Text of the determination
Determination
Case number 912547
Financial firm The Hollard Insurance Company Pty Ltd
Determination | Case number: 912547 Page 1 of 6
Case number: 912547 26 May 2023
1 Determination overview
1.1 Complaint
The complainant holds home building and contents insurance with the financial firm (insurer).
On 17 May 2022, a claim was lodged on the policy following land slippage during a storm
event on 7 April 2022.
The insurer agreed to cover damage to fencing and an external staircase and offered a cash
settlement. However, it has declined to cover the cost to reinstate the backyard and retaining
wall. It says the policy excludes storm damage to landscaping and retaining walls. It also says
that damage as well as internal damage to the home were due to long term, excluded causes.
The complainant maintains that the insurer should cover the entire claim as the true cause of
the damage was the storm and associated flooding of the creek behind the property.
The complainant is represented by his son, AA, who holds an enduring power of attorney. In
this determination, the complainant and AA are referred to as ‘the complainant’.
1.2 Issues and key findings
Is the insurer entitled to partially deny the claim?
Yes. The storm coverage set out in the policy expressly excludes damage to retaining walls
and landscaping. Further, the complainant has not shown the internal damage was due to the
storm. Rather, it is more likely from long term ground movement, which the policy excludes.
Is the insurer’s cash settlement offer reasonable?
No. A cash settlement must be based on a reasonable quote for repairs, actionable by a retail
customer. A contingencies uplift is then to be added to the quoted amount. The panel is not
satisfied that the quote the insurer relies on is reasonable, and it has not allowed an uplift.
Why is the outcome fair?
The policy does not cover storm damage to retaining walls and landscaping. On balance, the
internal damage was not due to the storm but was from excluded causes. It would therefore
be unfair to require the insurer to cover the disputed damage. However, the in surer’s cash
settlement offer is inadequate, so it is fair that the offer is increased.
1.3 Determination
This determination is partially in favour of the complainant.
If the complainant accepts this determination, the insurer is required to:
within 14 days, engage a builder not previously involved to prepare a scope of works
(SOW) that adequately accounts for claim related repairs, and an actionable retail quote
within 14 days of receiving the builder’s SOW/quote, pay the complain ant the quoted
amount plus a 15% uplift, less the policy excess.
Determination | Case number: 912547 Page 2 of 6
2 Reasons for determination
The parties provided numerous submissions to AFCA. While this determination does not refer
to them all, the AFCA panel taken each submission into account in reaching their decision.
2.1 Is the insurer entitled to partially deny the claim?
Yes. The storm coverage set out in the policy expressly excludes damage to retaining walls
and landscaping. Further, the complainant has not shown the internal damage was due to the
storm. Rather, it is more likely from long term ground movement, which the policy excludes.
Complainant must show a claimable loss under the policy
The complainant is required to show, on the balance of probabilities (that it is more likely than
not), that he suffered a claimable loss under the policy. This means he must show the loss
was caused by a risk for which he is insured.
Subject to the terms and conditions set out in the product disclosure statement (PDS), the
complainant’s policy covers damage to the insured property caused by a listed insured event.
Those events include ‘Storm, rainwater and flood’.
On 17 May 2022, the complainant lodged a claim with the insurer. He said that during a
severe storm on 7 April 2022, the creek behind his property rose. The creek’s increased
water flow caused a retaining wall to fail and a major section of the backyard to collapse. He
says fencing was lost, and the house sustained movement damage.
The insurer has agreed to cover the damage to fencing and to an external brick staircase.
Accordingly, to that extent, it accepts that the complainant has established a claimable loss
under the storm insured event.
Once the complainant proves the existence of a claimable loss, the insurer is liable for the
loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of
proving on the balance of probabilities the application of the exclusion or condition.
Insurer says the disputed damage is not covered
Following claim lodgement, the insurer appointed builder JL to assist with assessment. JL
inspected the property on 31 May 2022, and reported:
Due to excessive rainfall creek which runs through rear of property has eroded
away retaining walls to rear of property. Causing retaining wall, pool fences
above, gardens to be washed down creek. Brick stairs at rear of home have
detached & subsided due to rear yard being eroded away by water.
The insurer also obtained a geotechnical report from GG, engineering geologist. GG
inspected the property on 24 November 2022 and said:
the retaining wall was of non-engineered design and had been constructed without any
drainage measures
a major cause of the retaining wall’s collapse was its defective design
scouring at the toe of the slope face caused by the high intensity stormwater flow along the
creek was a principal cause for initiating the landslide down the slope behind the home
the slope face remained highly unstable
Determination | Case number: 912547 Page 3 of 6
based on an external inspection, the home did not appear to have been impacted by the
landslide, but its structural integrity must be assessed by a structural engineer.
SC, the insurer’s structural engineer, also inspected the property on 24 November 2022. SC
concluded that:
the dry stacked r etaining wall’s failure was consistent with a combination of:
> inadequate base width (defective design/workmanship)
> lack of rear wall drainage (defective design/workmanship), leading to hydrostatic
pressure build-up
> inadequate erosion control measures at the base of the watercourse
> long term erosion of the retaining wall’s toe from numerous storm water events
who actually owns the retaining wall is unknown, noting the local council had reconstructed
it after a collapse in 2000
the cosmetic cracking to the dwelling was unrelated to the landslip, and consistent with
long-term expansion and contraction (general building movement)
the subsided rear staircase required demolition and reconstruction.
