Cash settlement of external flood and storm damage, exclusions relied on, and non-financial loss for claim handling
Text of the determination
Determination
Case number 912287
Financial firm AAI Limited
Determination | Case number: 912287 Page 1 of 13
Case number: 912287 20 October 2023
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (the
insurer). On 28 February 2022, they lodged a claim for flood and storm damage. The insurer
accepted the claim. Extensive repair, replacement and rectification work has since been
carried out at the property. Much of this has been to address internal damage caused by a
co mplete inundation of level one of the complainants‘ home.
The balance of the claim relates to external damage. The parties have been in a protracted
dispute about this aspect of the claim. They now agree that a cash settlement is an
acceptable resolution. However, this has been delayed because the insurer has declined
liability for certain items of external damage which the complainants say should be covered.
In June 2023 the insurer proposed a final cash settlement of $30,669.64. On 17 October 2023
the insurer increased this offer to $39,043.66, having changed its position about liability for
damage to the driveway. The complainant would still like the insurer to increase the cash
settlement amount to cover more of the external damage.
The complainant also says that he and his wife (the co-insured) have suffered stress and
inconvenience due to delays and other factors associated with the ins urer‘s service delivery .
1.2 Issues and key findings
Is the insurer entitled to limit its liability for external property damage?
No. The insurer is not entitled to rely on the exclusions in the policy to deny liability for the
external damage the subject of this complaint, except for replacement of the timber deck.
Is the insurer’s proposed settlement amount appropriate?
No. The insurer must increase the cash settlement as set out section 2.2 of this
determination.
Is the complainant entitled to compensation for non-financial loss?
Yes. The insurer must pay the complainants $2,500 for the poor claim experience and the
stress and inconvenience this has caused.
Why is the outcome fair?
The issues in dispute relate to external damage at the property. The insurer accepts that the
property suffered extensive damage from a major flood event, as well as associated storm
damage. It is fair that the insurer cash settle the balance of the claim, in the amount specified
at section 2.2 of this determination, because the damage reflected in the cash settlement is
covered by the policy and there are no applicable exclusions.
Determination | Case number: 912287 Page 2 of 13
1.3 Determination
This determination is substantially in favour of the complainant.
If the complainant accepts the determination, within 14 days the insurer must, subject to any
excess or other deduction under the terms and conditions of the policy:
cash settle the balance of the claim for a net total of $61,624.00
pay the complainant $2,500 for non-financial loss.
The determination is based on the information available to AFCA as at 18 October 2023. If
the insurer has previously made partial or full payment for any of the items that comprise this
cash settlement, and the insurer has proof of such payment, the insurer and the complainant
must agree on an appropriate adjustment of the cash settlement.
Determination | Case number: 912287 Page 3 of 13
2 Reasons for determination
2.1 Is the insurer entitled to limit its liability for external
property damage?
No. The insurer is not entitled to rely on the exclusions in the policy to deny liability for the
external damage the subject of this complaint, except for replacement of the timber deck.
Policy covers flood and storm damage
The policy covers loss or damage caused by flood and storm, as well as ‗ accidental damage
at home‘ . Accidental damage is defined in the policy as ‗ loss or damage that you did not
intend or expect to happen. ‘
The policy cover for these risks is subject to the terms and conditions (including exclusions
and limitations) specified in the product disclosure statement.
Claim background
The complainant‘s property is close to the Brisbane River. On 28 February 2022, the
complainant lodged a claim for extensive flood and some storm damage that occurred on 25
February 2022. The insurer engaged a builder (AB) to assess the damage. AB inspected the
property on 5 March 2022 and provided a written report on 9 March 2022 (the AB Report). AB
noted that the property was well maintained.
AB found that ‘ flood waters caused extensive damage to the property ’ . AB reported that the
entire lower level of the property was inundated by flood waters and there was also internal
water damage caused by leaking from the upstairs balcony. Externally, there was pool-related
damage, decking damage and cracking to the driveway. Based on the AB Report, the insurer
accepted the claim.
After the claim was accepted, the insurer arranged for a range of trades to quote on the cost
of repairs and remediation. The insurer started the internal building work on 17 May 2022.
The insurer decided to cash settle the external repairs and remediation as it could not
guarantee the repairs. As stated in section 1.1 above, liability for some of the external
damage remains in dispute.
Complainant has established a valid claim
It is not in dispute that the complainant has lodged a valid claim for flood and storm damage.
The insurer accepts this and has already paid out more than $575,000 towards remediation,
repairs and alternative accommodation.
The onus is now on the insurer to show that there remain elements of the claim for external
damage that it can decline due to an exclusion in the policy.
