The owner of an investment unit claimed for sewer, path and brick wall damage he attributed to a 2016 council water main burst. AFCA found the damage was caused by subsidence not shown to occur within 72 hours of a covered event, so the insurer's decline was upheld.

The policy covers subsidence damage only if it occurs within 72 hours of specified events, and the complainant did not show the damage met this condition.

Issues

Subjects and remedies

home or building damagethird party authorityno remedy

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 912179 Financial firm Insurance Australia Limited Determination | Case number: 912179 Page 2 of 6 Case number: 912179 6 April 2023 1 Determination overview 1.1 Complaint The complainant is an eligible beneficiary under a landlord insurance property underwritten by the financial firm (insurer) for his investment unit. He says on or about 6 June 2016, a council water main burst. This caused a large sink hole to develop immediately adjacent to the complai nant’s property. The council agreed to repair a damaged brick wall. On or about 8 March 2020, the complainant says he observed a second sink hole in the street. He says no investigation was undertaken by the council. The complainant subsequently claimed for damage to his home on 12 March 2020. The council denied this claim. The complainant later sought cover from the insurer on 19 November 2021. The insurer accepts there was an escape of liquid which contributed to the damage. However, it denied the claim saying the claimed damage (to the concrete path, sewer connection and bricks) did not occur within 72 hours of the claimed event. The complainant believes the policy should respond to the damage. 1.2 Issues and key findings Is the insurer liable for the claimed loss? No. The experts agree the claimed damage was caused by subsidence of the soil around the home. The policy requires that any claim involving subsidence must occur within 72 hours of certain specific events. The claimed event occurred in 2016 and the exchanged material does not show this was the case. Therefore, the policy does not respond to the claimed loss. Why is the outcome fair? For claims involving subsidence, the evidence must show the damage occurred within 72 hours of the claimed event. The complainant says the event occurred in 2016. The exchanged material does not show the damage occurred within 72 hours of this. On balance, it developed more than three years later and likely due to unrelated reasons. It would not be fair in these circumstances to require the insurer to cover the claimed loss. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to take any further action in relation to this claim or the complaint. Determination | Case number: 912179 Page 3 of 6 2 Reasons for determination The complainant (VC) is the co-owner of the insured property, the husband and authorised representative of the insured party (AC). Reference to ‘the complainant’ in this determination includes both, unless indicated otherwise. 2.1 Is the insurer liable for the claimed loss? No. The experts agree the claimed damage was caused by subsidence of the soil around the home. The policy requires that any claim involving subsidence must occur within 72 hours of certain specific events. The claimed event occurred in 2016 and the exchanged material does not show this was the case. Therefore, the policy does not respond to the claimed loss. Complainant says burst council pipe caused damage to unit The complainant owns a unit, constructed in or about 1982. He has owned the building for about 30 years. He says the water main burst on 6 June 2016 and caused a sinkhole adjacent to the rear of the property. Believing the local council to be responsible, the complainant sought cover from it for damage to his rear brick fence. After a review, the council agreed to cover the cost to replace the fence, subject to the complainant agreeing to sign a deed of release for $14,430. The complainant complied, and the repairs were completed on or about 30 May 2018. On 8 March 2020, the complainant reported there were new sinkholes at the end of his street. He raised this again with the council, although he says it declined to investigate further. Four days later, he reported the claimed damage. He engaged plumber LP to inspect the sewer line. LP said there was subsidence surrounding the ground along the sewer line. The complainant says the council refused to cover this damage. After exhausting his efforts to claim from the council, the complainant lodged a claim with the insurer on 19 November 2021. The claimed damage sought from the insurer includes:  the concrete path adjacent to the unit, which cracked and pulled away from the wall  the sewer connection in the bathroom wall, which was sheared in two, and  the east and west brick walls of the unit, which cracked due to the settlement. The complainant believes the damage was caused by the burst water main on 6 June 2016. He says because of this, water began flowing along the stormwater easement running east- west along the north side of the property. This caused ground movement and settlement, which in turn led to the damage to the sewer line, concrete path and brick walls. Experts confirm there is damage to the home The complainant provided a report from plumber LP dated 24 March 2020. LP inspected the sewer pipes with CCTV and found a broken junction on the toilet line. LP wrote that it believed the: broken junction had sheared due to pressure being induced by ground movement. The gap in the junction at the shear location appears similar to the gap distance in the footpath movement away from the brick wall. We believe this break could only have been caused by surrounding ground subsidence which appears to have affected the entire length of sewer line and will most likely continue to cause Determination | Case number: 912179 Page 4 of 6 further stress and damage to pipework and fittings, possibly also including but not limited to kitchen and