Home / Suncorp Group / Determination 909356

Determination 909356

Insurer declined movement damage, cash settlement for defective storm repairs was inadequate, and claim handling caused stress

FirmSuncorp Group
Decided2023-05-11
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$3,000
Amount claimed$15,980
SourceAFCA PDF

Summary

After a storm claim, the insurer's repairs were deficient and it denied that later movement damage was related. AFCA upheld the denial of movement damage but required an increased cash settlement for rectification (RM's quote less batten items plus 20%) and $3,000 non-financial loss.

The insurer proved on balance, via unrefuted engineering evidence, that the movement damage stemmed from excluded long-term factors, but its cash settlement was unreasonable and its claim handling caused stress.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 909356 Financial firm AAI Limited Determination | Case number: 909356 Page 1 of 7 Case number: 909356 28 April 2023 1 Determination overview 1.1 Complaint The complainant holds home and contents insurance with the financial firm (insurer). On 29 October 2021, she lodged a claim after high winds caused trees on her property to fall. She said the trees damaged her home’s roof and guttering, a water tank and stand and fencing . The insurer accepted the claim and undertook repairs. Some of the repairs were deficient. The insurer undertook rectification works and has offered a cash settlement for other items. However, it has denied that any movement damage is related to the claim event or its repairs. The complainant maintains that the insurer is liable for the movement damage that appeared after the claim incident. She also says the insurer’s rectification work cash settlement offer is inadequate . Finally, she is dissatisfied with the insurer’s claim handling. 1.2 Issues and key findings Is the insurer liable for the movement damage? No. The provided information on balance indicates that the movement damage is not due to the claim event or the insurer’s repairs. Rather, it is likely the result of excluded factors. Is the insurer’s cash settlement offer reasonable ? No. The insurer’s offer is based on quotes that are not actionable and it has not included a contingencies uplift. The insurer is to pay the complainant the amount her roofer, RM, quoted less the non-claim related batten replacement items, plus a 20% uplift. Is non-financial loss compensation payable? Yes . The insurer’s poor claim handling and delays have unreasonably caused the complainant stress and inconvenience. It is to pay her $3,000 in compensation. Why is the outcome fair? The insurer has on balance proven the movement damage is not claim related or due to its repairs. It would therefore be unfair to require it to pay for the movement damage. However, the insurer’s rectification work cash settlement offer is inadequate, so it is fair that the offer is increased. It is also fair that the insurer compensates the complainant for the stress it caused. 1.3 Determination This determination is partially in favour of the complainant. If the complainant provides written notice she accepts this determination (notice), the following steps are to be taken:  t he complainant is to obtain a fully itemised version of RM’s quote dated 9 February 2023  w ithin 14 days of receiving RM’s itemised quote from the complainant, the insurer is to pay her the quoted amount, less the batten replacement items, plus a 20% contingencies uplift  within 14 days of the notice, the insurer is to pay the complainant $3,000 in compensation. Determination | Case number: 909356 Page 2 of 7 2 Reasons for determination The parties provided numerous submissions to AFCA. While this determination does not refer to them all, I have taken each submission into account in reaching my decision. 2.1 Is the insurer liable for the movement damage? No. The provided information on balance indicates that the movement damage is not due to the claim event or the insurer’s repairs. Rather, it is likely the result of excluded factors. Complainant has shown a claimable loss under the policy The complainant is required to show, on the balance of probabilities (that it is more likely than not), that she suffered a claimable loss under the policy. This means she must show the loss was caused by a risk for which she is insured. Subject to the terms and conditions set out in the product disclosure statement (PDS), the complainant’s policy covers damage to her property caused by a listed insured event. The listed events in clude ‘Storm’ . On 29 October 2021, the complainant lodged a claim after a storm earlier that day. High winds had caused large trees to fall and damage her home. The insurer accepted that claim and attended to repairs. Therefore, it has accepted the complainant suffered a claimable loss. In April 2022, the complainant informed the insurer that following the claim event and the insurer’s repairs, her home had developed further movement and cracking damage. She subsequently paid $15,980 for underpinning repairs. The complainant wants the insurer to reimburse her on the basis the movement damage was due to th e claim event. Alternatively, she says the damage was caused by the insurer’s defective repairs, so it is liable under the lifetime workmanship guarantee set out in the PDS. Once an insured has proven the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition. Insurer says it is not liable for the movement damage The insurer appointed JH, engineers, to investigate the movement damage. JH inspected the property on 14 June 2022. JH reported multiple causation factors, including:  seasonal soil moisture content variation and climatic conditions  the absence of brick articulation joints  the presence of trees within the footing influence zone  water discharge from a corroded rainwater tank (not damaged by the claim incident)  site drainage conditions leading to abnormal moisture conditions  a combination of brick piers and concrete stumps at varying levels. JH concluded: A level survey was taken within the dwelling and the evidence was indicative of long-term differential foundation settlement which has been exacerbated by inadequate site drainage. Other specific causation factors have been included above in this report. There was evidence of previous movement and ageing in Determination | Case number: 909356 Page 3 of 7 external cracks. Therefore, the damage is not considered to have been caused by a single event, but due to a combination of long-term processes. The compl ainant said JH’s report contained inaccuracies and emphasised the following:  JH recorded the complainant as saying the cracking had occurred to brickwork upon the trees’ impact. In fact , she had said that the new cracking that had appeared may have been a direct result of the impact  JH recorded repair works were undertaken in March 2022, and new guttering installed in April 2022. In fact, the guttering was installed in March 2022, but was not connected so drained directly onto the ground until it was connected to the new water tank in April 2022. JH provided a supplementary report to address the complainant’s concerns. JH said:  i n relation to the first inaccuracy, it had simply restated the insurer’s instructions to it, not sought to paraphrase anything the complainant said at the inspection  it apologised for the second inaccuracy, but said it did not affect its conclusions  because of the natural slope of the land, water from the unconnected gutter would flow away from the house and not affect its foundations  the subfloor had displayed dry conditions at the time of inspection, suggesting that no water had been entering into the subfloor space  t he complainant’s pre -purchase report dated 20 January 2021, mentioned movement and cracking damage. The photos in that report showed cracking that was essentially unchanged at the time JH inspected the property  ‘There was no physical evidence observed on site to indicate that existing cracking had been worsened by the tree impact or the repair process that followed or that any new cracking had been caused by the tree impact or the repair process that followed. This includes the effects of any temporary change to the site drainage conditions during the repair process’. The insurer says the movement damage is not covered because the policy excludes earth movement (except, relevantly, building damage caused by landslide/subsidence within 72 hours of and directly because of a storm – which does not apply in the circumstances). Further, the insurer says the movement damage is unrelated to its repairs. Complainant disagrees The complainant says that it would not be unreasonable to conclude from JH’s first report that ‘6 months without adequate drainage from a large portion of roof has the potential to cause lasting damage’. She estimates the rear section represents about 60% of the total roof area. The complainant refers to publicly available commentary from the Victorian Building Authority: The greatest cause of building damage by far is an excessive change of moisture in foundation soil around the perimeter of a house. Changes to drainage or watering of gardens in adjoining properties can also create problems. To help prevent damage, all possible water leaks and sources of excessive water should be repaired immediately. She notes JH’s first report also referred to the prospect that abnormal moisture conditions (including due to leaking pipes) could result in differential footing movement and damage. In additio n, the complainant submits that ‘g iven [the insurer] have [JH] as a 'listed trade', I am not entirely convinced their report is unbiased ’ . Determination | Case number: 909356 Page 4 of 7 Insurer is not liable for movement damage JH’ s reports are the only expert commentary provided as to the cause of the movement damage. JH unequivocally states that there is no physical evidence to show that damage had been caused or contributed to by the claim event or the insurer’s repairs. Instead, JH says the damage is due to long term processes. Those processes are excluded factors under the PDS. JH’s reports conta in detailed analysis, supported by technical drawings and references, photos and testing results. I do not consider the criticisms the complainant has raised about JH’s reports persuasive enough to justify rejecting them. I also note that while she disagrees with those reports, the complainant also seeks to rely on aspects of them. There is no cogent evidence to support a conclusion that JH is biased. In the circumstances, and in the absence of any expert evidence to the contrary, I find JH’s opinions persu asive. The movement damage is not due to the claim event or the insurer’s repairs. Rather, it is likely the result of excluded factors. 2.2 Is the insurer’s cash settlement offer reasonable ? No. The insurer’s offer is based on quotes that are not actionable an d it has not included a contingencies uplift. The insurer is to pay the complainant the amount her roofer, RM, quoted less the non-claim related batten items, plus a 20% uplift. I nsurer’s roof and guttering repairs were inadequate The insurer engaged builder PP to undertake the claim related repairs to the property, including to the rear roof and guttering. It appears the work was subcontracted to builder SH. In its report dated 29 June 2022, JH identified that the insurer’s builder had in March 2022 undertaken roof and gutter repairs. JH said the roof flashing appeared to have been inadequately installed and recommended a roof specialist be engaged to address the issue. On 23 July 2022, another of the insurer’s builder s, AB, attended the property. AB identified that the roof sheets that had been installed were short. It said during storms rain would blow back under the sheets as there was no flashing. On 5 August 2022, one of the insurer’s assessors noted that ‘the flashings were not allowed for in SOW [scope of works] but understands flashing would have been removed and reinstated for the new roofing to be installed’. The assessor recommended a dual assessment take place onsite to ascertain the rectification work required. The dual assessment took place at the property on 2 September 2022, involving the internal assessor, PP and the complainant . The assessor’s resulting report notes that:  the replacement roof sheets were slightly smaller than the undamaged sheets  the roofer had installed a flashing between the two roofs to prevent water ingress  the flashing may not be working as there was a leak coming in through the ceiling below  ‘the flashing is not aesthetically great either’  the flashing on the gable roof has not been installed adequately  PP agreed to engage a