Insurer declined movement damage, cash settlement for defective storm repairs was inadequate, and claim handling caused stress
Text of the determination
Determination
Case number 909356
Financial firm AAI Limited
Determination | Case number: 909356 Page 1 of 7
Case number: 909356 28 April 2023
1 Determination overview
1.1 Complaint
The complainant holds home and contents insurance with the financial firm (insurer). On 29
October 2021, she lodged a claim after high winds caused trees on her property to fall. She
said the trees damaged her home’s roof and guttering, a water tank and stand and fencing .
The insurer accepted the claim and undertook repairs. Some of the repairs were deficient.
The insurer undertook rectification works and has offered a cash settlement for other items.
However, it has denied that any movement damage is related to the claim event or its repairs.
The complainant maintains that the insurer is liable for the movement damage that appeared
after the claim incident. She also says the insurer’s rectification work cash settlement offer is
inadequate . Finally, she is dissatisfied with the insurer’s claim handling.
1.2 Issues and key findings
Is the insurer liable for the movement damage?
No. The provided information on balance indicates that the movement damage is not due to
the claim event or the insurer’s repairs. Rather, it is likely the result of excluded factors.
Is the insurer’s cash settlement offer reasonable ?
No. The insurer’s offer is based on quotes that are not actionable and it has not included a
contingencies uplift. The insurer is to pay the complainant the amount her roofer, RM, quoted
less the non-claim related batten replacement items, plus a 20% uplift.
Is non-financial loss compensation payable?
Yes . The insurer’s poor claim handling and delays have unreasonably caused the
complainant stress and inconvenience. It is to pay her $3,000 in compensation.
Why is the outcome fair?
The insurer has on balance proven the movement damage is not claim related or due to its
repairs. It would therefore be unfair to require it to pay for the movement damage. However,
the insurer’s rectification work cash settlement offer is inadequate, so it is fair that the offer is
increased. It is also fair that the insurer compensates the complainant for the stress it caused.
1.3 Determination
This determination is partially in favour of the complainant. If the complainant provides written
notice she accepts this determination (notice), the following steps are to be taken:
t he complainant is to obtain a fully itemised version of RM’s quote dated 9 February 2023
w ithin 14 days of receiving RM’s itemised quote from the complainant, the insurer is to pay
her the quoted amount, less the batten replacement items, plus a 20% contingencies uplift
within 14 days of the notice, the insurer is to pay the complainant $3,000 in compensation.
Determination | Case number: 909356 Page 2 of 7
2 Reasons for determination
The parties provided numerous submissions to AFCA. While this determination does not refer
to them all, I have taken each submission into account in reaching my decision.
2.1 Is the insurer liable for the movement damage?
No. The provided information on balance indicates that the movement damage is not due to
the claim event or the insurer’s repairs. Rather, it is likely the result of excluded factors.
Complainant has shown a claimable loss under the policy
The complainant is required to show, on the balance of probabilities (that it is more likely than
not), that she suffered a claimable loss under the policy. This means she must show the loss
was caused by a risk for which she is insured.
Subject to the terms and conditions set out in the product disclosure statement (PDS), the
complainant’s policy covers damage to her property caused by a listed insured event. The
listed events in clude ‘Storm’ .
On 29 October 2021, the complainant lodged a claim after a storm earlier that day. High
winds had caused large trees to fall and damage her home. The insurer accepted that claim
and attended to repairs. Therefore, it has accepted the complainant suffered a claimable loss.
In April 2022, the complainant informed the insurer that following the claim event and the
insurer’s repairs, her home had developed further movement and cracking damage. She
subsequently paid $15,980 for underpinning repairs.
The complainant wants the insurer to reimburse her on the basis the movement damage was
due to th e claim event. Alternatively, she says the damage was caused by the insurer’s
defective repairs, so it is liable under the lifetime workmanship guarantee set out in the PDS.
Once an insured has proven the existence of a claimable loss, the insurer is liable for the loss
unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving
on the balance of probabilities the application of the exclusion or condition.
Insurer says it is not liable for the movement damage
The insurer appointed JH, engineers, to investigate the movement damage. JH inspected the
property on 14 June 2022. JH reported multiple causation factors, including:
seasonal soil moisture content variation and climatic conditions
the absence of brick articulation joints
the presence of trees within the footing influence zone
water discharge from a corroded rainwater tank (not damaged by the claim incident)
site drainage conditions leading to abnormal moisture conditions
a combination of brick piers and concrete stumps at varying levels.
JH concluded:
A level survey was taken within the dwelling and the evidence was indicative of
long-term differential foundation settlement which has been exacerbated by
inadequate site drainage. Other specific causation factors have been included
above in this report. There was evidence of previous movement and ageing in
Determination | Case number: 909356 Page 3 of 7
external cracks. Therefore, the damage is not considered to have been caused by
a single event, but due to a combination of long-term processes.