Based on the reports of GG and SC, the insurer says the damage to the retaining wall and
backyard and the internal movement damage were not caused by the storm event. Instead,
the damages were from excluded causes given that the PDS states there is no cover for
damage caused by or resulting from:
gradual deterioration, wear and tear (page 41)
inherent defects, structural faults, faulty workmanship or design (page 42)
earth movement including erosion, subsidence, landslide, collapse, earth shrinkage and
expansion not directly caused by an earthquake, storm, rainwater or flood (page 42).
In addition, the insurer says that even if the storm caused the damage to the retaining wall
and backyard, it is still entitled to deny those aspects of the claim because:
the definition of ‘building’ set out on page eight of the PDS specifi cally does not include
‘trees, shrubs or other plant life including lawns, artificial grass and landscaping…’
the ‘storm, rainwater and flood’ insured event excludes cover for damage to ‘plants, trees,
artificial grass and lawns’ and to ‘retaining and/or freestanding outdoor walls’.
Complainant says claim should be covered in full
The complainant submits that the policy includes cover for damage caused by flood, the
flooding from the storm ultimately caused all the damage to the insured property, so the
insurer should accept the entire claim. He says:
The damage caused to the property was due to flood, not to any failure of the
retaining wall. The retaining wall was lost as a result of the flood. The policy
clearly states that the house is covered for flood damage. The flood has
compromised the stability of the house.
and
I would assume that if we had cover for flood damage that any damage caused by
flooding would be covered, especially if the damage has a high probability of
causing subsidence and damage to the house foundations…
The complainant strenuously disagrees with SC’s conclusions. He says:
Determination | Case number: 912547 Page 4 of 6
the storm was severe and caused flooding across the region
the retaining wall was cemented in, not dry stacked
the retaining wall had withstood many previous weather events
given the extent of damage to the wall and the backyard, it would not have been possible
for SC to determine what drainage had been in place
SC’s measurements of the width of the retaining wall’s base were incorrect
‘If there was no flood on 7 April 2022, there would be no damage to [the] property and the
house would be safe and secure to live in’.
The complainant has provided photos and a video recording of the storm, the flooded creek
and the external damage to the property. He has also provided extracts from media reports
on the severity of the storm and its impact on the region.
Insurer is entitled to partially deny the claim
The ‘Storm, rainwater and flood’ insured event clearly excludes cover for damage to
plants/lawns or retaining walls. Therefore, even if the complainant is correct in asserting that
the proximate (dominant) cause of the damage to the backyard and to the retaining was the
storm/flood, the insurer is entitled to deny coverage for that damage.
The only expert commentary on the cause of the internal damage to the home is set out in
SC’s report. SC unequivocally states that the internal damage was unrelated to the landslip
caused by the storm but was consistent with long-term expansion and contraction (general
building movement).
Further, the complainant has not provided any detailed submissions concerning the internal
damage.
In the circumstances, the panel is not satisfied that the storm caused the internal damage. On
the exchanged information, it is more likely than not the internal damage was from causes the
subject of the general exclusions the insurer has relied upon.
The insurer is therefore entitled to partially deny the claim.
2.2 Is the insurer’s cash settlement offer reasonable ?
No. A cash settlement must be based on a reasonable quote for repairs, actionable by a retail
customer. A contingencies uplift is then to be added to the quoted amount. The panel is not
satisfied that the quote the insurer relies on is reasonable, and it has not allowed an uplift.
Insurer has offered a cash settlement
The insurer has offered to pay the complainant $10,518.05 as a cash settlement of the cost to
repair (replace) the fencing and rear staircase. The offer reflects the amount JL quoted in a
scope of works (SOW). The SOW is undated but appears to have been prepared by JL in
June 2022, along with its report following inspection of the property on 31 May 2022.
JL’s SOW includes a notation:
The following needs to be completed as maintenance repairs before works can commence.
Mass stone retaining wall to rear property requires replacement and backfilling to level rear
yard. Budget Estimate: $150,000.00.
Determination | Case number: 912547 Page 5 of 6
Cash settlement offer is unreasonable
The panel accepts that it is reasonable for the insurer to cash settle the covered aspects of
the claim. This is because there is a significant amount of excluded damage present that will
need to be attended to before claim-related repairs can be undertaken.
A cash settlement must be based on a reasonable quote for repairs, actionable by a retail
customer. An uplift is then to be applied to the quoted amount to allow for contingencies and
the loss of the lifetime guarantee that applies to insurer approved repairs.
The panel is not satisfied that the insurer’s cash settlement offer is reasonable because:
JL’s SOW/quote does not include a builder’s margin or any financial amount for required
insurance. It is therefore unlikely to be actionable by a retail customer
JL’s SOW/quote appears to be approximately 12 month s old so it will not reflect current
prices for labour and materials
The insurer has not applied a contingencies uplift.
Accordingly, if the complainant accepts this determination, the insurer is required to:
within 14 days, engage a builder not previously involved in the claim to prepare a SOW
that adequately accounts for claim related repairs, and an actionable retail quote based on
current prices
within 14 days of receiving the builder’s SOW/quote, pay the complainant the quoted
amount plus a 15% uplift, less the policy excess.
2.3 Why is the outcome fair?
The policy does not cover storm damage to retaining walls and landscaping. On balance, the
internal damage was not due to the storm but was from excluded causes. It would therefore
be unfair to require the insurer to cover the disputed damage. Howev er, the insurer’s cash
settlement offer is inadequate, so it is fair that the offer is increased.
Determination | Case number: 912547 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.