Home / Suncorp Group / Determination 910375

Determination 910375

Insurer refused to repair pool fence under lifetime repair guarantee and denied storm claim

FirmSuncorp Group
Decided2023-02-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant sought repair of a pool fence under the insurer's lifetime repair guarantee after a 2020 storm lean, saying earlier 2007 repairs were defective. AFCA found the prior repairs were not shown to be defective and the storm damage affected a retaining wall excluded from cover, so the insurer was not liable.

The lifetime guarantee applies only if the original work was defective, which was not shown, and the storm cover excludes retaining walls, which the lower fence section is.

Issues

Subjects and remedies

no remedy

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 910375 Financial firm AAI Limited Determination | Case number: 910375 Page 2 of 6 Case number: 910375 22 February 2023 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy underwritten by the financial firm (insurer). He lodged a claim on or about 11 April 2020 for damage to a pool fence, constructed of bricks and timber palings. The pool fence had previously been the subject of a claim with the insurer in 2006. The insurer repaired part of it in early 2007. The complainant notes the fence started to lean after a storm in 2020. He seeks cover under the lifetime repair guarantee provided by the insurer. He says the pool fence is failing and the insurer should be required to repair or replace it. The insurer has denied the claim. It says the work undertaken previously does not relate to the cause of the issues now and there is no evidence its work was defective or otherwise requires rectification. It also says there is no event in the policy to account for the loss. 1.2 Issues and key findings Is the insurer required to reinstate the pool fence? No. The exchanged information does not show there was a defect with the work conducted previously by the insurer. There is no need for the damage to be covered by the lifetime repair guarantee. There is also no persuasive evidence the damage was caused by an event the insurer is required to cover. Why is the outcome fair? The exchanged information shows the prior repair work was limited to the brick piers and palings of the pool fence, not the foundations. The expert evidence shows the foundations have now failed due to hydrostatic pressure over time. It would not be fair to require the insurer to cover this under the lifetime guarantee as the issues do not relate to its previous work. The damage is also not consistent with a covered event under the policy. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to repair the damaged pool fence or take any further action in relation to this complaint. Determination | Case number: 910375 Page 3 of 6 2 Reasons for determination 2.1 Is the insurer required to reinstate the pool fence? No. The exchanged information does not show there was a defect with the work conducted previously by the insurer. There is no need for the damage to be covered by the lifetime repair guarantee. There is also no persuasive evidence the damage was caused by an event the insurer is required to cover. Complainant seeks co ver pursuant to the insurer’s lifetime guarantee The damaged pool fence is constructed of brick piers with timber palings. It stands about 1.8m above ground and serves as part of the border for the pool. The upper part of the fence is not retaining any soil, although its foundations run underground and perform this function. It is not in dispute:  the complainant made a successful claim for damage to the pool fence in late 2006  parts of the fence fell or were damaged in high winds  repairs were conducted by a repairer nominated by the insurer in early 2007  the repairer replaced the brick piers and timber palings of the pool fence, but the insurer says it did not review or work on the foundations  the repairs were subject to a lifetime repair guarantee under the terms of the insurer’s 2006 policy. The complainant says a storm event led to a lean in the fence in early 2020. He raised this with the insurer in 2022, believing the lean was caused by defective building work undertaken in 2007. The parties agree the pool fence has become unstable. The complainant says the insurer should be liable to rectify this under the terms of the lifetime guarantee. Expert reviews of damage do not show the prior repairs were defective The insurer arranged for internal assessor JO to review the damage on 5 May 2022. JO wrote:  the pool fence is best described as a retaining wall, due to the foundations underground which were used to retain earth  it was ‘leaning’ due to rotation of the retaining wall section because of hydrostatic pressure and a ‘likely design issue with the footings’  there was ‘no rectification issue’ or workmanship issues with the prior repairs. JO confirms the original scope of works was to replace brick piers and timber palings blown over in strong winds. JO notes the lower brick section of the pool fence, about 650mm underground, acts as retaining wall and supports the soil around the pool. The brick piers were built on top of this section to create a fence. Noting the 2007 repairs did not involve the section which retains earth, JO says there is no reason to believe these repairs were defective. Hydrostatic water