Dispute over building scope of works and settlement amount, temporary accommodation, delays and non-financial loss after flood claim
Text of the determination
Determination
Case number 913492
Financial firm Hollard Insurance Partners Limited
Determination | Case number: 913492 Page 1 of 12
Case number: 913492 29 August 2023
1 Determination overview
1.1 Complaint
The complainant lodged a claim on her home and contents policy held with the financial firm
(the insurer) on 27 February 2022 for damage to her property due to a flood event. The
certificate of insurance has two joint policyholders. This complaint is being raised by
policyholder S.
The complainant says her property was sold and due to settle at the time of the flood event,
but the sale fell through. The complainant says the insurer caused the sale to fall through
because it did not act quickly enough to clean up the debris from the event.
While the insurer accepted liability for the claim and settled the contents portion of the loss, a
dispute arose regarding delays, the building scope of works (SOW), additional loss to the
property and temporary accommodation benefits.
The insurer does not deem the complainant’s SOW to be a fair and reasonable amount and
relies on its own SOW to settle the complainant. On 13 June 2023, the insurer provided an
updated quote from its builder for $209,917.57 and offered an additional 20% uplift to this
amount.
1.2 Issues and key findings
Is the insurer ’ s scope of works fair and reasonable?
Yes. Overall, the panel finds the insurer’s SOW fair and reasonable, except the insurer
should:
increase its risk transfer margin to 25% (rather than the 20% offered)
cover the cost to remove any further mould which may have occurred between June and
December 2022
increase settlement for the kitchen appliances
ensure the new tiles quoted are of the same type, standard or specification as the existing
tiles.
Should the insurer pay for additional temporary accommodation costs?
No. The insurer’s additional cash settlement of $28,000 is fair and reasonable.
Should non-financial loss be awarded?
Yes. The panel considers it fair in the circumstances that the insurer pays non-financial loss
compensation of $3,900.
Should indirect financial loss be awarded?
Yes. The insurer is liable to reimburse the cost of $2,750 to the complainant for providing an
itemised quote.
Determination | Case number: 913492 Page 2 of 12
Why is the outcome fair?
The outcome is fair because the panel is satisfied the insurer’s quote largely reflects the costs
to repair the damage caused by the flood event, subject to the additional amounts for kitchen
appliances and mould rectification. The panel also considers it fair for the insurer to take all
reasonable steps to ensure that the tiles quoted are matching as close as possible to the
original tiles before settlement takes place, given the concerns raised by the complainant.
The panel also considers there were errors in the claims handling that means it is fair for the
insurer to pay an additional amount of non-financial loss compensation.
1.3 Determination
This determination is partially in favour of the complainant.
Within 14 days of the complainant’s acceptance of this determination the insurer is to pay the
complainant:
$275,151 for the building claim
$28,000 for an additional 16 weeks of temporary accommodation
$3,900 for non-financial loss compensation
$2,750 for the cost of obtaining an itemised quote.
The panel considers it fair for the insurer to confirm the quality and type of tile quoted is
equivalent to the original tiles in the property prior to making settlement. In the event the
insurer can show the quality and type of tile is comparable, the panel accepts it is fair for the
insurer to settle as per its quote and is not liable for any further amount for the tiles. In the
event it cannot do so, the insurer is to settle the tiles based on the amounts quoted in the
complainant’s quote, as outlined in section 2.1 below.
Determination | Case number: 913492 Page 3 of 12
2 Reasons for determination
2.1 Is the insurer ’ s quote fair and reasonable?
Yes. Overall, the panel finds the insurer’s SOW fair and reasonable, except the insurer
should:
increase its risk transfer margin to 25% (rather than the 20% offered)
cover the cost to remove any further mould which may have occurred between June and
December 2022
increase settlement for the kitchen appliances
ensure the new tiles quoted are of the same type, standard or specification as the existing
tiles.
Parties dispute amount require to repair damage
There is no dispute the complainant’s property was flood damaged. The insurer settled the
contents claim as a total loss. However, there is a dispute over the building settlement.
The insurer provided a quote from its builder, QA, updated 15 June 2023. It says the quote is
based on a SOW from a Building Consultant (SE) completed on 5 October 2022 and an
engineering report from 12 August 2022.
