Home / QBE / Determination 909495

Determination 909495

Protracted repairs and rectification, loss of rent, lost house plans, increased electricity costs and non-financial loss

FirmQBE
Decided2023-08-15
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded$583
Non-financial loss$2,500
Amount claimed—
SourceAFCA PDF

Summary

An SMSF corporate trustee's investment property was damaged by an escape of liquid, and repairs were protracted. AFCA rejected loss of rent and lost plans claims but required the insurer to decide outstanding rectification items, pay half the electricity increase ($582.94) and $2,500 non-financial loss.

Loss of rent cover required the property to be tenanted or between tenants and the insurer is not liable for the builder's handling of plans, but the insurer contributed to delay and should share the electricity costs.

Issues

Subjects and remedies

broker or intermediaryhome or building damagesmsfpay claimpay non financial lossreassess claim

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 909495 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 909495 Page 2 of 9 Case number: 909495 4 July 2023 1 Determination overview 1.1 Complaint The complainant is the corporate vehicle through which MT and NT operate their self- managed superannuation fund. It is also the named insured on a home and contents policy issued by the financial firm (insurer), covering an investment property. On 17 October 2019, a claim was lodged for water damage due to an escape of liquid (EOL) from the ensuite cistern. The insurer accepted the claim and attended to repairs. However, the repairs and associated rectification process became protracted and there is still some work yet to be completed. The complainant wants the work to be finalised and seeks cover for loss of rent (LOR). The complainant also holds the insurer liable for the loss of house plans that were in the possession of the insurer’s builder , and for increased electricity costs. Finally, it seeks non- financial loss compensation for stress and inconvenience due to the insurer’s claim handling. 1.2 Issues and key findings Is the complainant entitled to LOR? No. When it was damaged, the property was not tenanted or in between tenants, so the policy requirements for LOR cover have not been met. The insurer is not liable outside the policy. Is the insurer required to make a decision on the rectification issues? Yes. The insurer ’s loss adjuster, SW, has made recommendations on the swivel door, cinema room switch and plant room/storeroom. The insurer is to notify the complainant of its claim decision on those matters. It is to promptly progress resolution of the other remaining issues. Is the insurer liable for the lost house plans? No. It is not clear whether the plans were lost due to an error by t he insurer’s builder . Even if they were, the insurer is not liable for the builder’s conduct to that extent. Is the insurer required to pay for increased electricity costs? Partially. I am satisfied the increased costs were likely due to both the repair works and the complainant’s tenants. The insurer is to pay 50% of the increased costs claimed. Is non-financial loss compensation payable? Yes. The insurer has contributed to the delays experienced, which have caused MT and NT stress and inconvenience. The insurer is to pay $2,500 in non-financial loss compensation. Why is the outcome fair? The outcome is fair as it reflects the respective rights and obligations of the parties under the policy. The outcome also fairly compensates the complainant for the additional losses in relation to which the insurer is reasonably responsible. Determination | Case number: 909495 Page 2 of 9 1.3 Determination This determination is mostly in favour of the insurer. Within 21 days of the complainant providing written acceptance of this determination, the insurer is required to:  if it has not already done so, confirm in writing its coverage decision regarding the swivel door, cinema room switch and plant room/storeroom  pay the complainant $582.94 for the electricity costs  pay the complainant $2,500 in non-financial loss compensation. Determination | Case number: 909495 Page 3 of 9 2 Reasons for determination The complainant is represented by TH, insurance broker. In this determination, MT, NT, the complainant and TH are referred to as the complainant unless context requires otherwise. The parties provided numerous submissions to AFCA. While this determination does not refer to each submission, I have taken them all into account in reaching my decision. 2.1 Is the complainant entitled to LOR? No. When it was damaged, the property was not tenanted or in between tenants, so the policy requirements for LOR cover have not been met. The insurer is not liable outside the policy. Policy covers LOR in certain circumstances The product disclosure statement and policy wording (PDS) sets out on page 51 the following additional benefit covering LOR and temporary accommodation: We pay the following benefit if your home is so damaged by an insured event that it cannot be lived in or let to tenants: Where the home is your principal place of residence we pay up to $20,000 or 20% of the sum insured for your home, whichever is the higher, for: a) loss of rent or rentable value if the home is tenanted or is between tenants at the time the loss or damage occurred, (b) additional cost of:  reasonable temporary accommodation expenses for the period in which you are unable to live in your home,  additional living expenses Policy requirements have not been met It is not in dispute that:  the complainant purchased the property in August 2019, two months prior to the EOL  the complainant purchased the property as an investment, with the intention of leasing it out (there is a suggestion that MT and NT also at least at one stage intended using the property from time to time as a holiday house)  the policy was endorsed to include cover for landlord’s property, fixtures and fittings  at the time the EOL occurred, MT and NT were not living at the insured property  at the time the EOL