laundry branch lines. The insurer appointed structural engineer CE to review the damage. CE found a gap between the home and the concrete path along the northern elevation (adjacent to the easement on the property). CE says water leaks from the stormwater line was not the cause of this damage. A similar gap is present between the concrete path and the western wall, which is not close to the stormwater line. CE says the claimed damage is not related to the council drain. It says the concrete slab around the perimeter of the home has no caulking. The area is vulnerable to drying and wetting. CE says the cracks in the bricks are from brick expansion. This occurs due to the bricks retaining moisture and through the absence of vertical control joints. CE concluded:  the concrete path moved due to inadequate caulking and sealing of the join, and inadequate compaction of the subgrade  the brick cracking is due to expansion of the bricks due to a lack of vertical control joints. The council reportedly had experts review and submit reports in relation to the damage from the 2016 event. The complainant cited excerpts from these reports, however no copy of the documents was made available for AFCA or the insurer to review. In the circumstances, I have given no weight to this information as it would not be fair to rely on excerpts alone. Policy covers accidental damage subject to terms and conditions The insurer’s policy is made up of the Renewal Schedule and the Product Disclosure Statement (PDS). There is no dispute the insurer sent these documents to the complainant. The 2019 PDS (applicable at the time of the claim being lodged) provides accidental damage cover. It says: We will cover your buildings and contents for any accidental damage or accidental loss including that caused by:  landslide or subsidence but only if it occurs within 72 hours after one of the following: o storm, flood, rainwater or wind o earthquake o liquid that escapes from a fixed pipe or something attached to a pipe, fixed gutter, fixed tank or a drain. This cover also applies to gates, fences or retaining walls that are attached to, and are part of, the structure of the buildings . Noting the complainant seeks to claim for an event he says occurred in 2016, I obtained a copy of the PDS applicable at this time for comparison (2014 PDS). This document provides the same cover, although it is expanded to include an ‘explosion’ amongst the events it considers for landslide coverage. The policy provides accidental loss or damage cover but imposes conditions where such a loss is due to landslide or subsidence. The parties accept the damage was due to subsidence. Therefore, I am satisfied the evidence must show the loss occurred within 72 hours of the claimed event to be covered. Determination | Case number: 912179 Page 5 of 6 The complainant says the claimed damage was caused by the escape of liquid in 2016. To be covered, I must be satisfied this damage occurred within 72 hours of the escape of liquid. No mention was made of this damage at the time the complainant sought cover from the council for his damaged fence. If any sign of the claimed damage was present at that time, I expect a claim would have been made. The complainant signed a release when accepting settlement from the council and I consider it is unlikely he would have done this if he had doubts about the extent of damage. There is nothing persuasive in the exchanged material to show the claimed damage occurred in or about 2016, let alone within three days of the escape of liquid event. The complainant notes he and his wife do not reside in the units. They only become aware of damage when it was reported. I acknowledge this, however there was a considerable period between the original report of damage (2016) and the discovery of the claimed damage (2020). I also considered whether the claimed loss might have occurred within three days of 8 March 2020 (when the complainant observed the second sink hole). There is no evidence provided to show this damage occurred within that time frame due to any of the specific events the insurer covers. As this is required for the complainant to be covered for subsidence damage, I am not satisfied the policy responds. Insurer is not required to cover the claimed loss Whilst the policy covers accidental loss or damage, for claims involving landslide or subsidence it must be shown this occurred within 72 hours of certain events. Here, the relevant event was liquid that escaped from a fixed pipe in 2016. For the reasons stated above, I do not accept the claimed damage occurred in 2016. The available evidence says it manifested in or about 2020, nearly four years after the event. Therefore, even if I accept the loss was due to the escape of liquid, I do not accept the claimed damage occurred within 72 hours. The insurer says the damage to the sewerage pipe and the movement experienced at the complainant’s property has been occurring over ‘a period of years’. The complainant reported secondary sink holes developing in 2020, although the complainant does not suggest this caused the claimed damage. Even if he did, he has not shown how this claimed damage developed from the 2020 event. There was no evidence of a secondary escape of liquid which accompanied the 2020 event and no reason to believe this caused the claimed damage. Given this, I am satisfied the complainant is unable to discharge his onus to show the policy responds to the claimed loss. The complainant also submits the council should be liable for the loss but says it relies on the signed deed of release as a reason to not pay for the damage. AFCA has no jurisdiction in relation to the council and I cannot comment on whether it is liable or not. However, I consider this has no bearing on the insurer’s liability. The claim before me is a matter of whether the insurer is liable for the loss. I am satisfied the policy does not respond. Determination | Case number: 912179 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.