Dispute over the cash settlement amount for storm damage to the insured building and denial of loss of rent cover
Text of the determination
Determination
Case number 912385
Financial firm Allianz Australia Insurance Limited
Determination | Case number: 912385 Page 1 of 10
Case number: 912385 26 October 2023
1 Determination overview
1.1 Complaint
The complainant holds a home building and contents policy (policy) with the financial firm
(insurer). On 9 March 2022, a claim was lodged for storm damage to the insured building and
contents during a significant weather event on 28 February 2022.
The insurer has accepted the claim. T he complainant is dissatisfied with the insurer’s final
claim settlement offer of $43,516.92 for the building damage. The complainant is seeking
$213,352.80 which includes her preferred build er’s ES’s quote ($151,932), claim for loss of
rent and other out of pocket expenses.
The insurer says its claim settlement offer for the building damage represents its liability
under the policy. The insurer says there is no cover for loss of rent (LOR) and that the ES
quote is excessive and includes works not covered under the policy.
1.2 Issues and key findings
Is the insurer’s assessment of its liability under the policy fair?
No. The insurer’s settlement offer based on the repair quote from builder ‘J’ is not fair . The
insurer is to increase the level of indemnity being offered under the policy in line with this
determination. The complainant is not entitled to cover for the claimed LOR in line with the
policy provisions.
Is the complainant entitled to non-financial loss compensation (NFL)?
Yes. The insurer is to pay the complainant $2,000 in NFL in line with the AFCA Rules.
Why is the outcome fair?
The outcome is fair because neither party has provided a fair and persuasive repair quote for
the damage to the insured building. It is fair that the insurer be required to make the
arrangements set out in this determination to establish its liability under the policy. It is also
fair the complainant receives NFL for her poor experience under the claim.
1.3 Determination
The determination is significantly in the complainant’s favour .
Within 21 days of receiving notice of the complainant’s acceptance of this determination, the
insurer is to:
arrange for two appropriately qualified and licensed consultants to attend the property:
- to complete an assessment of the insured building and provide actionable SOW
and repair quotes
- these assessments to be based on C’s recommended SOW (including the external
damage to render, fascia and eaves) as well as the additional works identified
relating to the presence of asbestos
Determination | Case number: 912385 Page 2 of 10
within 7 days of receiving these SOW’s and quotes, the insurer is to cash settle the
complainant based on the higher of the two repair quotes plus a further 15% uplift to allow
for contingencies and the transfer of risk in arranging repairs
the insurer is to arrange for suitably qualified and licensed consultant to complete a mould
assessment. The insurer is to cover the complainant for any required mould remediation
works identified in this assessment including the issuing of a mould clearance certificate
r eimburse the complainant $550 in line ES’s tax invoice 7 August 2023 and $550 in line
CE’s tax invoice dated 3 August 2023
pay the complainant $2,000 compensation for NFL.
Determination | Case number: 912385 Page 3 of 10
2 Reasons for determination
I note at the time this complainant was brought to AFCA there were several issues in dispute
between the parties. I accept some of these items have since been accepted and/or settled
by the insurer and are no longer in dispute, including the contents damage claim and
replacement of an air-conditioning unit. Consideration of this complaint has been limited to
the issues that remain in dispute between the parties.
2.1 Is the insurer’s assessment of its liability fair?
No. The insurer’s final claim settlement off er based on J building repair quote is not fair in the
circumstances. The insurer is to increase the level of indemnity being offered under the policy
in line with this determination.
The policy is an insured events contract of insurance
The insurer provided the complainant with the relevant policy documentation including the
product disclosure statement (PDS) and certificate of insurance (COI). I accept the insurer is
entitled to rely on the policy provisions to assess its liability under the claim.
The policy covers the insured property against loss or damage caused by one or more of the
listed insured events, including ‘ Storm, cyclone or rainwater or run-off ’. Cover under the policy
is subject to the conditions, limitations and exclusions specified in the PDS.
There is no dispute there exists storm damage to the insured property which triggers cover
under the policy. However, the insurer says the complainant has not shown all the loss and
damage claimed is due to the storm event resulting in the claim. Further, that the policy does
not cover LOR.
Consultants have provided significantly different quotes
The insurer appointed consultants ‘ C ’ to investigate the cause and extent of damage to the
insured property. C attended the property on 7 May 2022 and has provided a report with its
findings, including opinion that it found the insured property to be in a well-maintained
condition.