The insurer offered settlement of the building repairs for $209,917.57 plus 20% contingency
(total of $251,901.08). It says the quote reflects the works required to be repaired due to the
flooding event, outlined in S E’s SOW.
The complainant provided a quote from a builder for repairs for $331,622.23.
The insurer says the complainant’s quote for repairs does not provide a breakdown of the
works that includes exact measurements or rates and that the quote is not fair and
reasonable.
The complainant raises several concerns with QA’s quote. These are addressed separately
below.
Insurer has allowed for correct flood water levels
The complainant says the level of the flood water was 1200mm above ground level, and that
the insurer should allow for the appropriate removal of affected plasterboard. The QA quote
allows for installation of plasterboard 1200mm high on internal walls, and the SE SOW
confirms this, and says ‘elevated moisture readings exceeded the plasterboard wall sheet
joint and therefore the removal of wall linings to a 1.2m level has been allowed for in the
scope ’ .
The complainant has not provided sufficient information to challenge the findings of SE and
the allowance for plasterboard in the SOW. Therefore, the panel is satisfied QA quoted for the
correct height for the removal of affected plasterboard, and the insurer is entitled to rely on its
quote for this aspect of the claim.
No evidence of damage to garage roller doors and back fence
The complainant says there is additional damage to the property, including the garage roller
doors and back fence, but has not provided any evidence to support her position.
Determination | Case number: 913492 Page 4 of 12
The SE SOW does not include this damage. Based on the available information, the panel
accepts, on balance, the insurer is not required to cover any repairs to the garage roller doors
and back fence.
Insurer is not liable for termite remediation works
In the quote, QA states the following items are required to be completed prior to the repairs
commencing:
We recommend that a suitably qualified trade attend site to inspect the condition
of the wall framing and tie downs and make any necessary rectifications required
to keep the framing compliant with the relevant building codes, concentrating on
the pre-existing termite damage.
The insurer says the builder cannot complete the repairs until the complainant repairs the pre-
existing damage.
The insurer appointed an engineer to complete a report dated 12 August 2022. The report
says:
the eastern wall of the rumpus room has a timber stud with a severely damaged base,
possibly due to previous termite or pest attack
termite or pest damage was observed to the south east corner of the ensuite
another stud, separating the ensuite and walk in robe areas, has pest damage at the base
at the south east corner of the walk-in robe there are more studs that have been pest
damaged - this damage extends up to where the wall plasterboard cladding remains.
In response, the complainant has submitted a building and pest report dated 12 January 2022
which says:
no evidence of active or live termites
evidence of termite activity and/or damage was found
termite management program was out of date
undetected timber pest risk assessment was extremely high.
Based on the available information, t he panel accepts the insurer’s position that the termite
damage is pre-existing and not due to the flood event. The panel does not consider the
insurer is liable for any costs relating to any termite damage.
Information does not show concrete slab damaged due to flood
The complainant says the insurer’s scope does not include foundation cracking. She provided
photos from 2015 after a prior flood, which she says shows there are no cracks in the
foundation.
The insurer ’s engineering report dated 12 August 2022 says:
there are cracks to the concrete slab typically up to 1.5mm in width and are located
throughout the slab
the cracks to the concrete slab generally have rounded edges and do not appear to be
new
the cracking to the concrete slab footing system is considered as long term drying
shrinkage cracking and has not been caused by the flood event, nor has it affected the
current structural performance of the slab.
Determination | Case number: 913492 Page 5 of 12
The complainant has provided a report from JH dated 21 September 2016 from the prior
claim. The complainant says the report shows that the cracking in the concrete slab was
caused by the flood. In summary, the report says:
In fact, all of the plotted measurements remained within 10mm of the datum, and
this is considered to be very good considering the house has been built in a low-
lying area on reactive clay soil and is adjacent a natural creek/watercourse that
has flooded on two occasions now.
Since the insurer’s engineering report was completed closer to the date of the flood, the panel
considers its conclusions that the flood did not cause damage to the concrete slab are
persuasive. The panel considers the information the complainant provided is not sufficient, on
balance, to show the flood event damaged the slab. The report from 2016 is from several
years before this flood event a nd the panel does not consider it supports the complainant’s
position. The insurer is not liable for damage to the slab.
Landscaping costs and loss in value of property not covered under the policy
The complainant provided a quote for the landscaping for $32,899.90, as she says the insurer
disconnected the electricity, which destroyed the plants in her garden.