Insurer relied on exclusions to partially deny the claim
The insurer has accepted liability for some of the external damage, such as ‗ the pool
equipment‘. However, the insurer‘s final cash settlem ent offer dated 30 June 2023 denied
liability for the items of external damage addressed below, based on general exclusions in the
policy. Shortly before the issuance of this determination, the insurer reversed its position on
the driveway, which is explained below under the heading ―Driveway resurfacing‖.
Determination | Case number: 912287 Page 4 of 13
Cleaning the water tanks
The policy covers ‗fixed water tanks‘ . The insurer has already accepted liability for new
pumps for the two water tanks at the property.
The AB Report included an allowance for cleaning the water tanks. However, the insurer now
says that although both tanks were submerged during the flood and ‗contaminated‘ , this
element of the claim is declined. The insurer relies for this conclusion on a general exclusion
in the policy for ‗extra costs‘ , which includes ‗ cleaning costs ‘.
I accept that the ‗extra costs‘ exclusion means the insurer is not liable for cleaning costs
following an insured event or following accidental damage. However, in describing what is
covered by ‗loss or damage caused by flood‘, the policy expressly states that ‗the cost of
cleaning your undamaged contents‘ is not covered . This implies that the extra costs exclusion
is not intended to rule out all forms of cleaning in all circumstances.
The water tanks were inundated by floodwater and the insurer concedes they are
contaminated. When considering the policy as a whole, I do not think it is reasonable for the
insurer to rely on the ‗extra costs‘ exclusion to deny the cleaning costs. The cash settlement
specified at section 2.2 below includes allowance for cleaning both of the affected water
tanks.
Deck & patio area
The insurer arranged for EC engineers to comment on the cause and extent of damage to the
rear deck around the pool. EC inspected the property on 29 March 2023. In its report, EC
says:
The outdoor deck was noted to be approximately 15 years old and showed
signs of long-term deterioration to its timber members, connections, and
foundation stum ps. …. Other factors that can contribute to the deterioration of
a deck include poor m aintenance practices such as infrequent cleaning and
sealing, inadequate ventilation, and insect or pest infestation. These factors
can accelerate the degradation of the wood and hasten the onset of issues
such as warping and rotting. …. Based on the results of our investigation, the
available evidence indicates that the condition of the deck is due to long-term
deterioration due to age and exposure to outdoor weather.
The insurer relied on the EC report to invoke two general policy exclusions that it says entitles
it to deny liability where there is:
a home that is not in good condition
the damage was caused by wear, tear and gradual deterioration.
The insurer also emphasises that a claim under the policy must be for an incident in the
nature of ‗a single event‘ .
The experts differ in their opinion about whether the flood caused damage to the deck. EC ‘s
report is based on an inspection that took place more than a year after the flood. EC says
that while there is structural damage to the deck, the flood was not the cause. EC said
‗ [T]he outdoor deck was noted to be approximately 15 years old and showed
signs of long-term deterioration to its timber members, connections, and
founda tion stumps.‘
Determination | Case number: 912287 Page 5 of 13
The AB Report, based on an inspection that occurred less than 10 days after the flood, says
that the rear deck and patio area were completely inundated by flood waters. The AB Report
recommended rectification (not replacement) of the decking by ‗sanding a nd finishing the
timber floor‘.
FEN (emergency specialists) first visited the property on 31 March 2022 as part of the
insurer‘s ‗make safe‘ assessment. In their report dated 21 December 2022 (FEN Report), they
described the timber flooring in the outdoor area as ‗restorable‘. By contrast, the June 2023
scope of works issued on behalf of the complainants by BBG (builders) is based on a full
deck replacement of the rear deck and pool areas, the side deck area and the side covered
patio area.
Deck replacement is not consistent with the conclusions in the EC report nor the
recommendations or conclusions reached by AB and FEN. I am satisfied that the insurer can
rely on the general policy exclusion for wear, tear and gradual deterioration to decline the
claim for structural damage to the rear deck. In its response to AFCA on 17 October 2023, the
insurer said it accepted liability for restoration of the timber decking, and that its payment to
the complainant on 12 April 2022 addresses this external damage. Accordingly, the insurer
has adequately compensated the complainant for this damage.
The patio area adjacent to the pool and timber decking also sustained damage. The FEN
R eport said ‗ [V]isible microbial growth is present on the outside patio ceiling ‘ . Both AB and
BBG have identified the need for fresh painting and plastering. During the claim the insurer
queried how the floodwaters could reach the patio ceiling, but the complainants also rely on
the policy‘s coverage of storm damage. However, the insurer has not demonstrated that there
are exclusions (or other policy provisions) that entitle it to deny liability for the damage to the
patio area. Therefore, it is reasonable to include the following items in the cash settlement
offer.