C has provided a detailed SOW of works based on its assessment confirming significant
water ingress damage to the building and contents. This includes cutting walls to 60cm in
some rooms and up to the ceiling in other areas where asbestos was noted to be present.
However, C did not arrange for a repair quote and instructed the complainant to do so.
The complainant provided a repair quote from ES dated 7 August 2022 of $170,500. The
insurer was not satisfied with this repair quote and arranged for J to provide a SOW and
repair quote. J provided its repair quote dated 7 October 2022 in the amount of $36,264.10.
I note this quote is not an actionable quote for repairs and says it is based on information
received from the insurer and is for alternative settlement (cash settlement) purposes only.
The complainant dissatisfied with the insurer’s cash settlement based on J’s quot e has
sourced a second building repair quote from consultants ‘BB’ dated 12 February 2023 in the
amount of $149,930.
Determination | Case number: 912385 Page 4 of 10
The complainant has also provided a revised repair quote from ES dated 7 August 2023 in
the amount $151,932, which she says is based on her asking to ES to:
exclude - as agreed - the roofing repair to the metal roof
exclude the kitchen - as the cabinetry has been paid for with the contents
increase the gyprock amount as now the asbestos has been confirmed the walls will need
full repatriation not just a cut to 60cm.
increase the cost of both labour and materials as these expenses have increased
significantly since the initial quote of August 2022.
I note the insurer has requested the complainant on several occasions for access to the
insured property, so it could arrange a further assessment, which the complainant did not
permit. The complainant says C told her she only needed to source one building repair quote,
which she has done and has been reluctant to allow the insurer access to the property.
The building repair quotes from both parties are not reasonable
I have considered all the information from the parties. I am satisfied it is reasonable in these
circumstances to accept C’s original assessment and SOW as persuasive and a fair reflection
of the storm related damage to the insured property (provided in section 3.2 below). It is also
fair to accept that subsequent assessments by other consultants have provided some helpful
information establishing additional details relating to the SOW including but not limited to the
presence of asbestos materials and mould within the building.
I accept that the repair quotes from ES and BB appear excessive and include works not
consistent with C’s assessment or storm related damage. I also note there are some repairs
referred to in C’s recommendations which are not present in these building quotes. I am also
satisfied the insurer’s position that these quotes are not in a format that allow it to assess
them to determine whether they are fair and allow it to come to an informed decision on its
liability under the policy. The quotes from BB and ES are not sufficiently detailed, itemised or
sub-divided by room to room.
I acknowledge the complainant’s view that C did not tell her that the repair quote must be in a
certain format and that she was just told to source a single repair quote. This may be the
case, however, I am not satisfied this prevents the insurer from seeking/requesting additional
information from the complainant in support of her claim. I accept this additional information
could be in the form or requesting detailed SOW’s, repair quotes, breakdown of the repair
quotes and the opportunity for the insurer to visit the insured property to source its own SOW
and repair quotes.
C is simply a consultant appointed by the insurer to gather information to allow the insurer to
complete a fair and comprehensive assessment of its liability under the policy. Any advice
from C does not prevent the insurer form choosing to continue its investigations or requests
for additional information.
These decisions rest with the insurer’s assessing and claims departments and it is not
unusual for insurers to appoint multiple consultants to investigate and assess claimed,
especially those with higher levels of damage. I accept the c omplainant’s refusal to co -
operate as well as not allowing the insurer access to the insured property was has been
unreasonable in the circumstances.
Similarly, I am not satisfied it is fair to allow the insurer to base its claim settlement offer for
the building damage on the repair quot e from BB. I am not satisfied BB’s SOW accounts for
all the recommended areas of repairs provided in C’s SOW or additional issues/damage
identified in subsequent assessments by ES, BB, roofing experts ‘P’ and hygienists ‘CE’ etc. I
Determination | Case number: 912385 Page 5 of 10
am not satisfied BB’s SOW and associated quote is consist ent with C’s report for the lounge,
bedroom 1, bathroom and kitchen areas. Further, it does not appear to include the damage in
the garage, external render or repairs to the fascia and eaves damage (main building).
J’s repair quote is not an actionable quote which means J is not prepared to honour this quote
if it were approached to complete the repairs for the stated costs. J says this is due to large
amount of maintenance issues, primarily with the tiled roofing and low-pitched metal roofing,
which contributes to leaks. J says the solar panel array to the main roof is the primary cause
for the roof leaks.