pressure on the retaining wall section has caused the fence to lean. The pool fence is failing due to the issues with the retaining part of the wall underground. JO says this is due to inadequate design/construction of the retaining wall and the build-up of water pressure behind the wall. As the issues with the pool fence are not due to workmanship in 2007, JO says the insurer is not liable for the damage. Determination | Case number: 910375 Page 4 of 6 Builder KB provided a report dated 20 June 2022. KB found that the base of the fence and brickwork is separating from the pool deck area. It says this is consistent with soft subsoils and saturated materials. Reviewing KB ’s report , JO confirmed the builder in 2007 replaced five brick piers and the timber infill palings. This was the only damage observed at the time. JO says no work was conducted to the retaining wall foundations. The complainant did not obtain any expert evidence about the damage. No cover applicable pursuant to the lifetime guarantee from 2006 The complainant does not deny the 2007 repairs were limited to repairing and replacing the brick piers and palings. However, he believes the 2006 event likely damaged the foundations and the insurer did not adequately investigate this. Based on the exchanged material, there is nothing to show the insurer conducted (or should have conducted) any work to the foundations in 2007. Given the repairs undertaken in 2007 stood for 13 years before the lean developed, I consider it unlikely there were any problems with the foundations in 2006. I expect any underlying issues would have become apparent well before 2020. I accept a storm can damage the brick piers and palings without damaging the foundations. I also acknowledge there is limited information. The insurer was unable to obtain the entire 2006 file after it had been archived. This includes not being able to obtain the original repair invoice or assessing documents. I do not consider it is appropriate to draw an adverse inference against the insurer in relation to this. The insurer is not obliged to keep historical material indefinitely. There is no suggestion any work was conducted to the foundations at that time. There is no evidence provided to show it should have been. To be entitled to cover under a lifetime warranty, the onus rests with the complainant to show the original work failed or was defective. The exchanged material does not show this. Given the exchanged material and noting the complainant provided no evidence of defective work, I am satisfied on the balance of probabilities that the foundations were not damaged in 2006. As the issues cited are based on the apparent failure of these foundations, there is no persuasive evidence the loss was caused by any defective work by the insurer. Whilst the complainant questions why repairs were conducted in 2007 if the foundations were faulty, there is no evidence to show this view was held at the time. JO supplied no evidence to show how the foundations did not comply with the building standards of the time either. The fact that the foundations are failing is not evidence they were improperly constructed (or that the insurer should not have done the work it did). Based on this, I am satisfied there is no persuasive evidence the repairs conducted in 2007 were faulty or require rectification. This means the complainant does not have a claim under the lifetime repair guarantee. The complainant is therefore only entitled to cover if he can show the damage was caused by an event which the policy covers. Determination | Case number: 910375 Page 5 of 6 2020 policy provides cover for listed events subject to terms and conditions The insurer’s policy is made up of the Certificate of Insurance (COI) and the Product Disclosure Statement (PDS). There is no dispute the insurer sent these documents to the complainant. The policy covers damage caused by one of the listed events. It does not provide cover for all damage. The complainant reportedly informed the insurer the damage may be due to a storm which occurred on or about 19 January 2020. Amongst the events the policy covers is ‘storm’ damage. Any cover provided under this section does not extend to loss or damage caused to retaining walls. The term ‘retaining wall’ is defined in the policy as: a wall, which is not part of the building, that holds back or prevents the movement of earth Given the lower foundation part of the fence retains soil, the insurer says the fence itself functions as a retaining wall. I accept this section of the fence serves as a retaining wall. As this is the part the insurer says is damaged, I accept the insurer is not liable for any storm damage which affected it. There are no other listed events in the policy which the complainant identified as potentially being the cause of any damage. Insurer is not liable for the claimed damage I acknowledge there is an issue with the pool fence on the complainant’s property and it requires attention. Based on the exchanged information, the complainant has not shown the damage to this pool fence:  was due to any prior defective work by the insurer in 2007, or  should be covered as a separate insured event in 2020. Given this, I accept the insurer is not liable to indemnify the complainant for the claimed loss. Determination | Case number: 910375 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.