‗P lastering Services to Rear Deck & Patio ‘
‗P ainting Services to Patio ‘ .
Driveway resurfacing
The insurer‘s final cash settlement offer did not include any allowance for resurfacing the
driveway. The complainants do not seek replacement of the driveway – rather, they seek
remediation of the sealant coating.
Shortly before the issuance of this determination, the insurer reversed its position on the
driveway. The insurer now accepts that the surface damage is covered by the policy and is
willing to include this in the cash settlement.
2.2 Is the insurer’s proposed settlement amount appropriate?
No. The insurer must increase the cash settlement as set out in section 2.2 of this
determination.
Complainant says the cash settlement is unreasonable
There have been a number of specific cash settlements between the parties to address
damage or other claimable loss that has arisen during the course of the works at the property
– for example, the remediation of the garage floor and replacement of carpets and underlay in
one of the bedrooms.
Determination | Case number: 912287 Page 6 of 13
The complainant engaged BBG builders to assist him to independently assess the damage to
the property and advise on appropriate rectification work. The insurer and the complainant
have been negotiating a cash settlement with reference to a scope of works and costings
provided by AB (on behalf of the insurer) as well as those provided by BBG (on behalf of the
complainant). Recently, the complainant has submitted updated BBG costings for financial
year 2023-2024, which have been shared with the insurer.
On 30 June 2023, the insurer offered a cash settlement of $30,669.64 intended to finalise the
outstanding elements of the claim. This was increased to $39,043.66 on 17 October 2023 to
take account of the agreement to cover the resurfacing of the driveway. The complainant
considers that the cash settlement offered by the insurer, even when increased very recently,
does not comprehensively cover the external damage that occurred as a result of the flood
and storm event.
What should the cash settlement cover?
The complainant and the insurer have spent considerable time exchanging views about the
insurer‘s liability for the external damage , the necessary works required to make good that
damage and the reasonable costs of doing those works. I do not consider it helpful to set out
this extended history.
Except where payment has already been made by the insurer (for example, in connection
with the restoration of the decking timber), the cash settlement needs to cover the
outstanding external damage covered by the policy. It has to take into account my decisions
in section 2.1 above about structural damage to the deck, the rectification work in the patio
area, the cleaning of the water tanks, and the insurer‘s agreement on 17 October 2023
regarding the resurfacing of the driveway.
Earlier cash settlement discussion between the insurer and the complainants concerning the
balance of the claim were based on costings that are now out of date. Having reviewed all the
information available to me, I am satisfied that the insurer must cash settle the remainder of
th e claim based on BBG‘s financial year 2023 -2024 costings (where available), as the work
will likely extend through the rest of that period. The BBG‘s scope of works and rates have
previously been shared with the insurer.
The substantive components of the cash settlement will be familiar to both parties. They
include:
an allowance for project supervision
an allowance for BBG‘s insurance obligations
a ‗builder‘s margin‘ of 15%
a contingency uplift of 15%.
The complainant considers that the cash settlement should include a contingency uplift for a
pool pump that has already been replaced and installed. However, contingency for this item
should be met by statutory and manufacturer‘s warranties. For this reason, I am not sat isfied
that it is necessary or appropriate to include a contingency for this item.
More generally, the complainant had sought a higher contingency uplift percentage for the
cash settlement. However, the cash settlement is based on rates and cost projections that
already assume the work required will stretch well into 2023. I consider the contingency uplift
percentage to be fair and reasonable in all the circumstances.
Below is a summary of the cash settlement. The details of the settlement are set out in the
table at section 3.4 of this determination.
Determination | Case number: 912287 Page 7 of 13
Cash settlement summary
Description Amount
Total Amount $ 72,394.23
Contingency upl i ft of 15% $10, 859.13
Total Cas h settlement $ 83,253.36
Amount already paid (or funded) by insurer Less $15,086.57
P aid by insure r 12/4/2022 Less $ 6,542.80
Net a mount payable to the complainant $ 61,624.00
The insurer must cash settle the balance of the claim for a total of $83,253.36, with a net
payment due to the complainant of $61,624.00.
2.3 Is the complainant entitled to compensation for non-
financial loss?
Yes. The insurer must pay the complainant $2,500 for the poor claim experience and the
stress and inconvenience caused.
Complainant raised service delivery issues
The complainant is dissatisfied with the level of service received from the insurer during the
claim assessment and the way the insurer has managed the issue of a final cash settlement.