occurred, the property was not tenanted and was not between tenants  the EOL damaged the property to the extent it could not be lived in or leased for a period. The complainant says the EOL occurred following plumbing work after the property purchase was settled, in preparation for the property being rented out. It says the property was being advertised for leasing at the time of the EOL. Determination | Case number: 909495 Page 4 of 9 The complainant has provided a valuation report dated 30 October 2018 addressed to the property’s previous owner (NP) estimating the property’s rentable value at $2,000/week unfurnished. It has also provided an agreement signed by NP on 1 July 2019, by which he appointed real estate agency XR as managing agent for the purpose of leasing the property. The agreement specified a rental range of $1,500 to $2,000/week. There is no information to show the property was tenanted before its sale to the complainant. The complainant secured a tenant in May 2021 with the tenancy beginning in June 2021, at $2,000/week. The building repairs were completed in October 2020, 12 months after the EOL event. The complainant says they should have only taken six months. It also says the insurer caused the delay between October 2020 and May 2021, when the lease was entered into. The insurer says the complainant is not entitled to LOR because the property:  was not MT and NT’s principal place of residence , as the PDS requires  was not tenanted or in between tenants at the time of the EOL event, as the PDS requires  was not being marketed for rental by the complainant, as XR confirmed to SW  could have been rented from October 2020, as the issues that remained to be dealt with (including replacement of carpet and the sound and DJ systems) did not prevent the property from being tenanted, as shown by the May 2021 lease. The LOR additional benefit refers to the property having to be the insured’s principal place of residence. However, I am not satisfied that provision is consistent with the insurer agreeing to issue the policy as landlord insurance. A more reasonable interpretation is that the residence qualification requirement only applies to the temporary accommodation aspect of the benefit. Nevertheless, I am also not satisfied the complainant is entitled to payment under the LOR additional benefit. The property was not tenanted or in between tenants at the time of the EOL event. Further, on page 53 the PDS specifically excludes LOR if the property has been untenanted for sixty or more consecutive days immediately before the loss, as was the case. I am also not satisfied that the insurer is liable for LOR outside the policy terms. The EOL damage was extensive and there is no persuasive evidence repairs should have been completed more quickly than they were. Also, the property was leased in May 2021 while works still needed to be completed, which suggests the property could have been rented from an earlier date. 2.2 Is the insurer required to make a decision on the rectification issues? Yes. T he insurer’s loss adjuster, SW, has made recommendations on the swivel door, cinema room switch and plant room/storeroom. The insurer is to notify the complainant of its claim decision on those matters. It is to promptly progress resolution of the other remaining issues. Loss adjuster reported on status of rectification in March 2023 The complainant says there are outstanding works and rectification issues. The insurer acknowledges that is the case but says these matters continue to be actively managed. It has provided a copy of SW’s report dated 9 March 2023. SW confirmed it had Determination | Case number: 909495 Page 5 of 9 recently attended two meetings on site with the adult son of MT and NT, the insurer’s builders (ML and CS), and plastics manufacturer BC. SW provided the following comments on the remaining works/rectification issues:  plaster wall damage in plant/store room: recently raised by complainant. CS concluded the damage was not claim related but due to waterproofing and ventilation issues. SW recommended the insurer decline to cover the damage  DJ system perspex cover: accepted, but awaiting confirmation complainant agreed to a quote to replace the cover on a ‘close as reasonably possible to matching’ basis  two speakers of the Sonos sound system: accepted. Replacement to be undertaken  disco lighting: accepted, and repair being arranged through supplier  electricals: exposed speaker cable, DJ rack system and bathroom light switch all accepted, with repairs being arranged. Upstairs bedroom missing light switch cover likely due to actions of ‘tenant from hell’. However, the insurer’s electrician to refit it if it can be found. Cinema room light switch appeared to be not working due to misuse (harsh clicking), not water damage. SW recommended the insurer decline to cover the damage  doors: light sanding and painting to be attended to by ML under warranty. ML to also as a goodwill gesture replace missing hinge pins on a door. Glass front swivel door had rust stains. It was physically impossible for the EOL claim event to have caused the damage given its location. Most likely caused by tenant carelessness. Decline recommended  vinyl built in seat covers: recently raised by complainant. ML to address under warranty. Insurer to decide on rectification issues Since March 2023, neither party has provided an update on the status of the outstanding works/rectificat ion issues. From SW’s report dated 9 March 2023, it appears that the majority of them had been accepted by the insurer, or by its builder ML under warranty. However, SW also recommended the insurer decline to cover the damage to the plant/store room, the cinema room light switch and the swivel door. If it has not already done so, the insurer is to confirm in writing its coverage decision regarding the swivel door, cinema room switch and plant room/storeroom. Given that it appears the insurer has not yet made a claims decision on these matters, it is open to the complainant to lodge a further complaint regarding coverage of these items if the parties cannot resolve this aspect of the claim. The insurer is also obliged to promptly progress resolution of the other remaining issues. 