However, J has not provided any persuasive information in support of the alleged
maintenance issues, which is contrary to C’s opinion that the property was in a well -
maintained condition. Further, I note the complainant has provided information from her
appointed consultants, who actually completed physical assessments of the roof, internal
ceiling cavity and other areas. I find this information to be more compelling and inconsistent
with the insurer’s assessment of its liability under the policy.
Accordingly, I am not satisfied the insurer’s final claim settlement offer is fair or that it fulfils its
obligations under the policy. Similarly, the repair quotes from the complainant include works
which have not been shown to be consistent with storm damage nor do they allow for a
reasonable assessment to determine whether they are fair in the circumstances.
Insurer is to accept costs associated with mould, asbestos and eaves damage
I am satisfied the available information shows it is most likely that the storm damage extends
to the fascia eaves on the main building, mould remediation and additional costs associated
with the identification, removal and repairs to asbestos areas.
I am not satisfied the insurer has shown that the damage to the fascia and eaves in question
relate to or arise from any pre-existing maintenance issues with the tiled roof. I accept the
information from ES and roofing consultants ‘P’ support this is storm damage. I am satisfied it
is most likely this damage is the result of the gutter not being able to cope with significant
levels of rainfall during the storm event giving rise to the claim.
Similar, in the absence of persuasive information to the contrary, I accept the information from
the complainant shows the presence of mould within the insured building. I am of the opinion
it is reasonable to accept the appearance of mould is due to the storm event and associated
damage as well as delay caused by the insurer in bring this matter conclusion.
Accordingly, I am satisfied it is fair and consistent with the policy that the insurer be required
to increase its level of cover under the present claim to include the cost to complete these
repairs.
Policy does not cover LOR
The complainant is first required to show, it is more likely than not, that the loss or damage
claimed triggers cover under the policy. I note the complainant’s opinion that the insurer
should be required to cover her for LOR .
The complainant has provided a copy of a 12-month lease agreement for the granny flat
dated 25 February 2022 for the period 7 March 2022 to 20 March 2022. She had entered into
this agreement prior to the date of loss relevant to the claim subject of this complaint.
I accept the complainant had intended to rent out the granny flat and she was in the process
of finalising renovations to the granny flat when the storm event occurred. However, the fact
Determination | Case number: 912385 Page 6 of 10
she had entered into a lease agreement of its own does not mean she is entitled to cover for
the LOR under the policy.
The policy is a home building and contents contract of insurance and does not include any
cover landlord benefits including LOR. I note the complainant says she was not required to
convert the policy to a landlo rd’s contract of insurance until the tenant ha d moved in to the
granny flat.
I do not accept this opinion and am satisfied any entitlement to cover is based on the
provisions of contract in place at the time of loss. Given it was the complainant’s intenti on to
rent out the granny flat and has proceeded to enter into a lease agreement, she should have
ensured she held the appropriate cover to protect her interests from the time the complainant
began taking steps towards leasing out the granny flat. It is not in dispute the complainant did
not have the appropriate cover for losses such as LOR at the time of the storm event.
Therefore, it would be unfair to require the insurer to cover the complainant for the claimed
LOR in these circumstances.
Insurer to settle the claim as set out below
In line with the matters considered above, within 21 days of receiving notice of the
complainant’s acceptance of this determination, the insurer is to:
arrange for two appropriately qualified and licensed consultants to attend the property:
- to complete an assessment of the insured building and provide actionable SOW
and repair quotes
- these assessments to be based on C’s recommended SOW (including the external
damage to render, fascia and eaves) as well as the additional works identified
relating to the presence of asbestos
within 7 days of receiving these SOW’s and quotes, the insurer is to cash settle the
complainant based on the higher of the two repair quotes plus a further 15% uplift to allow
for contingencies and the transfer of risk in arranging repairs
the insurer is to arrange for suitably qualified and licensed consultant to complete a mould
assessment. The insurer is to cover the complainant for any required mould remediation
works identified in this assessment including the issuing of a mould clearance certificate
reimburse the complainant $550 in line ES’s tax invoice 7 August 2023 and $550 in line
CE’s tax invoice dated 3 August 2023.
In the interest of completeness, the complainant is required to co-operate with the insurer to
allow it to fulfil the requirements set out above. This means, the complainant is to permit the
insurer’s appointed consultants reasonable access to the insured building, so that they can
complete assessments, SOW ’s and repair quotes.