The complainants say the claim process has taken well over 12 months and that there has
been a high turnover of staff at the insurer handling their claim. They also say the insurer has
changed its position about acceptance of certain items, causing confusion and further delays.
The complainant is keen for resolution of the complaint as it is affecting his mental health. He
says that he and his wife just want to get on with their lives. The complainant says that the
‗ time spent in reading and researching and finding what has been left out or changed has
been immense . ‘
I acknowledge that from the insurer‘s perspective, a lot of work and co -ordination has gone
into the management of this complex claim. Given the amount of building work and other
remediation involved, limitations on the availability of materials and trades, it is inevitable that
the end to end process will take time. Even so, an insured homeowner such as the
complainant is entitled to expect that within reason, the insurer will act efficiently and
effectively to process a claim and manage it to a conclusion.
The insurer says:
Determination | Case number: 912287 Page 8 of 13
… its supplier network experienced unprecedented demand due to the large-scale
weather events and resultant claim volumes and that this delayed the initial
assessment of [the complainants‘] claim. The Insurer further submits that its
response times were also delayed as a result of the higher than usual claim
volumes.
Insurer must pay $2,500 for compensation for non-financial loss
AFCA will only award compensation for non-financial loss where there has been an
unusual amount of physical inconvenience, time taken to resolve a situation, or interference
with the complainant‘s expectation of enjoyment or peace of mind.
Aside from the overall delay, there have been inconsistencies in the approach taken by the
insurer to the management of the claim. One prominent example is that a year after the claim
was first made, the insurer revoked all its earlier offers and concessions in connection with a
final cash settlement. I have also formed the view that there were times during the processing
of the claim when the complainant had to assume responsibility for oversight and
reconciliation of progress, as this was not always forthcoming from the insurer.
In all the circumstances, I am satisfied that the complainant is entitled to $2,500 in
compensation for non-financial loss due to his poor claim experience.
2.4 Why is the outcome fair?
The issues in dispute relate to external damage at the property. The insurer accepts that the
property suffered extensive damage from a major flood event, as well as associated storm
damage. It is fair that the insurer cash settle the balance of the claim, in the amount specified
at section 2.2 of this determination, because the damage reflected in the cash settlement is
covered by the policy and there are no applicable exclusions.
The insurer‘s final assessment confirmed that it accepts the AB Report ‘s description of the
damage at the property. The final assessment also says that the BBG scope of works
supplied by the complainants is ‗ consistent with [flood] event related damages’ .
The cash settlement I have specified is based on the BBG scope of works, except for the
timber decking, which uses a costing provided by a builder, HDR, on behalf of the
complainant. It is fair to include in the cash settlement costings addressing the driveway
damage, the water tank cleaning and the damage to the pool and patio area, as liability for
these is not excluded under the policy.
It is also fair to compensate the complainant for the non-financial loss suffered as a result of
the complex, protracted and sometimes confusing progress of the claim.
Determination | Case number: 912287 Page 9 of 13
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 912287 Page 10 of 13
3.2 Policy terms
Storm
We cover
Loss or damage caused by a storm.
We don‘t cover
— loss or damage caused by flood;
— loss or damage caused by actions or movements of the sea or storm
surge;
— loss or damage caused by erosion, vibration, subsidence, landslip,
landslide, mudslide, collapse, shrinkage or any other earth movement,
but we will cover loss or damage caused by a landslide or subsidence
proved to have occurred within 72 hours of, and directly because of, a
storm and not because of erosion, structural fault or design fault;
— loss or damage to retaining walls, sea walls, revetments, garden borders
and free-standing outdoor walls;
— resultant cracking to sealed paths, sealed roads and sealed driveways,
but we will cover them if they are washed away by the storm;
— loss or damage to a sporting surface or court including a tennis court,
squash court or multi-court surface;
— loss or damage to boat jetties, pontoons, mooring poles and their
attachments and accessories, including if they are washed away by the
storm;
— damage to external paintwork of the home, if that is the only home
damage caused by the storm;
— loss or damage to gates, fences or wall fences that would be considered
by a reasonable person to be in an obvious state of disrepair before the
loss or damage occurred;
— the cost of cleaning your undamaged contents.
Flood
We cover
Loss or damage caused by flood.
