabinet door allowance in the cash settlement offer, I consider that it is reasonable that the contingencies uplift applies to it as well. Accordingly, if the complainants accept this determination, the insurer is to pay them $12,833.59, calculated as follows:  $8,666.87 for covered building repair work and for cabinet doors  $2,166.72, being 25% contingencies uplift  $2,000, being the two undamaged parts maximum benefit amounts. 2.3 Is non-financial loss compensation payable? No. While the complainants have found the claim process stressful, I am not satisfied that the insurer caused unreasonable delay or otherwise mishandled the claims. AFCA can award compensation for poor claim handling Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400) where the insurer’s actions have caused an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with the complainant’s expectation of enjoyment or peace of mind. Insurer is not required to pay compensation The complainants s ay that the insurer’s claim handling caused them major stress and inconvenience and compromised their health. They refer to the alleged misconduct by WB and the insurer’s assessor as well as general inadequacies in the claim assessment s. They also say they had to deal with multiple claim managers, which caused frustration and delays. As noted above, I am not satisfied that the complainants have proven the alleged misconduct. After reviewing the insurer’s claim notes and correspondence between the parties, I am also not satisfied that the insurer unreasonably caused delay or otherwise mishandled the claims. To the contrary, the insurer promptly engaged experts, made claim decisions without undue delay and revisited those decisions as the complainants raised further issues or concerns. I accept that the complainants have found the claims process stressful and frustrating. However, the insurer is not required to pay compensation for that because I am not satisfied it caused unreasonable delay or otherwise mishandled the claims. 2.4 Why is the outcome fair? The disputed damage was more likely than not due to excluded causes. The alleged misconduct has not been proven and, regardless, the broken tile was replaced. It would therefore not be fair to require the insurer to cover more of the claim. It is fair that an increased contingencies uplift is to apply given the age of WB’s SOW and its non-inclusions. Determination | Case number: 913968 Page 8 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.