2.2 Is the complainant entitled to NFL?
Yes. The insurer is to pay the complainant $2,000 in NFL.
AFCA Rules allow an award of NFL in certain circumstances
The AFCA Rule D 3.3 allows for an award of up to $5,400 for non-financial loss
compensation, if the insurer caused the complainant to suffer an unusual degree or extent of
inconvenience, delay or interference. AFCA takes a conservative approach when considering
any award of compensation.
Determination | Case number: 912385 Page 7 of 10
Insurer is to pay the complainant NFL
I am satisfied it is fair that the insurer be required to pay the complaint $2,000 in NFL. I accept
the insurer’s management of the claim and subsequent complainant has been poor. I accept
the insurer has caused the complainant to experience undue levels of stress, anxiety,
physical inconvenience and delays over the life of the claim.
I note the delays started from the very early stages of the claim. The available information
shows the claim was lodged on 9 March 2022 and it not until around three months later that it
conducted its first assessment of the insured property on 7 May 2022. Further, after this
assessment the insurer, rather than arranging appropriate building consultants to attend and
prepare the required SOW and repair quotes, has placed this responsibility with the
complainant.
There is no information to show the reasons for these delay or failure on the part by the
insurer to arrange the required additional assessments to confirm the needed SOW’s and
repair quotes. I am also of the view that the insurer’s communications and provision of
relevant information to the complainant relating to her concerns regarding advice received
from C, her entitlements and her obligations under the policy were poor and/or ineffective.
I accept it would be unfair to place all liability for delays experience under the claim with the
insurer alone. I accept the complainant has also contributed to these delays because of her
unreasonable position regarding sourcing of appropriate repair quotes and failure to allow the
insurer access to the insured property.
I note despite the insurer coming to decisions and informing the complainant it would cash
settle her for certain actions, out of pocket expenses and/or damaged property. However, the
insurer failed to arrange these cash settlements in a timely fashion which has only further
increased the loss of trust between the parties and subjected the complainant to financial and
emotional stress.
I am satisfied its fair that the insurer be required to pay the complainant NFL within 7 days of
receiving notice of the complainant’s acceptance of this determinatio n.
2.3 Why is the outcome fair?
The outcome is fair because neither party has provided a fair and persuasive SOW and repair
quote for the damage to the insured building. It is fair that the insurer be required to make the
arrangement set out in this determination to establish its liability under the policy. It is also fair
the complainant receives NFL for her poor experience under the claim.
Determination | Case number: 912385 Page 8 of 10
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
3.2 C’s scope of works for storm damage
Granny Flat
Lounge (3.8m x 3.2m x 2.4m )
Remove/replace carpet and pad (Contents)
Remove/replace skirting
Remove /replace doors, windows and trim
Flood cut to ceiling, (asbestos panel)
Remove/replace insulation exterior wall
Replace gyprock
Remove/replace trim
Remove/replace aircon
Paint ceiling, walls, doors, and trim
Bedroom 1 (3.8m x 4.6m x 2.4m)
R em ove/replace carpet and pad (Contents)
Determination | Case number: 912385 Page 9 of 10
Remove/replace skirting
Remove /replace doors and trim
Flood cut to 60cm
R em ove/replace insulation exterior wall
Replace gyprock
Remove /replace trim
Paint ceiling, walls, doors, and trim
Bath (1m x 2m x 2.4m)
Remove/replace tile floor
R em ove/replace wall mount sink
Remove/replace toilet
Remove /replace bath finish hardware
Remove /replace tile shower
Remove/replace door
Flood cut to 60cm
Remove/replace insulation exterior wall
Replace gyprock
Remove /replace trim
Paint ceiling, walls, doors, and trim
Kitchen (2m x 3.Sm x 2.4m)
Kitchen cabinets stored in the granny flat were damaged
Flood cut to 60cm
Determination | Case number: 912385 Page 10 of 10
Replace gyprock
Remove /replace trim
Paint ceiling, walls, and trim
Garage (3.Sm x 6.6m x 3m)
Remove/replace skirting
Flood cut to 60cm
Remove/replace insulation
Replace gyprock
Remove /replace trim
Paint ceiling, wall and trim
General
Strip out
Clean and sanitise wall cavity
Apply antimicrobial to stud walls and flooring
Replace electrical power points and switches
Perform electrical test and correct deficiencies
Clean, post painting