Delay in settling property purchase and converting bridging loan to owner occupied loan, with poor communication
Text of the determination
Determination
Case number 909585
Financial firm Bank of Melbourne
Determination | Case number: 909585 Page 1 of 13
Case number: 909585 18 September 2023
1 Determination overview
1.1 Complaint
Mrs W and Mr K (complainants) are co-borrowers and have lending facilities with the financial
firm (bank). These facilities were arranged through a broker and involved the refinancing of
loans from another lender and a new loan provided to finance a purchase of the property on
M road (M property) which the complaints were demolishing and rebuilding a new home.
The complainants say:
the bank caused a delay in settlement of the purchase of the M property
the bank delayed actioning their request to switch the loan secured by the M property from
an owner occupied loan to an investment loan and this impacted on their conversion of a
bridging loan to a new owner occupied loan in a timely way
the bank delayed processing the settlement of the conversion of the bridging loan to the
new owner occupied loan and this caused them additional interest expense
the time taken to process the bridging loan has coincided with changes to interest rates,
which diminished their borrowing capacity and ability to obtain a new construction loan and
enter into a building contract for the M property.
1.2 Issues and key findings
Was the bank responsible for delays in settlement of the M property?
The bank was partially responsible for delays in settlement of the purchase of the M property.
Should the bank pay compensation for its delay on the M property?
The bank has paid some compensation to the complainants for the delay in settlement of the
M property, but additional compensation should be paid. The bank should pay $880 to the
complainants to reimburse them for the default costs they were charged by the vendor.
The complainants did suffer unusual stress and inconvenience during the period from the due
date for settlement of the property until the date settlement occurred because the bank did
not effectively communicate with them despite the complainants attempts. In these
circumstances, the bank should pay compensation of $2,000 for non-financial loss.
Did the bank delay converting the bridging loan to the owner occupied loan?
The bank did not cause the delay in converting the bridging loan to an owner occupied loan
before 15 August 2022. However, the bank did contribute to delays in converting the bridging
loan to an owner occupied loan after 15 August 2022. After this time it acted in a manner that
was not fair in all the circumstances by adopting a process (the requirement for a signed
authority form) which it did not communicate to the broker or the complainants, was not
required by the loan agreement, did not reflect the information the bank had received that
surplus funds were held with another financial firm and so the bank did not facilitate
settlement of the refinancing. There was no effective communication of the required payout
figure to either the broker or the complainants and eventually the complainants transferred an
Determination | Case number: 909585 Page 2 of 13
amount that was an estimate of the likely amount required to be paid by them. The
complainants paid higher bridging loan interest than they would have been required to pay
had the refinancing been efficiently executed.
Should the bank pay compensation for its delay in converting the bridging
loan?
It is fair in all the circumstances for the bank to be responsible for the difference in the interest
paid for the bridging loan and the interest that would have been payable if the owner occupied
loan had been settled on 15 August 2022, instead of 10 October 2022. This amount should
be calculated using the terms set out in the loan agreement for the owner occupied loan
signed on 11 August 2022 and be credited to the complainants’ owner occupied loan account.
Why is the outcome fair?
The outcome is fair in all the circumstances because the bank is required to compensate the
complainants for the losses they incurred from the instances where the bank’s failed to meet
the reasonable expectations of the complainants about settling the property purchase and the
conversion of the bridging loan.
The complainants have also sought compensation for losses which arose from the inability to
execute their broader plan to demolish and rebuild the M property. This plan involved many
steps and it was not prevented by the ban k’s settlement delays. The choices about the
property to be sold, purchased, rented and the type of loans that were sought were choices
made by the complainants as advised by their broker.
The complainants had not obtained the required building quotes and had not applied for, or
obtained, a construction loan before general economic conditions changed.
1.3 Determination
This determination is partially in favour of the complainants.
