Home / IAG / Determination 910336
Determination 910336
Insurer denied part of an earthquake claim (floors, window, downpipe) as differential ground movement; dispute over cause and cash settlement adequacy
Summary
Complainants' home was damaged by an earthquake; the insurer cash settled part but denied floors, a jamming window and a downpipe. AFCA found the insurer liable for all but the downpipe and required it to review the cash settlement and settle or obtain quotes for the remaining repairs.
On the balance of probabilities the earthquake was the proximate cause of the movement damage, and the insurer did not establish the exclusion or an entitlement to deny, except for the downpipe where no causal link was shown.
Issues
- Claim denial primary · upheld
“The insurer is required to meet the claim for the flooring and internal cracking damage including the jamming window; earthquake is the proximate cause.”
- Claim amount dispute secondary · upheld
“Insurer elected to cash settle, so required to ensure the cash settlement is fair and review it subject to invoices.”
- Inadequate claim investigation secondary · upheld
“I do not find SW persuasive or logical in reaching his conclusions; no substantiation for assertions.”
- Product terms interpretation secondary · not upheld
“The insurer relied on an exclusion quoted from the PDS; AFCA found the policy does not contain this exclusion.”
Subjects and remedies
home or building damagenatural disasterpay claimreassess claim
Text of the determination
Determination
Case number 910336
Financial firm Insurance Australia Limited
Determination | Case number: 910336 Page 1 of 7
Case number: 910336 5 April 2023
1 Determination overview
1.1 Complaint
The complainants lodged a claim with the financial firm (insurer) under their home insurance
policy. This is for the damage sustained to their property following an earthquake.
The insurer accepted the claim and cash settled the complainants for some of the repair cost.
However, denied indemnity for the squeaky floors, jamming window and a down pipe. The
insurer says these areas were not damaged by the earthquake but rather due to the
differential ground movement which is excluded by the policy.
The complainants disagree and say they have restumped the house prior to the earthquake
and all the movement damage is related to the subject event.
1.2 Issues and key findings
Is the insurer liable for the disputed damage?
The insurer is not liable for the down pipe however is required to meet the claim for the
flooring and internal cracking damage including the jamming window. This is because:
on balance, the earthquake is the proximate cause of the damage
the insurer has not established an entitlement to deny the claim.
1.3 Determination
This determination is substantially in favour of the complainant.
The insurer is required to settle the remainder of the claim as outlined in section 2 of the
determination.
Determination | Case number: 910336 Page 2 of 7
2 Reasons for determination
2.1 Is the insurer liable for the disputed damage?
The insurer is not liable for the down pipe however is required to meet the claim for the
flooring and internal cracking damage including the jamming window. This is because:
on balance, the earthquake is the proximate cause of the damage
the insurer has not established an entitlement to deny the claim.
The complainants established a claimable loss subject to exclusions
When making a claim, an insured party has the onus of establishing they suffered a loss for
which their insurance policy provides cover. The insured party must establish this on the
balance of probabilities (i.e. that it is more likely than not).
If a claimable loss is established, the insurer has the onus of establishing, on the balance of
probabilities, the application of any exclusion it relies on to reduce its liability.
The complainants’ policy provides cover for accidental loss or damage to the building. The
insurer does not dispute the complainants have established a claimable loss under the policy.
However, the insurer disputes a number of areas and says the damage is not caused by the
subject earthquake.
The areas in dispute:
a downpipe
floor movement
window jamming
kitchen cabinets.
Given the broad form of cover under the policy, the insurer has the onus to establish the
application of an exclusion or that it is otherwise entitled to deny the claim.
I will address each area separately. I accept the insurer’s liability depe nds on the proximate
cause of the claimed damage. The proximate cause is not necessarily the first or last or the
sole cause of the loss. It is the effective, dominant or operative cause of the loss. If there are
several causes operating at the same time, AFCA will consider each one to determine which
cause set the train of events in motion.
Earthquake did not cause the disconnection of the downpipe
The complainants say this downpipe has been damaged by the earthquake and the
subsequent leak has caused the foundation damage.
The insurer’s engineer (SW) says at the time of his inspection the subject downpipe was still
attached. The exchanged photographs show the subject pipe was intact at the time of the
inspection following the event.
I accept the damage occurred after the earthquake.