However, the policy clearly states ‘trees, plants or shrubs’ are excluded under the building
cover. The panel is satisfied the costs claimed for the plants are not covered under the
building claim.
The complainant also raised concerns with the insurer’s delays on the claim and that her
home has lost value. The panel does not accept the insurer is liable for any potential loss in
value of the property. The panel does not consider the complainant has shown the insurer is
responsible for the sale of the home falling through, or that the home has now lost value due
to the insurer’s actions.
However, it has considered whether the insurer delayed the claim and whether non-financial
loss compensation is payable. This is addressed below.
Insurer not required to pay additional amount for rubbish removal
The complainant also seeks costs for the removal of debris. She says the insurer deducted
$1,500 from the contents settlement, when it should have been in addition to the contents
settlement.
The insurer says this was included in an earlier payment in a total loss payment under the
contents section of the policy.
The PDS states there is an additional benefit for debris removal. However, it states:
Any amount we pay for this Additional Benefit is payable within your sum/s
insured, not in addition to. The most we will pay per claim is your sum insured
plus Gap Cover… less any applicable excess.
The panel accepts the insurer has met its obligations under the policy by paying the debris
removal under the contents total loss settlement.
Determination | Case number: 913492 Page 6 of 12
Insurer to cover the cost to remove any further mould which may have occurred
QA did not quote for any mould removal, and the quote from PB lists mould treatment at
$6,350.
Mould remediation was completed by the insurer and a certificate of mould remediation was
issued on 1 June 2022.
However, the insurer did not offer the complainant the settlement of the SOW until December
2022. In the circumstances, the panel considers it fair for the insurer to remove any further
mould which may have occurred between June 2022 and December 2022.
In order to bring finality to the complaint and avoid any further delays, the panel considers it
fair for the insurer to settle the complainant based on the amount in PB’s quote for $6,985
($6,350 plus GST).
Insurer to increase payment for kitchen appliances
The insurer says it will always try to best match the existing items as close as possible, in line
with the policy wording. The panel accepts this is fair in the circumstances regarding most of
the repairs required. However, in some circumstances it is not fair for the insurer to limit its
liability if the complainant has shown the items are worth more than the quoted amounts.
The complainant raised concerns with the kitchen appliances not being of the same quality.
The complainant has provided information that shows, on balance, the kitchen appliances are
of a certain brand and quality, which are quoted as more than the amounts in QA’s quote,
which does not specify the brand and quality. The panel considers in this instance it is fair for
the insurer to settle the cost of these items based on the compl ainant’s quote. However, it is
only required to settle for one of each item.
QA’s quote includes the following for the kitchen appliances.
QA - Quoted items Quantity Unit P rice
Dishwasher 1 $ 725
Wall oven 1 $1,200
Cooktop 1 $950
Rangehood 1 $550
Total $3, 425
In contrast, the quote from PB provides the following:
PB - Quoted items Quantity Unit price
Technika dishwasher 1 $1,587.50
Technika wall oven 1 $1,587.50
Determination | Case number: 913492 Page 7 of 12
PB - Quoted items Quantity Unit price
Technika cooktop 1 $1,587.50
GDA rangehood 1 $1,587.50
Total $ 6,350
The panel does not find the quote from QA persuasive because it does not clarify whether the
quoted items match the damaged items. The panel consider it fair for the insurer to pay an
additional amount of $3,217.50 ($2,925 plus GST), for the kitchen appliances.
Insurer to confirm tile quality before settlement
The complainant also says the property had high quality Italian ceramic tiles which the QA
quote did not allow for.
The PB quote provides a bulk figure for all tiles, separating only the wet and dry areas of the
property, as highlighted below:
PB - Quoted items Quantity Unit price
Supply of tiles to wet areas 93m2 $ 12,884 .73
T iles i n lieu of vinyl flooring 224m2 $ 55,216 .56
Total $68,101.29
In comparison, the QA quote breaks down floor coverings per room and offers an itemised
costing. For this reason, the panel finds the QA quote is more persuasive and likely more
accurate.
However, it is not clear if QA’s quote intends to source materials of the same type, standard
or specification, because these details are not specified. The panel considers it fair for the
insurer to take all reasonable steps to ensure that the tiles quoted are matching as close as
possible to those tiles that were originally in the property. This ensures the complainant is
being returned to as close as possible to the same position she was in prior to the loss.
