Home / RACQ / Determination 913441
Determination 913441
Storm damage to roof claim declined; settlement offer and temporary accommodation dispute
Summary
The complainant claimed for storm damage to his home including the roof, and disputed the insurer's settlement offer and temporary accommodation allowance. AFCA found the roof damage was not caused by the storm and not covered, but ordered the insurer to appoint a building consultant to obtain new quotes and reassess temporary accommodation costs.
The complainant bears the onus of showing the storm damaged the roof, and the expert evidence and prior claim history showed wear and tear and maintenance-related deterioration rather than storm damage.
Issues
- Claim denial primary · not upheld
“There is no persuasive evidence the storm damaged the roof; the insurer is not required to repair the roof.”
- Claim amount dispute secondary · upheld
“The insurer must arrange a building consultant to obtain new repair quotes and evaluate a fair temporary accommodation cost.”
- Poor claim handling secondary · not upheld
“The insurer handled the matter reasonably overall and is not required to pay compensation.”
Subjects and remedies
health or medicalhome or building damagenatural disasterpay compensationreassess claim
Text of the determination
Determination
Case number 913441
Financial firm RACQ Insurance Limited
Determination | Case number: 913441 Page 2 of 7
Case number: 913441 16 December 2022
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer).
He lodged a claim for storm damage on 9 May 2022. The complainant says the storm
occurred on 22 February 2022.
The insurer agreed to accept the claim for internal damage. It says the roof was already
compromised and not damaged by the storm. The insurer did not agree to cover this aspect
of the damage. It says the complainant must attend to significant maintenance at the home
before it can undertake repairs for the covered losses, or he can accept a cash settlement.
The complainant wants the entire roof replaced by the insurer. Based on the insurer’s delays,
he also says he has been forced to live without power in the home. He says there is
significant mould in the home and it is affecting his health. He seeks cover for his loss and
compensation for the insurer’s poor handling of the claim.
1.2 Issues and key findings
Is the insurer’s settlement offer fair ?
Yes. The insurer is not required to replace the roof. However, it should arrange a building
consultant to obtain new repair quotes for the building damage and the mould remediation.
The consultant also needs to calculate a fair value for temporary accommodation. The
settlement stipulations are outlined in section 2.1 of this determination.
Is an award of compensation appropriate?
No. There is no need for the insurer to pay compensation.
Why is the outcome fair?
There is no persuasive evidence the roof was damaged by the storm or that the insurer is
liable for it. The quotes prepared are several months old and it is fair that new quotes are
arranged by a consultant, who should also calculate the cost for temporary accommodation. It
is fair that the insurer covers temporary accommodation under the terms outlined in section
2.1. The insurer handled the matter reasonably and is not required to pay compensation.
1.3 Determination
This determination is substantially in favour of the insurer.
The insurer is not required to cover the roof damage. It must reassess its liability to the
complainant as detailed in section 2.1 of this determination, under ‘Insurer to appoint a
building consultant to oversee settlement of claim’ .
Determination | Case number: 913441 Page 3 of 7
2 Reasons for determination
2.1 Is the insurer’s settlement offer fair ?
Yes. The insurer is not required to replace the roof. However, it should arrange a building
consultant to obtain new repair quotes for the building damage and the mould remediation.
The consultant also needs to calculate a fair value for temporary accommodation. The
settlement stipulations are outlined in section 2.1 of this determination.
Complainant says roof damaged by storm
The complainant says heavy winds and heavy rain meant water got under the roof of his
home and caused damage. The home has significant mould intrusion and the complainant
believes the insurer should replace the roof and cover the resultant damage inside the home.
Whilst the insurer accepts the complainant’s home suffe red storm damage, it says the roof
was not damaged by the event. It also says water had been entering the roof space for some
time through a ‘deteriorated and compromised’ roof structure. The insurer agrees to cover the
resultant damage but not the roof damage.
It says the complainant is liable to repair or replace the roof. If the complainant will not do this,
the insurer says it must cash settle him for the damage.
The complainant says he has been without power since the loss. He wants cover for
temporary accommodation and notes he has dogs, accommodation for which the insurer
would not cater for.
Complainant must show storm damaged the home’s roof
The insurer’s policy is made up of the Certificate of Insurance (COI) and the Product
Disclosure Statement (PDS). There is no dispute the insurer sent these documents to the
complainant.