The compl ainant said JH’s report contained inaccuracies and emphasised the following:
JH recorded the complainant as saying the cracking had occurred to brickwork upon the
trees’ impact. In fact , she had said that the new cracking that had appeared may have
been a direct result of the impact
JH recorded repair works were undertaken in March 2022, and new guttering installed in
April 2022. In fact, the guttering was installed in March 2022, but was not connected so
drained directly onto the ground until it was connected to the new water tank in April 2022.
JH provided a supplementary report to address the complainant’s concerns. JH said:
i n relation to the first inaccuracy, it had simply restated the insurer’s instructions to it, not
sought to paraphrase anything the complainant said at the inspection
it apologised for the second inaccuracy, but said it did not affect its conclusions
because of the natural slope of the land, water from the unconnected gutter would flow
away from the house and not affect its foundations
the subfloor had displayed dry conditions at the time of inspection, suggesting that no
water had been entering into the subfloor space
t he complainant’s pre -purchase report dated 20 January 2021, mentioned movement and
cracking damage. The photos in that report showed cracking that was essentially
unchanged at the time JH inspected the property
‘There was no physical evidence observed on site to indicate that existing cracking had
been worsened by the tree impact or the repair process that followed or that any new
cracking had been caused by the tree impact or the repair process that followed. This
includes the effects of any temporary change to the site drainage conditions during the
repair process’.
The insurer says the movement damage is not covered because the policy excludes earth
movement (except, relevantly, building damage caused by landslide/subsidence within 72
hours of and directly because of a storm – which does not apply in the circumstances).
Further, the insurer says the movement damage is unrelated to its repairs.
Complainant disagrees
The complainant says that it would not be unreasonable to conclude from JH’s first report that
‘6 months without adequate drainage from a large portion of roof has the potential to cause
lasting damage’. She estimates the rear section represents about 60% of the total roof area.
The complainant refers to publicly available commentary from the Victorian Building Authority:
The greatest cause of building damage by far is an excessive change of moisture
in foundation soil around the perimeter of a house. Changes to drainage or
watering of gardens in adjoining properties can also create problems. To help
prevent damage, all possible water leaks and sources of excessive water should
be repaired immediately.
She notes JH’s first report also referred to the prospect that abnormal moisture conditions
(including due to leaking pipes) could result in differential footing movement and damage.
In additio n, the complainant submits that ‘g iven [the insurer] have [JH] as a 'listed trade', I am
not entirely convinced their report is unbiased ’ .
Determination | Case number: 909356 Page 4 of 7
Insurer is not liable for movement damage
JH’ s reports are the only expert commentary provided as to the cause of the movement
damage. JH unequivocally states that there is no physical evidence to show that damage had
been caused or contributed to by the claim event or the insurer’s repairs.
Instead, JH says the damage is due to long term processes. Those processes are excluded
factors under the PDS.
JH’s reports conta in detailed analysis, supported by technical drawings and references,
photos and testing results.
I do not consider the criticisms the complainant has raised about JH’s reports persuasive
enough to justify rejecting them. I also note that while she disagrees with those reports, the
complainant also seeks to rely on aspects of them.
There is no cogent evidence to support a conclusion that JH is biased.
In the circumstances, and in the absence of any expert evidence to the contrary, I find JH’s
opinions persu asive. The movement damage is not due to the claim event or the insurer’s
repairs. Rather, it is likely the result of excluded factors.
2.2 Is the insurer’s cash settlement offer reasonable ?
No. The insurer’s offer is based on quotes that are not actionable an d it has not included a
contingencies uplift. The insurer is to pay the complainant the amount her roofer, RM, quoted
less the non-claim related batten items, plus a 20% uplift.
I nsurer’s roof and guttering repairs were inadequate
The insurer engaged builder PP to undertake the claim related repairs to the property,
including to the rear roof and guttering. It appears the work was subcontracted to builder SH.
In its report dated 29 June 2022, JH identified that the insurer’s builder had in March 2022
undertaken roof and gutter repairs. JH said the roof flashing appeared to have been
inadequately installed and recommended a roof specialist be engaged to address the issue.
On 23 July 2022, another of the insurer’s builder s, AB, attended the property. AB identified
that the roof sheets that had been installed were short. It said during storms rain would blow
back under the sheets as there was no flashing.
On 5 August 2022, one of the insurer’s assessors noted that ‘the flashings were not allowed
for in SOW [scope of works] but understands flashing would have been removed and
reinstated for the new roofing to be installed’. The assessor recommended a dual assessment
take place onsite to ascertain the rectification work required.
The dual assessment took place at the property on 2 September 2022, involving the internal
assessor, PP and the complainant . The assessor’s resulting report notes that:
the replacement roof sheets were slightly smaller than the undamaged sheets
the roofer had installed a flashing between the two roofs to prevent water ingress
the flashing may not be working as there was a leak coming in through the ceiling below
‘the flashing is not aesthetically great either’
the flashing on the gable roof has not been installed adequately
PP agreed to engage a trade other than SH to undertake further investigations.