If the complainants accept this determination within 30 days, the bank must within 14 days
pay compensation to the complainants’ transaction account for the delays of settlement of the
purchase of the M property, as follows
$880 for the complainants’ financial loss for the default costs they incurred , and
$2,000 for the complainants’ non -financial loss
The bank should also calculate the difference in the interest paid for the bridging loan and the
interest that would have been payable if the owner occupied loan had settled on 15 August
2022 instead of 10 October 2022. This amount is to be calculated using the terms set out in
the loan agreement for the owner occupied loan signed on 11 August 2022. The bank must
notify the complainants in writing of the amount and the details of the calculation within 14
days. This amount should also be credited to the complainants’ owner occupied loan account
within 14 days.
If the complainants do not accept this determination, the bank is not required to take any
action.
Determination | Case number: 909585 Page 3 of 13
2 Reasons for determination
2.1 Was the bank responsible for the delays in settlement of
the M property?
The bank was partially responsible for the delays in settlement of the M property.
The delay in settlement of the purchase of the M property was contributed to by
the bank.
The bank gave in principle approval to the loans requested by the complainants in 3 different
letters issued in November 2021. The complainants acted through a broker and it is clear
from the correspondence the broker was closely involved in the structure of these loan
arrangements so new funds were to be borrowed which paid out the previous lender, realised
some of the complainants ’ equity in their properties and provided funds for a new purchase.
The loan approval letters each indicated further steps that need to be taken to finalise the
loans. It is apparent from the material I have seen that these steps were underway. For
example, the bank confirmed by letter dated 31 December 2021 that it had settled the
refinancing of the loan secured by the B property on 30 December 2021.
On 18 December 2021, the complainants signed a contract to purchase the M property. The
contract specified settlement of the purchase was due on 16 February 2022. Settlement did
not occur until 25 February 2022. It is unclear exactly why settlement did not occur on the due
date.
The available information indicates that documentation relating to additional security required
to support the loan for the M property needed to be signed before settlement could occur and
this documentation was not signed until 22 and 23 February 2022. The outgoing lender that
held security over this other property also needed to be ready to discharge its security before
the bank could take security over that property as well as the M property and that did not
occur until 25 February 2022.
The loan agreement between the bank and complainants for the loan that financed the
purchase of the M Property was signed on 23 February 2022. It is usually the case that a
property purchase which is being financed by loan cannot settle unless the formal loan
agreement is in place as lenders require a formal agreement before advancing loan funds.
As the complainants had bought and sold property previously using bank loans, and they had
settled the refinancing of the loan for the B property with the bank on 30 December 2021,
they would have been aware of the need for formal documentation to be signed before a loan
could be advanced by the bank to enable their property purchase to settle.
Whilst I note that until the loan agreement was signed there was not a formal loan contract in
place between the bank and the complainants, the arrangements reflected in the November
2021 in principle approvals were part of a campaign by the bank to attract new borrowers,
including borrowers who were refinancing loans. A cash back of $3,000 was offered to
borrowers who refinanced loans with the bank. The November 2021 letter recognises that
borrowers may act in response to the bank’s representation that approval in principle is
granted, noting that the in principle approval extends for 90 days and amongst other things, a
loan is conditional on the bank receiving a copy of the Contract of Sale of any new property
being acquired that is being offered as part of the security.
Determination | Case number: 909585 Page 4 of 13
In these circumstances, it was reasonable for the complainants to expect the bank to apply
the resources necessary to determine whether it could settle the loan supporting the
purchase of M property and to communicate with them or their broker with a degree of
efficiency. It is apparent this did not happen particularly, in the period after 16 February 2022.
The complainants detail numerous and persistent attempts after 16 February 2022 to speak
with the bank’s settlement and processing teams to arrange settlement as soon as possible.
This is supported by notes of interaction by the broker with the bank teams.
I am satisfied the bank was partially responsible for the delay in settlement of the purchase of
the M property until 25 February 2022.
2.2 Should the bank pay compensation for its delay on the M
property?
The bank has paid some compensation to the complainants for the delay in settlement of the
M property, but additional compensation should be paid.