The policy covers damage caused by one of the listed events. Amongst these events is cover
for loss or damage caused by a storm.
There is no dispute a storm occurred or that it caused damage inside the home. However, the
insurer disputes that the storm damaged the roof. To be covered for roof damage, the onus
therefore lies with the complainant to show the storm (or another insured event) damaged it.
Expert evidence does not detail storm damage to the roof
Several experts inspected the damage at the home.
The insurer arranged for builder RC to attend the site. RC noted the roof had rusted, non-
compliant gutters and roof sheeting, with insufficient pitch. Debris on the roof was causing
water to pool, rust the sheets and allowing water to enter the roof space through the laps in
the sheeting. RC recommended:
the box gutters be replaced
replacing the rusted roof sheets
cleaning the debris from the roof
re-pitching the roof to a minimum one-degree fall, and
resealing the deteriorated roof penetrations.
Determination | Case number: 913441 Page 4 of 7
The insurer informed the complainant the above issues were maintenance-related and not
losses caused by the storm. It says this work is not covered by the policy.
A second assessment was conducted by PR on 28 July 2022. PR noted there was ‘ rust and
deterioration to the roof ’ and it was ‘at the end of its serviceable life’. Th e complainant would
have to replace the ‘roof sheets and flashings, the [box] gutters, sky flashings and solar hot
water mounting brackets ’. PR prepared two scopes of work for the covered repairs inside the
home for $48,852.53 (10 August 2022) and $40,052.80 (18 August 2022).
In response, the complainant obtained an informal one-page handwritten quote from MJ for
$225,000. This includes up to $70,000 to remove and replace the roof.
The complainant also obtained an undated engineer’s repor t from PL. This report detailed
that the roof fall was not built to the applicable standards in 1990. Despite this, PL reports the
roof was in ‘reasonable condition’ and ‘adequately maintained’.
Mould remediation specialist FR provided a report dated 29 August 2022. It determined that
all mould affected areas of the home could be remediated. FR identified the roofing would
have to be ‘fixed’ prior to this to avoid further water ingress. It proposed to undertake the
required work at a cost of $32,998.35.
Complainant unsuccessfully claimed previously for roof damage
The insurer provided details of a prior claim the complainant made to it from 14 December
2020. This claim was also considered by AFCA in determination 782947.
As part of this claim, the complainant sought cover for a damaged box gutter on the roof.
The AFCA determination accepted expert evidence that there had been water ingress into the
ceiling areas of the home for some time. This was caused by wear and tear to the roof area.
The complainant was not entitled to cover for his claimed loss.
Further, the insurer wrote to the complainant on 11 March 2021 (nearly a year prior to the
claimed loss in this complaint) and said:
maintenance is required to various areas of your home including the roof sheets,
gutters, [fascia], and internal ceilings as they were not in sound condition and
lacked proper maintenance. We are of the view that the roof sheets, gutters and
internal ceilings require replacement due to lack of maintenance and its general
poor condition
Insurer is entitled to deny the roof claim
Based on the above, I am not satisfied the claimed damage to the roof was caused in a storm
event. Photos of the home show the deteriorated condition of the roof and prior (and
apparently unsuccessful) repair attempts. There is no persuasive evidence any damage was
caused to this area by the storm.
I accept there are likely numerous areas of water ingress and it is possible that wind driven
rain may have lifted roof sheets to allow rain in as well. There is no evidence the storm
caused damage to the roof though. I accept the insurer is not required to repair the roof. It is
apparent there had been water ingress into the home for some time.
Determination | Case number: 913441 Page 5 of 7
Insurer must arrange new repair quotes to resolve the matter
PR prepared two quotes totalling more than $40,000. It is not clear if one quote replaced the
other. The insurer relied on the higher of the two quotes, but the quotes cite different areas in
the home (and some of the same areas). Prior to resolving the matter, I consider a definitive
and up-to-date new quote should be obtained. It must be done by a repairer prepared to do
the work. This will give certainty about the value of the settlement.
Similarly, the mould has likely worsened since the quote was prepared on 30 August 2022. I
consider it is fair a new quote is prepared by an expert prepared to do the work.
Both PR and FR may attend to providing the new quotes if they are prepared to do the work.
Complainant is entitled to temporary accommodation costs
The complainant is entitled to temporary accommodation at the home in circumstances where
the home is damaged and left ‘ unfit to live in ’ . I accept the extensive mould infestation
certainly left it unfit to live in.