The complainants have not provided any persuasive evidence to show a causal link between
the subject earthquake and the disconnected pipe. The insurer has invited the complainants
to lodge a separate claim for the pipe. I accept this is reasonable.
If the complainants lodge a separate claim for the pipe, the insurer is required to assess the
cause and the extent of the damage subject to the policy’s terms and conditions.
Determination | Case number: 910336 Page 3 of 7
On balance, the earthquake caused the movement associated damage
The complainants say they have restumped the property approximately two and a half years
before the earthquake. The complainants contend that the squeaky flooring is caused by the
earthquake. The exchanged evidence shows the flooring issue is limited to the laundry,
kitchen and hallway.
The complainants have provided a report from a builder (TC) who says the floor has dropped
remarkably from the earthquake. The datum shows the floor is out of level ranging from 10
mm to 28 mm. TC notes the subfloor is in good condition and the stumps have been
compromised because of the ground tremor.
I accept the exchanged evidence shows the flooring has dropped. This is not in dispute.
SW says the long-term differential movement between the floorboards and substrate caused
minor gaps resulting in the floor being squeaky. SW says this issue is neither caused nor
exacerbated by the earthquake. SW provided a number of photographs showing the gap
between the floor joists and floor bearers.
SW says that given the location of the property, the earthquake was not capable of causing
structural damage to the property. SW concludes the squeaky floors are caused as a result of
differential footing movement. SW notes the presence of shrubs and vegetation causing the
surface runoff and moisture to progress into the subfloor area triggering the movement.
I do not accept this argument.
Part of the resultant damage accepted by the insurer is cracking damage, I accept cracking
damage is indicative of foundations being compromised. The degree of the cracking can
show the extent of the foundation damage. The insurer accepted there was movement
damage to the external cladding and internal ceilings and wall linings.
The complainants’ property is on stumps and is susceptible to movement.
The exchanged evidence shows the topography of the property is on a slope where the land
is falling towards the northern elevation. I accept the slope would enable water to fall and
drain away from the foundations. Further SW did not show how the vegetation (if any) would
impact the level of water in the presence of this slope.
SW’s main argument is that there is no evidence to show the property was re stumped prior to
the earthquake to rule out any differential movement. The complainants provided a
‘Certificate of Final Inspection’ from a building surveyor (MB) which shows the property was
restumped in 2018.
On balance, the property was relatively level prior to the seismic activity. Further, SW did not
provide any persuasive evidence that the stumps moved between 2018 and 2021 or that
there was any evidence of pre-existing damage.
In the absence of any other information, I accept the gap between the floor boards and the
substrate was caused by the earthquake. This includes the identified squeaky floors.
Window jam caused by the earthquake
The complainants say the earthquake has caused the window in the living room to jam upon
closing or opening.
Determination | Case number: 910336 Page 4 of 7
SW says the ongoing swelling with the living room window timber frames causes the window
jam. However, this pre-existing issue has been exacerbated by the earthquake ground
movement. SW says but for the pre-existing issue, the loss would not have occurred.
SW concludes the jamming (if any) is related to the general building movement and ongoing
foundation reactivity.
I note SW has not provided any evidence to substantiate his assertion. SW asserts the
damage has occurred due to the gradual settlement of the soils and the ongoing differential
movement. SW says the movement caused misalignment within the window framework.
I do not accept this argument.
Firstly, SW says the rear of the property is consistent with soft landscaping immediately
adjacent to the living room, however, he asserts the land is sloping away from the property. I
find SW’s assertion inconclusive.
There is no persuasive evidence to show the water ingress (if any) is causative to the
movement given the noted slope. Simply, the exchanged evidence shows the water and
moisture (if any) fall away from the foundations rather than progressing into the subfloor
causing movement.
Secondly, as outlined above the complainants restumped the property in 2018. SW has not
provided any persuasive evidence to show any pre-existing movement damage from 2018
until 2021.
In the absence of other information, I accept that window jamming is caused by the
earthquake.
No evidence separation between kitchen and wall is not earthquake related
The insurer’s loss adjuster ( AI) noted a separation between the overhead cabinet and the wall
lining. AI attributed the separation to thermal and building movement and is unrelated to the
subject earthquake. I do not accept this argument.
SW says the separation occurred at an inherent weak plane about the joint of two different
building fabrics. SW attributed the damage to thermal and building movement. I note SW and
AI did not provide any substantiation for their assertions.