The bank should pay $880 to the complainants to reimburse them for the default costs they
were charged by the vendor.
The complainants did suffer unusual stress and inconvenience during the period from the due
date for settlement of the property until the date settlement occurred because the bank did
not effectively communicate with them despite the complainants attempts. In these
circumstances, the bank should pay compensation of $2,000 for non-financial loss.
The purpose of any remedy provided by AFCA is to, as nearly as possible:
put the complainants in the position they would have been in if the financial firm had not
made an error or failed to comply with its obligations, or
compensate the complainants for the loss they have suffered due to the financial firm’s
actions.
Before we decide whether to award a remedy, we will consider:
if the financial firm made an error or failed to comply with its obligations to the
complainants, and
if so, what loss the complainants suffered because of the financial firm’s actions .
AFCA can award compensation to remedy financial or non-financial loss caused by a
financial firm’s actions.
The bank has made some payment
The available information shows the bank agreed to cover the cost of penalty interest
resulting from the delayed settlement of the M property. On 1 April 2022 the bank paid the
complainants $3,271.51 to reimburse the complainants for the penalty interest paid to the
vendor of the M property for the delay in settlement.
The statement of adjustments for the settlement of the M property indicates the complainants
were required to pay amounts directly attributable to the delayed settlement of $4,151.51
made up of:
$3,271.51 in penalty interest
$880 in default costs.
It is not clear why the bank did not pay the complainants the $880 default costs given it
accepted its contribution to the delay in settlement meant it ought to have paid all the penalty
Determination | Case number: 909585 Page 5 of 13
interest amount. The bank should pay the complainants the amount of $880 they incurred in
default costs for the delay in settlement of the M property.
The bank declined the cash back offer and then paid it to the complainants
On or around 12 May 2022, the complainants raised a complaint with the bank about it not
paying them the $3,000 cash back offer.
As part of the bank’s response on 8 June 2022, it said the lending:
… does not meet he[sic] criteria for the Cashback Promotional Offer. I
acknowledge that we have ‘refinanced’ your Home Loan... however I confirm the
Cashback Promotional Offer does not apply for Relocation Loans.
The bank goes onto say:
…a s a measure of goodwill to you, and for the long-term banking relationship we
wish to have with you, I am happy to award you the $3,000 promotional payment.
After resolving the complaint by agreeing to pay the ex gratia payment of $3,000 in lieu of the
cash back offer, the bank made the following payments to the complainants’ transaction
account
on 9 June 2022, $3,000 as an ex gratia payment
on 10 June 2022, $3,000 with the notation ‘ Rebate Campaign ’ .
It became apparent in March 2023, when the bank was investigating this complaint, that the
loans did in fact meet the criteria for the cash back offer.
The bank has not required the complainants to refund it one of the $3,000 payments received
on each of 9 and 10 June 2022.The complaint about the cash back offer was resolved by the
bank making one of these payments and is not part of the complaint that I am determining.
In considering this complaint, the bank has suggested the payment of $3,000 for settlement of
the complaint about the cash back offer should be taken into account as part of the payments
made to the complainants for the settlement delay. The information available indicates the
bank determined to make that payment because of its analysis of the circumstances relating
to the cash back offer and not because of any association with the delay in settlement of the
M property. If the bank determines it has made a payment in relation to the cash back offer in
error, then it is open to the bank to deal with the complainants about this item separately.
Determination | Case number: 909585 Page 6 of 13
The complainants suffered loss from the bank’s delay
I am satisfied the complainants incurred a direct financial loss of $4.151.51 from the delay in
settlement of the M property. The bank has paid the complainants $3,271.51 in recognition of
its contribution to the delay. The bank should further compensate the complainants, by
crediting their transaction account, with the $880 incurred in default costs arising from the
delay.
The delay in settling the purchase of M property did cause the complainants stress and
inconvenience. The complainants say this stress and inconvenience should be reflected by
compensation for non-financial loss.
AFCA takes a conservative approach to awarding non-financial loss and expects
compl ainant’s to be moderately robust and to bear the normal degree of inconvenience.