The insurer acknowledges it is liable for temporary accommodation costs. It allowed $7,350
for this, based on $225 per day over four weeks and a further $75 per day for 14 additional
days. It is not clear where the insurer got this calculation from. It allowed $25 per person, per
day, but it is not clear why this was its basis for settlement. This is not detailed in the PDS or
the COI. The complainant is also upset the insurer did not agree to cater for his pet dog(s).
The PDS outlines the policy covers the cost of temporary accommodation for up to 12
months. It does not exclude animals. The complainant had cover for a dog under the home
and contents policy. Given this, I am satisfied it is fair the insurer should cater to the dog (or
dogs) for the same period it covers the complainant.
The COI confirms temporary accommodation covers up to 10% of the building sum insured
($336,000). This means the complainant is potentially covered for up to $33,600. There is no
apparent stipulation limiting cover to $25 per person, per day.
The complainant did not report the damage immediately after the storm and the insurer
should not be responsible for this delay. Its initial review and decision in relation to indemnity
took seven weeks. I am satisfied the water intrusion and mould made the home unliveable
during this period. The insurer should cover this seven-week period in addition to whatever
reasonable duration and cost is determined to attend to the repair work.
Insurer to appoint a building consultant to oversee settlement of claim
I acknowledge PR’s initial review of the damage cited extensive remedial work was required
before the insurer can attend to any claim repair work. This remedial work is the
complainant’s responsibility. I accept he must either attend to extensive restorative work as
suggested or replace the roof. This is not the insurer’s responsibility.
The complainant has so far not undertaken this work. This makes it difficult for the insurer to
repair the interior damage and remediate the mould infestation. The home is still sustaining
periodical water ingress. Therefore, I consider a cash settlement is the fairest outcome. This
will require the obtaining of new repair quotes as detailed above.
To resolve this matter, I consider the insurer must arrange a building consultant to oversee
the resolution of the claim. This consultant should:
Determination | Case number: 913441 Page 6 of 7
arrange new or updated quotes for the covered building damage and the mould damage at
the home – these must be actionable quotes, based on the scopes already prepared and
involve experts willing to undertake the work
ascertain or determine appropriate accommodation for the complainant, his family and his
dog(s)
calculate an estimated time of repair for the covered work
include a 10% settlement contingency over and above the quoted amounts, to compensate
the complainant for the possibility of additional damage and the loss of a lifetime
guarantee.
Based on the consultant’s repair time estimate, the insurer must evaluate a fair cost for
temporary accommodation. This must be inclusive of the initial seven-week period between 9
May 2022 and 20 June 2022 and adequately cater for th e complainant’s needs.
There is no cover for the roof. The complainant is responsible to repair or replace the roof.
Whilst the complainant raised issues with a lack of power at the home, I accept this was due
to water ingress. This continued after the claim as the complainant did not attend to the roof
restoration work required. I am satisfied the insurer arranged lighting support. It has done
what it can to accommodate the complainant on this issue and has no further obligation.
Water intrusion will remain an issue until the roof is repaired or replaced.
2.2 Is an award of compensation appropriate?
No. There is no need for the insurer to pay compensation.
No need for the insurer to pay compensation
AFCA can award up to $5,400 compensation for non-financial loss. This must relate to poor
claims handling or other actions of the insurer which cause an unusual degree of stress,
delay, or inconvenience. We expect complainants to be moderately robust, and we will not
award compensation for the ordinary degree of inconvenience involved in making a claim.
The complainant says water intrusion affected his lights. He now has no proper lighting,
except for a light supplied to the living room and the home is also full of mould. He says the
insurer ’s customer service was poor and highlighted he suffers from medical conditions. He
says these have been exacerbated by the delays and the insurer’s handling of the claim.
I acknowledge the complainant has medical difficulties and I accept these were likely
exacerbated by the mould infestation in the home. The insurer did not cause the mould to
develop. It was due to water ingress and the delay in reporting the loss.
I accept the insurer attempted to explain its position and tried to assist the complainant.
Whilst I have suggested a different approach to facilitate settlement, I am satisfied the insurer
tried to accommodate the complainant and handled the matter reasonably overall.
The insurer is not required to pay non-financial loss compensation.
Determination | Case number: 913441 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.