Home / IAG / Determination 912265

Determination 912265

Dispute over cash settlement amount to repair water damage from burst pipe, and compensation for claim handling

FirmIAG
Decided2023-08-17
ProductGeneral Insurance · Landlord
OutcomeFor the complainant
Amount awarded$109,855
Non-financial loss$2,000
Amount claimed—
SourceAFCA PDF

Summary

A landlord's rental property was flooded by a burst irrigation pipe and the insurer accepted the claim but disputed repair costs. AFCA ordered a cash settlement of $94,854.96, $15,000 loss of rent and $2,000 non-financial loss compensation.

The damage fell within the policy, the insurer's builders could not warrant repairs so cash settlement was fair based on the best quote with a contingency, and prolonged poor claim handling warranted non-financial loss compensation.

Issues

Subjects and remedies

home or building damagepay claimpay non financial loss

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 912265 Financial firm Insurance Australia Limited Determination | Case number: 912265 Page 1 of 6 Case number: 912265 11 August 2023 1 Determination overview 1.1 Complaint The complainant holds a rural plan insurance policy with the financial firm (insurer). On 31 December 2018 the complainant lodged a claim after a burst pipe caused water to inundate his rental property. The insurer accepted the claim, but a dispute has arisen between the parties over the cost to repair the damage. The complainant also seeks compensation due to the claims handling experience. 1.1 Issues and key findings What is the appropriate cash settlement amount? The insurer should cash settle the complainant $94,854.96 to repair the damage. The insurer should also pay $15,000 for loss of rent, as agreed between the parties. Is the complainant entitled to compensation? Yes. The complainant is entitled to $2,000 compensation for non-financial loss. Why is the outcome fair? The insurer is liable for the damage caused to the complainant’s property because the damage claimed falls within the terms and conditions of the policy. Given that there is other damage at the property, the insurer’s builders cannot warrant the repairs. On that basis, the complainant is to be cash settled. The property is located in a regional area. Any cash settlement needs to be based on quotes that are actionable for the complainant to complete the repairs. Although several quotes have been provided, on the available evidence, it is fair that the complainant be paid $94,854.96. This is the best assessment of the cost to repair the property and allows a contingency for the transfer of risk. The insurer is also liable for loss of rent. The parties have agreed that the insurer will pay $15,000 for loss of rent. 1.2 Determination This determination is in favour of the complainant. Within 14 days of the complainant accepting this determination, the insurer is to pay the complainant $111,854.96 (less any applicable excess) made up of:  $94,854.96 (less any applicable excess) for damage,  $15,000 for loss of rent, and  $2,000 in non-financial loss compensation. Determination | Case number: 912265 Page 2 of 6 2 Reasons for determination 2.1 What is the appropriate cash settlement amount? The insurer should cash settle the complainant $94,854.96 to repair the damage. The insurer should also pay $15,000 for loss of rent, as agreed between the parties. Complainant has the onus to establish a valid claim When making a claim, the complainant has the onus of establishing, on the balance of probabilities that he suffered a loss which is covered by his insurance policy. If a claimable loss is established, the onus shifts to the insurer to establish, on the balance of probabilities, the application of any condition or exclusion it relies on to reduce its liability. Policy covers insured events subject to exclusions and conditions The cover provided by the policy is set out in the product disclosure statement (PDS) and the certificate of insurance (COI). There is no dispute the complainant received these documents. The COI shows the complainant’s rental property is covered for ‘standard cover’ with a building sum insured of $223,030. The policy coverage details that ‘ standard cover ’ covers the building for physical loss or damage caused by insured events. Relevant to the accepted claim, the policy provides cover for damage caused by bursting, leaking or overflowing of water, oil or other liquid from a system fixed, attached or connected to a domestic building. In addition, the policy provides cover for loss of rent. It is not in dispute that the complainant has established a valid claim. The dispute in this matter is about the cost of rectification. Circumstances of loss On 31 December 2018 the claim was lodged after an irrigation water supply burst which resulted in the complainant’s rental property becoming inundated with a water. The insurer appointed builder (JP), who first attended on 5 January 2019 and confirmed the property was inundated by the claimed event up to 70-100mm of water. After this, the insurer appointed engineer (IM) who attended on 10 January 2019. IM said:  the damage claimed was consistent with the leaking irrigation pipe inundating the property.  further investigation of the timber floor construction and soil testing was required because any repairs that occurred while the reactive clay soil was still saturated were likely to fail.  it would not be possible to guarantee the longevity of the timber floor replacement given the inadequate sub-floor ventilation.  the dwarf wall construction supporting the timber joists under the store room floor appeared to have deteriorated over time and was not related to the pipe leak.  