AFCA’s R ules permit a decision maker to decide that there may be compensation for non-
financial loss where there is an ‘unusual degree or extent’ of physical interference, time taken
to resolve or interference with the complainants ’ expectation of peace of mind. There is a limit
on the amount compensation that may be awarded for non-financial loss of $5,400 per claim.
This complaint involves several claims. In relation to the claim that the bank contributed to the
delay in settling the purchase of the M property the maximum amount of non-financial loss
compensation that could be awarded to the complainants is $5,400.
The complainants have described their attempts to deal with the bank about settlement of the
purchase and it is clear their broker was also dealing with the bank to try to arrange
settlement. Even so, there were several key transaction steps that had not happened by 16
February 2022 and did not appear to occur until 23 February 2022, which the complainants
and their broker would have been aware needed to be completed before settlement could
occur. The new loan arrangements the complainants and their broker put in place with the
bank involved a degree of complexity with loans needed to be refinanced, new property
purchased, and additional security provided. Implementation of these arrangements required
close monitoring by not only the bank but the complainants and their broker. The
complainants have described their attempts to call the bank before the settlement date.
However, the material available to me does not reveal an unusual degree of inconvenience
when the required security and loan documentation was not in place by the due date for
settlement.
The complainants did suffer unusual stress and inconvenience during the period of the delay
from the due date of 16 February 2022 to the actual date of settlement on 25 February 2022
because there was no effective communication by the bank with them. The complainants
describe the need to make regular calls with the bank’s settlements team, the processing
team, being referred between these teams, long call wait times, failure of promised call backs
and the need for the broker to escalate the matter within the bank. In these circumstances,
there should be compensation for non-financial loss in relation to the stress and
inconvenience caused by the communication failures by the bank during this period of
$2,000.
Determination | Case number: 909585 Page 7 of 13
2.3 Did the bank delay converting the bridging loan to the
owner occupied loan? The bank did not cause the delay in converting the
bridging loan to an owner occupied loan before 15 August 2022. However, the bank did
contribute to delays in converting the bridging loan to an owner occupied loan after 15 August
2022. After this time it acted in a manner that was not fair in all the circumstances by adopting
a process (the requirement for a signed authority form) which it did not communicate to the
broker or the complainants, was not required by the loan agreement, did not reflect the
information the bank had received that surplus funds were held with another financial firm and
so the bank did not facilitate settlement of the refinancing. There was no effective
communication of the required payout figure to either the broker or the complainants and
eventually the complainants transferred an amount that was an estimate of the likely amount
required to be paid by them. The complainants paid higher bridging loan interest than they
would have been required to pay had the refinancing been efficiently executed.
The complainants’ plans for their properties changed after the time that the initial in principle
approvals were obtained and after their acquisition of the M property. They decided to sell the
B property and retain the E property as their residence, for the time being. The M property
was to be rented out until arrangements could be made to demolish and rebuild it. This meant
the structure of their loans with the bank need to change so the loans reflected whether the
loans were for investment or owner occupied purposes. In addition, the bridging loan secured
by the E property incurred a higher rate of interest than an owner occupied loan, so the
complainants sought to convert the bridging loan to an owner occupied loan.
The bank delayed in processing a switch for an investment loan
Before the complainants could convert the bridging loan to an owner occupied loan, they
needed to switch the loan for the M property from an owner occupied loan to an investment
loan.
The complainants signed a request to switch form on 28 June 2022 and the bank confirmed it
received this request on 4 July 2022. The switch was not attended to until 26 July 2022. The
bank has acknowledged the switch should have been attended to earlier and has indicated
that processing of the switch should have occurred 20 days faster. However, while there was
this delay in processing the switch, it did not end up impacting on the time when the bridging
loan was converted to an owner occupied loan for the reasons set out below.