trade other than SH to undertake further investigations. Determination | Case number: 909356 Page 5 of 7 On 20 September 2022, roofer SP reported that water was leaking through the transition flashing due to wind driven rain coming under the roof sheets. It recommended removing the flashing and ensuring the roof sheet ends were correctly weathered. SP also suggested infill strips be installed. It also noted that a rear gutter had insufficient fall and needed re-pitching. The complainant has repeatedly told the insurer that the leak is not due to wind driven rain as it did not only occur during storms. Rather, the leak was due to condensation on frosty mornings. Regardless, it is apparent that the roof repair has not been watertight. Insurer has offered to cash settle roof/gutter rectification The insurer determined that the issues with the roofing was ultimately the responsibility of PP. It informed PP that it would be holding it liable for the rectification costs. On 14 March 2023, the insurer offered to cash settle the roof rectification costs for $1,769.81. The offer was based on PP’s SOW and quote dated 12 February 2023, described as a ‘liability quotation’. The insurer asserted for some time that the gutter fall problem was a maintenance issue to be attended to by the complainant. However, it eventually accepted responsibility for the inadequate gutter repair. On 18 April 2023, it offered to cash settle the associated rectification cost for $1,425.18. The offer was based on another ‘liability quotation’ from PP . Complainant says cash settlement offers are insufficient The complainant says the amounts the insurer has offered are insufficient to cover the reasonable cost of rectification. She relies on a quote dated 9 February 2023 from builder RM, totalling $7,810. On the quote, RM said there was a roof sheeting mismatch at the rear of the house, and that flashing had been added to try and rectify the problem. RM noted sisalation had not been fitted correctly to run condensation into the gutter. According to RM, the ‘only way to fix this issue to an adequate standard is to replace whole back roof’. Cash settlement offer is unreasonable A cash settlement must be based on a reasonable quote for repairs, actionable by a retail customer. An uplift is then to be applied to the quoted amount to allow for contingencies and the loss of the lifetime guarantee that applies to insurer approved repairs. I am not satis fied that the insurer’s cash settlement offer ($3,194.99) is reasonable because:  PP’s quotes do not reasonably refl ect repair costs. For example, the roof quote makes no allowance for debris removal and disposal. The separate gutter quote allows for that item but the allowance is only $58.91, which is said to also include supplying a bin  ‘liability quotation’ strongly suggests PP prepared the quotes to reflect how much it would cost it to rectify the issues (its liability) instead of on an actionable, retail basis  the offer does not include a contingencies uplift. The insurer says that RM’s quote cannot be relied upon because it ‘ includes additional works not related to the claim including replacing undamaged roof sheeting’. However, that fails to take into account the problems the insurer’s repairs caused. RM says the only way to adequately fix those problems is to replace the back roof. Determination | Case number: 909356 Page 6 of 7 Nevertheless, I acknowledge that RM’s quote includes works clearly not associated with the claim or the insurer’s repairs. Those are the removal of ‘any old unwanted timber battens’, and the supply and installation of new battens. RM’s quote is not itemised. However, the insurer has had ample opportunity to obtain appropriate quotes on which to base a cash settlement offer. The claim event occurred 18 months ago. It would be unreasonable to allow the insurer more time to investigate its liability. In the circumstances, if the complainant accepts this determination, she is to obtain a fully itemised version of RM’s quote. She is to provide the itemised quote to the insurer, who is to pay her the quoted amount, less the batten replacement items, plus a 20% contingencies uplift. I note that the policy excess has already been paid. 2.3 Is non-financial loss compensation payable? Yes. The insurer’s poor claim handling and delays have unreasona bly caused the complainant stress and inconvenience. It is to pay her $3,000 in compensation. AFCA can award compensation for poor claim handling Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400) where the insurer’s actions have caused an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with the complainant’s expectation of enjoyment or peace of mind. Insurer has caused stress and inconvenience The complainant says that the claim process has been a nightmare. She says ‘t he event itself was traumatising, but then dealing with all of this afterwards has made it the worst experience of my life ’ . According to the complainant, she has lost sleep, shed many tears and has felt harassed by the insurer and its trades. The complainant has provided a detailed timeline of events. That timeline along with the insurer’s claim notes confirm the insurer is responsible for extensive delays, numerous errors and poor communication. Its cash settlement approach has also been unreasonable given it has not included all the required works, is not based on an actionable quote and has no contingency uplift. I accept the insurer’s poor claim handling and delays have unreasonably caused the complainant significant stress and inconvenience. Her home has not been watertight for 18 months. She has been contacted by the insurer’s trades on weekends and public holidays despite requests that not occur. She has had to deal with multiple substandard repairs. The insurer is required to pay $3,000 in non-financial loss compensation. 2.4 Why is the outcome fair? The insurer has on balance proven the movement damage is not claim related or due to its repairs. It would therefore be unfair to require it to pay for the movement damage. However, the insurer’s rectification work cash settlement offer is inadequate, so it is fair that the offer is increased. It is also fair that the insurer compensates the complainant for the stress it caused. Determination | Case number: 909356 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.