Neither expert explained as to how this separation is not earthquake related given SW has
accepted similar cracking in other areas of the property. Further, there is no persuasive
evidence to show the basis SW attributed this nature of damage to thermal and ongoing
movement rather than the earthquake.
The insurer is required to meet the disputed damage apart from the downpipe
I have carefully considered the exchanged evidence and the parties’ arguments, I am
satisfied the earthquake was the cause of the damage
I do not find SW persuasive or logical in reaching his conclusions. SW contends there is no
evidence the house was levelled prior to the earthquake. Further, SW argues the movement
damage to the floor is caused by differential ground movement.
As outlined above, the complainants restumped the property in 2018, I accept on balance the
property was relatively levelled prior to the earthquake. Further, SW did not provide any
survey level to establish any movement patterns which the policy may exclude.
Determination | Case number: 910336 Page 5 of 7
SW suggested other factors which might have caused the movement-related damage such as
water ingress into the foundations. I find SW’s conclusion contradictory in that regard. SW
says the topography of the site is on a slope which suggests the water would drain away from
the foundations rather than progress into the foundations.
I accept there is no persuasive evidence the downpipe was damaged in the earthquake given
the damage manifested weeks later after the event. However, I accept the insurer’s position
that the complainants can lodge a separate claim for the downpipe to investigate the cause.
For completion, I will address the main exclusion the insurer seeks to rely on. In its Notice of
Response, the insurer says on page 13 of the Product Disclosure Statement (PDS) excludes:
We will not pay for Your Buildings or Contents which are destroyed, lost or
damaged by:
• erosion, , structural fault or design fault, landslide, subsidence, settling, shrinkage
or expansion of earth, vibration or earth movement, other than loss or damage to
Buildings occurring within 72 hours of and caused by landslide or subsidence, and
as a direct result of one of the following:
– storm including rainwater, hail, snow or wind;
– Flood;
– earthquake or tsunami;
– explosion;
– escape of liquid from a fixed pipe or something attached to a pipe, fixed gutter,
fixed tank apparatus or drain’.
I note the policy does not contain this exclusion. For completion I note, page 13 of the PDS
outlines the loss or damage covered by the policy for landslide and subsidence. I note this is
an insuring clause rather than a policy exclusion.
The exchanged evidence does not establish landslide or subsidence is causative to the
damage. I am satisfied the insurer is liable for the disputed damage apart from the downpipe.
The insurer is required to fairly assess quantum
The complainants say the insurer cash-settled them for repairs of the undisputed internal and
external damage. The complainants say the cash settlement was not adequate to cover all of
the event accepted damage and they had to incur extra costs including the costs of
scaffolding.
Given the insurer elected to cash settle its liability, I consider it required to ensure the cash
settlement is fair in all circumstances. Subject to the complainants providing invoices for the
actual costs incurred, the insurer is required to review its cash settlement to ensure the
complainants are adequately indemnified for the repairs.
Determination | Case number: 910336 Page 6 of 7
TC has provided a quote for the re-levelling of the bearers and joists and the replacement of
the floating floor. It appears the complainants have completed the repairs to the flooring. The
complainants provided a photograph showing the floating floor being stripped.
Subject to the complainants providing an invoice for the completed repairs, the insurer is
required to reimburse the complainants the costs of repairs as outlined in TC’s report.
If the complainants have not repaired the floor damage, the insurer is required to obtain an
actionable quote for the re-levelling of the bearers and joists and the replacement of the
floating floors.
Further, the complainants have provided a quote dated February 2022 from (HP) for the
painting of the property, I note parts of this quote have already been accepted. Further, I note
the quote allows for the repairs of the jammed window. Given the lapse of time, I consider it
reasonable for the insurer obtains an actionable quote for the repairs to the window and
internal repairs.
2.2 Why is the outcome fair?
The policy provides cover for accidental loss or damage. The exchanged evidence shows the
earthquake is the proximate cause of the damage. The complainants say the amount the
insurer settled them for the undisputed damage was not adequate. Further, the quote for the
remaining items is dated.
The insurer is required to exercise its discretion fairly under the policy to ensure the settled
amount adequately covers the damage.
The insurer is required to settle the claim fairly and in line with the policy’s terms and
conditions subject to the complainants providing invoices for the earthquake related repairs .
This includes actionable quotes for the outstanding earthquake related repairs.
Determination | Case number: 910336 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.