The assessment of the application of the new owner occupied loan did take
more time than the complainants expected
The complainants completed the application forms for the new owner occupied loan on
9 June 2022 and the bank confirmed it received these forms from the broker on 13 June
2022. The broker reported that the application had been conditionally approved on 5 July
2022. The time between receipt of the application and conditional approval was longer than
the 16 days the broker had told the complainant the bank was generally taking at that time.
There is no information that indicates the bank made any representation to the broker or to
the complainants that this assessment would be completed within a particular time.
The bank has acknowledged there was an issue relating to a duplicate customer record. One
complainant had two profiles with the bank at the time of the application:
an active profile ending 658 which lists current accounts and was used in the assessment
an active profile ending 593 which listed two closed credit accounts.
The presence of duplicate profiles is unhelpful, but the bank has submitted to AFCA that the:
Determination | Case number: 909585 Page 8 of 13
…profiles didn’t cause delays in the application as there were always other
outstanding MIRs with the application which couldn’t progress to formal approval.
Because the application, and active accounts were linked to the profile used in the
assessment, there is no information that a duplicate profile caused the delay.
After conditional approval was granted on 5 July 2022, there were still outstanding missing
information requests. For example, by 1 August 2022 the bank still needed to receive payslips
for the complainants and evidence about the funds held in an account with another financial
firm. This information was provided by the broker to the bank and the loan application was
unconditionally approved by 11 August 2022. The loan documentation was signed and
returned to the bank by 13 August 2022. After this time, the steps necessary to settle the
payout of the bridging loan and advance of the owner occupied loan could have been taken
and the bank says it was ready to execute the refinance after 15 August 2022.
I am satisfied the bank did not cause the delay in converting the the bridging loan to an owner
occupied loan before 15 August 2022.
The bank contributed to the delay in converting the after the documents had
been completed
The bank did not take steps to execute the refinance after 15 August 2022 because it
determined that there would be a gap in the amount to be advanced under the owner
occupied loan and the sum needed to payout the bridging loan.
The bank’s internal records indicate that it decided it could not proceed with this refinancing
until it received a signed authority authorising the bank to debit these funds from the
complainants ’ transaction account. This requirement was not communicated to the
complainants and in any event, the transaction account did not have sufficient funds in it to
cover the amount to be debited.
The complainants’ account was debited with the bridging loan interest amount on 24 August
2022 and this led to the complainants making an enquiry with the bank about why the
conversion had not occurred. The complainants say this was when the need to pay the gap
was first communicated to them and this failure was acknowledged by the bank’s
representative at that time. The bank does not have a record of this conversation, but its
records indicate that on 15 and 29 August 2022, it still showed the completed authority to
debit form as outstanding. The bank has not provided any information that shows the need for
this authority had been communicated to the broker or the complainant. The complainants
lodged this complaint with AFCA on 30 August 2022.
The loan agreement for the owner occupied loan does not stipulate that the provision of a
signed authority is a condition to the loan being advanced. It does require that the loan
amount be used to pay out the bridging loan. It stipulates that the bridging loan must be paid
out in full and that the complainants are responsible to pay any additional amounts necessary
to ensure the bridging loan is paid out in full after considering the loan amount. This
agreement is for a loan of a specified principal and it describes the bridging loan as a loan
which has a stated approximate balance of an amount more than this specified principal. As a
result, the loan agreement clearly contemplates that the complainants would need to
contribute additional funds to payout the bridging loan, but it does not direct that this can only
occur by way of a signed authority over a transaction account with the bank. When settlement
of the refinancing did eventually occur on 10 October 2022, the complainants had funded the
Determination | Case number: 909585 Page 9 of 13
gap amount by payments made from the funds held with another financial firm to the bridging
loan account.
In making my determination I am required to consider what is ‘fair in all the circumstances’
having regard to a range of circumstances set out in AFCA’s R ule A.14.2. This includes
having regard to the Banking Code of Practice (2020) to which the bank is a signatory. Under
clause 10 of the Code the bank agrees to engage with its customers in a fair, reasonable and
ethical manner.