Determination | Case number: 909356 Page 5 of 7
On 20 September 2022, roofer SP reported that water was leaking through the transition
flashing due to wind driven rain coming under the roof sheets. It recommended removing the
flashing and ensuring the roof sheet ends were correctly weathered. SP also suggested infill
strips be installed. It also noted that a rear gutter had insufficient fall and needed re-pitching.
The complainant has repeatedly told the insurer that the leak is not due to wind driven rain as
it did not only occur during storms. Rather, the leak was due to condensation on frosty
mornings. Regardless, it is apparent that the roof repair has not been watertight.
Insurer has offered to cash settle roof/gutter rectification
The insurer determined that the issues with the roofing was ultimately the responsibility of PP.
It informed PP that it would be holding it liable for the rectification costs.
On 14 March 2023, the insurer offered to cash settle the roof rectification costs for $1,769.81.
The offer was based on PP’s SOW and quote dated 12 February 2023, described as a
‘liability quotation’.
The insurer asserted for some time that the gutter fall problem was a maintenance issue to be
attended to by the complainant. However, it eventually accepted responsibility for the
inadequate gutter repair. On 18 April 2023, it offered to cash settle the associated rectification
cost for $1,425.18. The offer was based on another ‘liability quotation’ from PP .
Complainant says cash settlement offers are insufficient
The complainant says the amounts the insurer has offered are insufficient to cover the
reasonable cost of rectification. She relies on a quote dated 9 February 2023 from builder
RM, totalling $7,810.
On the quote, RM said there was a roof sheeting mismatch at the rear of the house, and that
flashing had been added to try and rectify the problem. RM noted sisalation had not been
fitted correctly to run condensation into the gutter. According to RM, the ‘only way to fix this
issue to an adequate standard is to replace whole back roof’.
Cash settlement offer is unreasonable
A cash settlement must be based on a reasonable quote for repairs, actionable by a retail
customer. An uplift is then to be applied to the quoted amount to allow for contingencies and
the loss of the lifetime guarantee that applies to insurer approved repairs.
I am not satis fied that the insurer’s cash settlement offer ($3,194.99) is reasonable because:
PP’s quotes do not reasonably refl ect repair costs. For example, the roof quote makes no
allowance for debris removal and disposal. The separate gutter quote allows for that item
but the allowance is only $58.91, which is said to also include supplying a bin
‘liability quotation’ strongly suggests PP prepared the quotes to reflect how much it would
cost it to rectify the issues (its liability) instead of on an actionable, retail basis
the offer does not include a contingencies uplift.
The insurer says that RM’s quote cannot be relied upon because it ‘ includes additional works
not related to the claim including replacing undamaged roof sheeting’. However, that fails to
take into account the problems the insurer’s repairs caused. RM says the only way to
adequately fix those problems is to replace the back roof.
Determination | Case number: 909356 Page 6 of 7
Nevertheless, I acknowledge that RM’s quote includes works clearly not associated with the
claim or the insurer’s repairs. Those are the removal of ‘any old unwanted timber battens’,
and the supply and installation of new battens.
RM’s quote is not itemised. However, the insurer has had ample opportunity to obtain
appropriate quotes on which to base a cash settlement offer. The claim event occurred 18
months ago. It would be unreasonable to allow the insurer more time to investigate its liability.
In the circumstances, if the complainant accepts this determination, she is to obtain a fully
itemised version of RM’s quote. She is to provide the itemised quote to the insurer, who is to
pay her the quoted amount, less the batten replacement items, plus a 20% contingencies
uplift. I note that the policy excess has already been paid.
2.3 Is non-financial loss compensation payable?
Yes. The insurer’s poor claim handling and delays have unreasona bly caused the
complainant stress and inconvenience. It is to pay her $3,000 in compensation.
AFCA can award compensation for poor claim handling
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss
(capped at $5,400) where the insurer’s actions have caused an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or peace of mind.
Insurer has caused stress and inconvenience
The complainant says that the claim process has been a nightmare. She says ‘t he event itself
was traumatising, but then dealing with all of this afterwards has made it the worst experience
of my life ’ . According to the complainant, she has lost sleep, shed many tears and has felt
harassed by the insurer and its trades.
The complainant has provided a detailed timeline of events. That timeline along with the
insurer’s claim notes confirm the insurer is responsible for extensive delays, numerous errors
and poor communication. Its cash settlement approach has also been unreasonable given it
has not included all the required works, is not based on an actionable quote and has no
contingency uplift.
I accept the insurer’s poor claim handling and delays have unreasonably caused the
complainant significant stress and inconvenience. Her home has not been watertight for 18
months. She has been contacted by the insurer’s trades on weekends and public holidays
despite requests that not occur. She has had to deal with multiple substandard repairs.
The insurer is required to pay $3,000 in non-financial loss compensation.
2.4 Why is the outcome fair?
The insurer has on balance proven the movement damage is not claim related or due to its
repairs. It would therefore be unfair to require it to pay for the movement damage. However,
the insurer’s rectification work cash settlement offer is inadequate, so it is fair that the offer is
increased. It is also fair that the insurer compensates the complainant for the stress it caused.
Determination | Case number: 909356 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. I have reviewed and considered
all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, I have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.