We don‘t cover
— loss or damage caused by actions or movements of the sea or storm
surge;
— loss or damage to retaining walls, sea walls, revetments, garden borders
and free-standing outdoor walls;
— resultant cracking to sealed paths, sealed roads and sealed driveways,
but we will cover them if they are washed away by the flood;
— loss or damage to a sporting surface or court including a tennis court,
squash court or multi-court surface;
Determination | Case number: 912287 Page 11 of 13
— loss or damage to boat jetties, pontoons, mooring poles and their
attachments and accessories, including if they are washed away by the
flood;
— damage to external paintwork of the home, if that is the only home
damage caused by the flood;
— loss or damage to gates, fences or wall fences that would be considered
by a reasonable person to be in an obvious state of disrepair before the
loss or damage occurred;
— loss or damage caused by erosion, vibration, subsidence, landslip,
landslide, mudslide, collapse, shrinkage or any other earth movement,
but we will cover damage caused by a landslide or subsidence proved to
have occurred within 72 hours of, and directly because of, flood and not
because of erosion, structural fault or design fault;
— the cost of cleaning your undamaged contents.
3.3 Expert Reports
Date Action
0 9 /03/ 2022
Insurer‘s Builder (AB) Report
Entire bottom level of the property has been affected by flood
The wall linings are holding high moisture up to 300 mm high
around the property and half height strip is required in order to
return the property back to prevent condition. The tiled patios on
level 2 have also both leaked causing damage to the bedroom 1
carpet and ceilings below.
‗ Primary causation: Flood ‘
‗ Is the damage consistent with the claimed event? In my
professional opinion the damage is consistent with the event.
Flood waters have caused extensive damage to the property. ‘
The resultant damage included:
> external damage - back deck, external repairs front elevation,
external repairs left side elevation, pool, bedroom 1, dining
room, entry, garage and all internal areas (ground floor)
31/03/ 2023
Insurer‘s engineer report (EC)
on the timber deck
The deck is a timber framed structure on a combination of steel
and timber stumps approximately 500mm high
S light warping of planks was evident
Some steel stumps were noted to have oxidisation around their
base indicating long term ex posure to ground moist ure.
S ome of the joists showed signs of splitting/separation indicative
of the nail fixings expanding due to oxidation, also a sign of long -
term exposure to moisture
The steps were observed to have timber rot at their ends
indicating long term deterioratio n.
The measurements taken during the inspection d id not show any
signs of significant settlement or movement of the deck or its
foundations.
Determination | Case number: 912287 Page 12 of 13
Based on the results of our investigation, the available evidence
indicates that the condition of the deck is due t o long - t erm
deterioration due to age and exposure to outdoor weat her.
3.4 Cash settlement details
Description Amount (excl. GST)
Epoxy coatings (Garage) $6, 120.66 1
Epoxy coatings (Driveway) $6 , 120.40 2
Hydraulic Services - w ater tank pumps (2) $3,780.00 3
Sand and finish timber decking (HDR quote) $ 5.948.00 4
Carpentry service to patio and gate $5,123.79 5
Electrical to Rear Deck Area Patio $1,286.25 6
Plastering to rear deck & patio $5,140.46 7
Painting to patio $ 1,463.58 8
New external power outlet $268.90 9
Hydraulic Cleaning Services - Water tank cleaning
(2)
$1,732.50 10
Pool fence g lazing $3.034.46 11
Removal and replacement of tiles at front of house $2,850.00 12
Rendering and repainting front boundary wall $1,295.00 13
Bedroom 1 - Removalists & Floor Coverings $7,594.40 14
1 Paid by insurer as an offset of rental bond money retained by the complainants.
2 BBG revised quote – rate applicable for FY 23-24
3 BBG revised quote – rate applicable for FY 23-24
4 AB liability quote dated 11 May 2022.
5 Cost approved by insurer on 1 June 2023 based on BBG FY 23-24
6 Cost approved by insurer on 1 June 2023 based on BBG FY 23-24
7 BBG revised quote – rate applicable for FY 23-24
8 BBG revised quote – rate applicable for FY 23-24
9 Approved by the insurer on 1 June 2023.
10 BBG revised quote – rate applicable for FY 23-244
11 BBG revised quote – rate applicable for FY 23-24
12 Insurer accepted liability on 15/5/2023
13 Insurer accepted liability on 15/04/2023
14 ‗Paid‘ by insurer as an offset of rental bond money retained by the complainants.
Determination | Case number: 912287 Page 13 of 13
External repairs to the left side elevation 15 $948.50
Subtotal $52,706.90
Builder’s margin of 15% $7,906.03
Builder’s warranty insurance $1,800.00
Project supervi sion $3,400.00
Total (excl . GST) $65,812.94
Total ( incl . GST ) $72,394.23
15 AB liability quote dated 19 May 2023
Determination | Case number: 912287 Page 1 of 1