In this situation the bank did not take steps to finalise the refinancing of the bridging loan as
soon as was reasonable. It adopted a process, the requirement for a signed authority form,
which it did not communicate to the broker or the complainant, was not required by the loan
agreement, did not reflect the information the bank had received that surplus funds were held
with another financial firm and did not facilitate settlement of the refinancing. There was no
effective communication of the required payout figure to either the broker or the complainants
and eventually the complainants transferred an amount that was an estimate of the likely
amount required to be paid by them. The complainants paid a higher bridging loan rate of
interest from 16 August until 10 October 2022 than they would have been required to pay had
the refinancing been efficiently executed.
It is fair in all the circumstances for the bank to be responsible for the amount that is
represented by the difference in the interest paid on the bridging loan and interest that would
have been paid on the complainants’ owner occupied loan if it had settled on 15 August 2022
instead of 10 October 2022. This amount should be credited to the complainan ts’ owner
occupied loan account.
2.4 Should the bank pay compensation for its delay in
converting the bridging loan?
The bank should pay compensation for its contribution to the delay in conversion of the
bridging loan.
The complainants paid more interest because of the delay
As described above, the bank did not take steps to finalise the refinancing of the bridging loan
as soon as was reasonable. It adopted a process, the requirement for a signed authority form,
which it did not communicate to the broker or the complainant, was not required by the loan
agreement, did not reflect the information the bank had received that surplus funds were held
with another financial firm and did not facilitate settlement of the refinancing. There was no
effective communication of the required payout figure to either the broker or the complainants
and eventually the complainants transferred an amount that was an estimate of the likely
amount required to be paid by them. The complainants paid a higher bridging loan rate of
interest in the period from 15 August 2022 until 10 October 2022 than they would have been
required to pay had the refinancing been efficiently executed.
It is fair in all the circumstances for the bank to be responsible for the amount that is
represented by the difference in the interest paid on the bridging loan and the interest that
would have been paid on the complainants’ owner occupied loan if it had settled on 15
August 2022 instead of 10 October 2022. This amount should be credited to the complainants’
owner occupied loan account.
I do not have information which allows me to do this calculation. The bridging loan appears to
have had at least two different interest rates applicable during the period from 15 August
Determination | Case number: 909585 Page 10 of 13
2022 to 10 October 2022. The complainants did not have an owner occupied loan advanced
during this time but had a loan agreement in place that entitled them to a rate that was a
specified percentage below the owner occupied standard rate at that time. But it is likely this
rate would have changed over the period from 15 August to 10 October 2022 with changes to
the bank’s variable owner occupied interest rate. The investment loan the complainants held
for the M property appears to have had 4 different interest rates applied to it over this period.
The bank should provide the complainants with the relevant calculation setting out details of
the interest rate that applied on dates during the relevant period for owner occupied loans on
the terms that applied to the complainants in the 11 August 2022 loan agreement.
The bank is not responsible for the complainants ’ loss of opportunity
The complainants say that the bank’s delay caused them to suffer a range of losses including:
the loss of opportunity to obtain a construction loan for the M property that would have
allowed them to enter into a building contract to demolish and rebuild on the land
losses from entering into a short term rental arrangement for the M property
ongoing repair and maintenance and other leasing costs for the M property
costs associated with remaining living in the E property for longer than may have otherwise
be the case
non-financial loss from stress and inconvenience of living with uncertainty about when and
how their plans to commence a building project at M property could be put into effect
The complainants plan after they acquired the M property was to demolish it and rebuild their
home there. The sale of the B property was designed to payout the mortgage on that property
and realise equity so there were more funds available to apply towards building on the M
property. The complainants had numerous initial discussions with building companies about
potential construction designs for a new house on the M property over June to August 2022
and paid a deposit to one of the firms it spoke with to give them the benefit of locking in price
and ability to generate a sales quote. They did not enter into a building contract with any firm.