2.3 Is insurer liable for the lost house plans? No. It is not clear whether the plans were lost due to an error by the insurer’s builder. Even if they were, the insurer is not liable for the builder’s conduct to that extent. Circumstances in which house plans were lost It is not disputed that the complainant provided to ML upon request substantial original plans concerning the construction of the property, its plumbing and its electrical wiring. The individual who prepared the plans has apparently died. ML says that when it was finished with the plans in October 2020, it returned them to NP as requested by the complainant. It did so by attending his (new) home address and handing the plans to a young lady assumed to be NP’s da ughter. She was observed placing the plans to the right of the entry doors, on the inside floor. Determination | Case number: 909495 Page 6 of 9 Insurer is not liable for the lost house plans The complainant says it authorised the return of the plans to NP at his office, not his home address. It says the plans are worth up to $300,000 and that the digital copies that have been offered are insufficient as they do not include the electrical plans. It holds the insurer responsible for the plans’ loss and wants it to pay to have a new set prepared by an architect. However, it is not clear whether ML acted in error by returning the plans to NP’s home. The complainant says the instructions were to (only) return the plans to NP’s office, but ML disputes this. There is no suggestion the arrangement was formalised in writing, and the information provided does not allow me to determine which version of events is more likely. E ven if ML did fail to follow the complainant’s instru ctions, I am not satisfied that the complainant has shown the failure caused the plans to be lost. Further, I do not accept the insurer’s liability for ML’s conduct extends to that extent. Rather, the loss of the plans is a matter between the complainant and ML. I note that ML has notified its insurer of the complainant’s concerns, and ML’s insurer has provided a response. I am also satisfied that the insurer the subject of this complaint has made extensive enquiries of its trades and service providers in an effort to locate the plans. I am not satisfied the insurer is liable for the lost house plans in the circumstances. 2.4 Is insurer required to pay for increased electricity costs? Partially. I am satisfied the increased costs were likely due to both the repair works and the complainant’s tenants. The insurer is to pay 50% of the increased costs claimed. Insurer is to pay 50% of the increased costs claimed The complainant has provided an electricity bill in the amount of $2,914.70 for the period 9 June 2021 to 5 August 2021. The electricity bill shows costs two and half times greater than that for the previous billing period. The complainant says the increase was due to the insurer’s trades not reconnecting solar panels after they were disconnected during repairs. On 7 October 2022, SW reported that it was understood the panels were turned off during make safe repairs, but who did that was yet to be investigated. SW noted that tenants had moved into the property in June 2021. Based on the provided information, I am satisfied the increased costs were likely due to both the repair works and the complainant’s tenants. As I am unable to ascertain the extent to which each factor contributed to the increase, I consider it is fair to allocate responsibility equally. Accordingly, I am satisfied it is fair for the insurer to pay the complainant $582.94. This figure represents half of the increase on the previous billing period. 2.5 Is non-financial loss compensation payable? Yes. The insurer has contributed to the delays experienced, which have caused MT and NT stress and inconvenience. The insurer is to pay $2,500 in non-financial loss compensation. Determination | Case number: 909495 Page 7 of 9 AFCA can award compensation for poor claim handling Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400) where the insurer’s actions have caused an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with the complainant’s expectation of enjoyment or peace of mind. AFCA will normally only award compensation for non-financial loss to individuals. However, if the complainant is a company, and the company is simply a business vehicle for a ‘sole trader’ or self -m anaged superannuation fund, AFCA may award compensation to the individuals behind the company, if that is otherwise appropriate. Insurer has caused stress and inconvenience The complainant is a c ompany acting as a vehicle for MT and NT’s self-managed superannuation fund. I am satisfied it is reasonable to consider awarding MT and NT non- financial loss com pensation. NT says the insurer and its trades have been repeatedly negligent and have caused excessive and unreasonable delays. She says these issues have caused MT and her to experience stress and inconvenience. Having considered the information provided by the parties, I am satisfied that the insurer should have handled the claim more efficiently. In particular, it should have dealt with the rectification issues more promptly. While the property was purchased for investment purposes and not for them to live in, I am satisfied that the delay in resolving the rectification issues has unreasonably caused MT and NT stress and inconvenience. The insurer is obliged to pay $2,500 in non-financial loss compensation. For ease of doing so, the payment may be made to the complainant rather than split between MT and NT. 2.6 Why is the outcome fair? The outcome is fair as it reflects the respective rights and obligations of the parties under the policy. The outcome also fairly compensates the complainant for the additional losses in relation to which the insurer is reasonably responsible. Determination | Case number: 909495 Page 8 of 9 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.