The panel considers it fair for the insurer to confirm the quality and type of tile quoted is
equivalent to the original tiles in the property prior to making settlement. In the event the
insurer can show the quality and type of tile is comparable, the panel accepts it is fair for the
insurer to settle as per QA’s quote. In the event it cannot do so, the insurer is to settle the tiles
based on the abov e costs outlined in PB’s quote.
Fair for insurer to cash settle repairs
The insurer also agreed to cover the damage to the pool. This does not appear to be in
dispute, therefore the panel has not addressed this in the determination.
The complainant requests a cash settlement because of loss of faith in the insurer. The
insurer has offered the complainant a cash settlement because of pre-existing defects
identified within the property.
Determination | Case number: 913492 Page 8 of 12
The panel considers QA’s quote provides a detailed breakdown of the works and itemised
costings. The panel also considers QA’s quote better refl ects the costs to repair the damage
associated with the flood. This is because it is based on a detailed report and SOW from a
building consultant and engineer.
The panel considers it fair, subject to the insurer confirming the tiles quoted in QA’s are of a
comparable quality to the original tiles, for the insurer to settle the complainant as follows:
$209,917.57 based on QA’s quote
$6,985 for mould removal
$3,217.50 for the kitchen appliances
Total: $220,120.07
The insurer offered an additional 20% uplift to its settlement offer. The panel considers that
given the circumstances of the claim, the complainant’s particular vulnerabilities, and the
lateness of settlement, it is fair for the insurer to pay an additional 25% uplift to the final
settlement amount to account for the transfer of risk to the complainant. This brings the total
settlement to $275,151 (rounded up).
As outlined above, in the event the insurer can show the quality and type of tile is comparable
to the tiles that were existing at the complainant’s property, the panel accepts it is fair for the
insurer to settle as per QA’s quote and will not be required to pay any further amount on the
above settlement. In the event it cannot do so, the insurer is to settle the tiles based on the
above costs outlined in PB’s quote.
Interest not payable on building settlement
Section 57 of the Insurance Contracts Act 1984 (Cth) outlines if an insurer is liable to pay an
amount to a person under an insurance contract, it is liable to pay interest from when it was
unreasonable for the insurer to have withheld payment of the amount. However, whilst the
panel accepts there were delays on the matter, the insurer’s updated quote is dated 15 June
2023 and it attempted to settle its assessed loss at this time. The panel does not consider it
would be fair to require the insurer to pay interest on any outstanding sum.
However, the panel has addressed the delays on the claim regarding non-financial loss
compensation below.
2.2 Should the insurer pay for additional temporary
accommodation?
No. The insurer’s additional cash settlement of $28,000 is fair and reasonable.
I nsurer’s offer for temporary accommodation costs is fair and reasonable
The policy outlines if the damage to the property from an insured event is so extensive it
cannot be lived in, the insurer will pay reasonable accommodation costs from the time it
becomes unliveable until it is liveable again, up to a maximum of 52 weeks.
The complainant says the insurer should provide temporary accommodation outside of the
policy limits.
The insurer has paid the complainant the full 52 weeks of temporary accommodation. The
insurer has since offered the complainant an additional cash settlement of $28,000, which it
says is the equivalent of 16 weeks further temporary accommodation.
Determination | Case number: 913492 Page 9 of 12
There is no dispute the property is not liveable, as the insurer has completed the interior strip
out of the property. However, the repairs are yet to commence, and more than 52 weeks have
elapsed since the claim was lodged.
Given the insurer has paid the full policy entitlement, yet repairs have not yet commenced,
the panel considers the insurer’s offer of an additional 16 weeks of temporary accommodation
is fair and reasonable.
The panel consider it fair for the insurer to give the complainant the option of either:
accepting the settlement of $28,000 for temporary accommodation costs; or
arranging an additional 16 weeks of temporary accommodation.
2.3 Should non-financial loss be awarded?
Yes. The panel considers it fair in the circumstances that the insurer pays non-financial loss
compensation of $3,900.
AFCA can award compensation for non-financial loss
Under AFCA Rule D3.3 AFCA may award compensation of up to $5,400 for non-financial loss
where a complainant suffers an unusual amount of physical inconvenience, time taken to
resolve the situation or interference with the complainant’s expectation of enjoyme nt or peace
of mind, due to the insurer’s conduct of the claim.