The broker assessed the complainants ’ borrowing capacity for a new construction loan in
March 2022. In August 2022, the broker assessed the complainant’s borrowing capacity for a
new construction loan at a significantly lower amount. In the period from March 2022 until the
time the bridging loan was refinanced, the bank increased interest rates on numerous times.
Further interest rate increases have occurred after October 2022. These interest rate
changes are reflective of interest rate changes which have impacted the home loan market
generally. Since May 2022, the Reserve Bank of Australia (RBA) has increased its cash rate
target 12 times with 6 of these increases occurring before the bridging loan converted in
October 2022.
The information available shows that in their preliminary discussions with builders, the
complainants were considering construction projects with an indicative price significantly
above that assumed by the broker’s initial assessment of their building costs when he
determined their borrowing capacity. This correspondence with builders indicates building
discussions were at an early stage and there would be considerably more detailed work
required before a building contract could be finalised.
The broker explained to the complainants in March 2022 that a lender would not do a full
approval for a construction loan without a finalised building contract. The broker indicated that
if a builder provided a written quote then they the complainants could obtain a conditional
approval for a construction loan which is subject to a building contract being available. This
conditional approval generally only lasts for 3 months. I have not seen a formal written quote
Determination | Case number: 909585 Page 11 of 13
from a builder. The bank has not received an application from the complainants or their
broker for a construction loan.
The complainants entered into the rental arrangements for M property in March 2022 with a
lease that ended on 30 September 2022 and there was a period of vacancy after that and
costs have since been incurred to ensure the property was compliant with requirements for it
to be tenantable. At the time the complainants made the decision for M property to be rented
until the building could be demolished and rebuilt, they were able to assess the condition of
the property and its likely ongoing maintenance issues.
In all these circumstances, the delays attributable to the bank for the settlement of the M
property and in executing the refinancing of the bridging loan did not cause these broader set
of losses for which the complainants have sought compensation. These losses have arisen
because of a combination of the following
the changes in general economic conditions reflected in the interest rate rises by the RBA
since the settlement of the sale of the B property in May 2022
the complainants’ decisions to purchase M property with a view to rebuild and demolish
when the financing arranged first arranged for the purchase was an owner occupied loan
the complainants’ decision to remain living in the E property when they had refinanced it
using a bridging loan with a view to sell it in the next 12 months
the rentability and maintenance issues of the M property
the cost of building compared to the complainants’ likely available construction loan
capacity before the delays
the timetable for arranging building quotes which would allow the complainants to make an
application for a construction loan
no construction loan had been applied for, even on a conditional basis
I accept the complainants have suffered stress and inconvenience over this period because
they have not been able to demolish and rebuild the M property. This stress and
inconvenience arises because of the factors listed above. Other than the compensation for
non-financial loss in relation to the stress and inconvenience associated with the
communication failures during the delayed settlement of the M property already addressed in
this determination, there is not an error by the bank that led to the circumstances that
prevented the demolition and rebuild of the M property.
2.5 Why is the outcome fair?
The outcome is fair in all the circumstances
The bank has been required to compensate the complainants for the losses they incurred
from the instances where the bank’s fail ed to meet the reasonable expectations of the
complainants about settling transactions.
The complainants have also sought compensation for losses which arose from the inability to
execute their broader plan to demolish and rebuild the M property. This plan involved many
steps and it was not prevented by the bank’s settlement delays. T he choices about the
property to be sold, purchased, rented and the type of loans that were sought were choices
made by the complainants as advised by their broker.
The complainants had not obtained the required building quotes and had not obtained a
construction loan before general economic conditions changed.
The timing of economic changes, which have impacted metrics which lenders use to set
interest rates or serviceability calculations are unfortunate, but these changes are not the
Determination | Case number: 909585 Page 12 of 13
responsibility of the bank. It would be unfair to hold the bank accountable for a serviceability
assessment (or borrowing capacity) in circumstances where it has not received an
application. Even if it did receive an application, a bank is entitled to exercise its commercial
discretion and a construction loan may not have been provided.
Determination | Case number: 909585 Page 13 of 13
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted our
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.