There is evidence of historical movement to door openings and noted some of this historical movement has likely been exacerbated by the leak. Determination | Case number: 912265 Page 3 of 6 Builder JP again attended on 1 March 2019 after having its plumber attend. JP concluded the resultant damage from the leak included the carpets, flooded septic system, asbestos cladding and cupped timber floorings. A detailed scope of works was yet to be provided at this time. JP advised at the time of its second report it could not warrant the repairs due to the floors and walls having dropped at the centre of the house. On 28 April 2019, IM provided a detailed scope of works (SOW) with a room by room break down of the damage caused directly by the leaking pipe. In response to the SOW builder JP provided a quotation and the insurer attempted to settle the claim around this time for $37,400 which the complainant rejected. After this, the insurer arranged engineer (MB) to attend and conduct an assessment. This did not occur until 19 February 2021. MB reported on the significant movement issues at the property and concluded the flooding from the burst pipe was likely a contributing cause of this. MB said that in addition to the items raised in the JP quote, the following should be added:  An increased amount for asbestos removal  An amount to repair the damage to concrete floors in sunroom, bathroom laundry and WC (because the floors have not restored to their original level after the drying out process, as was the hope in IM’s report)  An amount for mould treatment and reinstatement of chemical termite barriers. MB reported that the repairs could not be warranted due to existing maintenance and movement issues at the property. JP provided a flooring quotation based on MB’s SOW to repair the movement issues to the flooring to the sum of $11,761.37. The insurer ’ s policy limits this type of repair to $10,000 - therefore, the insurer is liable up to the maximum of $10,000 for this damage. The consideration will be whether the insurer settled the remainder of the resulting damage. From reviewing the SOW, this quote includes some mould remediation treatment and chemical termite treatment. On that basis, the quote is not limited to ground movement. Following MB’s advice, it appears the insurer made a further offer of $45,795.50 which was rejected and an offer of $56,308.09 was proposed after considerat ion of the complainant’s quotations for carpets and asbestos. This was also rejected by the complainant. In September 2022, the insurer appointed a third engineer for its view on the cause of damage. Engineer (CF) attended and provided an up to date SOW at this time. The insurer in its submission says the complainant did not want to waste time requoting this, therefore it offered a 15% contingency on its prior quotation. The insurer stipulated at this time this was not inclusive of the $10,000 settlement for earth movement related works. Over the course of the complaint, the insurer has appointed five separate experts to assess the damage and provide SOWs. The complainant has been unable to provide quotes in reply. He says this is because of the remote location of the property and the unavailability of trades. Insurer is to increase its settlement offer It is not in dispute that the property is in desperate need of repair and had suffered some pre- existing damage. It is also not in dispute that the insured event has caused further significant damage. Given that this matter has been dragging on for some time, the challenge is working out what the most appropriate quotes are to repair all of the damage caused by the insured event. Determination | Case number: 912265 Page 4 of 6 The most clearly defined quotes were provided by JP for the sum of $38,248.98 for the resulting damage and $11,761.37 for the movement damage. I consider the quotation for $38,248,98 to be the most accurate representation of the costs for works to proceed. However, it did not include the reasonable costs of removal asbestos ($4,895), the replacement carpet quotation ($6,740) and the replacement of the septic system. These were identified by both JP and IM as requiring replacement due to the event at an estimated cost up to $18,000. The quotation for $38,248,98 mentions there may be mould from the insured event and this would result in a variation. Therefore, the insurer is to settle the claim for the above combined totals which comes to $67,883.98. Due to the age of the claim, the original quotations, potential for mould contamination and failure to provide anything but an estimate for the septic tank replacement the insurer is to allow a 25% contingency on this sum ($84,854.96). The insurer is to pay the policy limit for movement damage caused by the leaking pipe on top of this for $10,000. Total building settlement is $94,854.96 less any applicable excess. In addition, the insurer is liable for loss of rent under the policy. Throughout the AFCA complaint process the parties have agreed that the insurer will pay the complainant $15,000 for loss of rent. 2.2 Is the complainant entitled to compensation? Yes. The complainant is entitled to $2,000 compensation for non-financial loss. AFCA can award compensation for poor claim handling Under paragraph D.3.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400) where the insurer’s actions have caused an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with the complaina nt’s expectation of enjoyment or peace of mind. Insurer is liable to pay compensation The complainant says he repeatedly tried to communicate with the insurer who would not listen to him about the size of the property and made him feel like a fool. He also says that his case manager changed and he had to retell his story over and over again. He says the insurer had no appreciation that the property is located in a regional area where the cost of materials is higher and availability of trades is limited. I have reviewed the claim notes and correspondence on the file. The information shows multiple years passed between assessments, the insurer refused to obtain updated quotes based on new SOWs and generally disregarded the complainant’s concerns as being unr easonable. I accept the complainant’s arguments that this caused him considerable stress and inconvenience, outside what would normally be expected during a claims process. On that basis, the insurer is to pay the complainant $2,000 compensation for non-financial loss. Determination | Case number: 912265 Page 5 of 6 2.3 Why is the outcome fair? The insurer is liable for the damage caused to the complainant’s property because the damage claimed falls within the terms and conditions of the policy. Given that there is other damage at the property, the insurer’s builders cannot warrant the repairs. O n that basis, the complainant is to be cash settled. The property is located in a regional area. Any cash settlement needs to be based on quotes that are actionable for the complainant to complete the repairs. Although several quotes have been provided, on the available evidence, it is fair that the complainant be paid $94,854.96. This is the best assessment of the cost to repair the property and allows a contingency for the transfer of risk. The insurer is also liable for loss of rent. The parties have agreed that the insurer will pay $15,000 for loss of rent. Determination | Case number: 912265 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.