AFCA takes a conservative approach to the award on compensation for non-financial loss
and will not award compensation for the usual inconvenience suffered when making a claim.
Errors caused an unusual degree of physical inconvenience and stress
The complainant raised several concerns with the insurer’s handling of the claim. This
included a lack of communication, failure to proceed with claim based on its SOW, failure to
provide information and documentation on the claim, and failure to provide a claims manager
that required her to have to repeat sensitive information numerous times. She also says the
insurer’s communication regarding accommodation was unreasonable and gave
unreasonable time pressures to vacate her accommodation.
The complainant provided a timeline of her contact with the insurer and emails she had sent
seeking updates throughout the claim and explaining her concerns and vulnerabilities.
The insurer says the severity and scale of the flood events created delays across the entire
insurance industry and was outside the insurer’s control.
The insurer provided its claim notes for the claim. These show several requests for updates
from the complainant and concerns raised regarding her personal circumstances and
vulnerabilities. These claim notes show there were delays on the claim and a lack of contact
from the insurer to the complainant at times.
The panel does not accept the insurer is liable for the loss in value of the property or the fact
the sale of the house fell through. However, the panel accepts there were delays on the claim
that caused significant unnecessary stress for the complainant. The panel also accepts the
insurer is not liable for the loss of the plants under the policy. However, the panel accepts
there was a communication issue between the insurer and complainant which likely led to the
power disconnection. This lack of communication likely contributed to the loss, which led to
further physical inconvenience for the complainant.
Determination | Case number: 913492 Page 10 of 12
The panel accepts there were widespread delays and issues affecting the insurer during this
claim which were outside the insurer’s control. The panel also accepts additional factors
outside the insurer’s control likely led to further stress and inconvenience for the complainant,
such as the house sale falling through.
However, the panel considers the complainant’s particular vulnerabilities should have been
taken into account and it could have done more to assist the complainant in the
circumstances. The panel also accepts there were delays in the overall handling of the claim
which caused an unusual degree of physical inconvenience and stress to the complainant.
The insurer has already paid $1,500 in compensation for non-financial loss. The panel
considers it fair, taking into account all the circumstances, for the insurer to pay an additional
amount of $3,900 for non-financial loss compensation. This is equivalent to the maximum
amount of $5,400, less the amount already paid.
The complainant says the separate temporary accommodation arranged for policy holder D
was inadequate. However, the panel has not considered any non-financial loss suffered by D
because he is not a party to this complaint.
2.4 Should indirect financial loss be awarded?
Yes. The insurer is liable to reimburse the cost of $2,750 to the complainant for providing an
itemised quote.
Insurer to pay for itemised quote
The insurer says it was not able to assess the PB quote because it was not itemised. The
complainant then asked PB to itemise the quote for review by the insurer.
The complainant spent $2,750 to obtain a revised and i temised builder’s quote from PB .
As the complainant provided an itemised quote for the insurer to consider, and it assisted the
panel in reviewing the insurer’s settlement, the panel considers it reasonable for the insurer to
reimburse the cost of $2,750 to the complainant.
Determination | Case number: 913492 Page 11 of 12
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience as in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant provisions of the policy
Product Disclosure Statement
Page 43
Matching benefit
Determination | Case number: 913492 Page 12 of 12
…
When we are repairing your building or contents, we will attempt to obtain a finish
that matches existing undamaged parts of the affected area, where materials to
achieve this can be reasonably sourced.
If matching cannot be achieved, if we pay your claim for loss or damage you are
also covered for up to an additional $750 in any other claim for materials required
to bring about a matching finish to the area that has been repaired or replaced.
This benefit can only be used to match damaged:
floor coverings…
Page 63
When repairing or replacing damaged parts of your building and contents, we will
take all reasonable steps to match the materials and finishes with the surrounding
undamaged parts.
Page 61
If we pay your claim we will, in consultation with you:
repair your damaged property where it is practicable and economical to do
so;
replace your lost or damaged property where it is not practicable and/or
economical to repair it; or
pay you the value that fairly represents your loss, in the form of cash or a
pre-paid store card*, up to the relevant sum insured stated on your current
Certificate of Insurance.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.