Home / Youi / Determination 909236
Determination 909236
Dispute over cash settlement amount and scope of works after fire damage, plus temporary accommodation
Summary
The insurer accepted a fire claim but cash settled at a figure the complainant disputed. A panel required increased settlement for several items, temporary accommodation of $29,400 in total, $5,400 indirect loss, up to $5,000 legal costs and $4,500 non-financial loss.
The insurer's delays and handling of the claim, and failure to explain the temporary accommodation benefit, made it fair to increase the settlement and award compensation.
Issues
- Claim amount dispute primary · upheld“insurer is required to increase its settlement offer; roof cleaning, kitchen, pergola, power pole, air conditioning added”
- Poor claim handling secondary · upheld“insurer's handling of this claim has not been as efficient or effective as might reasonably be expected”
- Delay secondary · upheld“insurer acknowledged several delays; remediation delay caused additional damage”
- Poor communication secondary · upheld“insurer's failure to notify the complainant that temporary accommodation is an additional benefit”
- Repairs or contractors secondary · upheld“Parties disagree on scope of works; inconsistent identification of structures led to several variations to J's scope of works”
Subjects and remedies
home or building damagepay claimpay compensationpay interestpay non financial loss
Related
Text of the determination
Determination
Case number 909236
Financial firm Youi Pty Ltd
Determination | Case number: 909236 Page 1 of 9
Case number: 909236 10 October 2023
1 Determination overview
1.1 Complaint
The complainant holds building and contents insurance with the financial firm (the insurer).
On 28 September 2021, he lodged a claim for fire damage to both his property and contents.
The insurer accepted the claim however a dispute has arisen over the repair scope of works
and what is considered a fair and reasonable settlement figure.
The insurer sought to cash settle its liability for a total sum of $210,183.80, which includes a
15% uplift for contingencies .
An additional $14,000 was included in the settlement being temporary accommodation costs
during the repair phase.
The complainant does not consider the insurer’s settlement offer fair and reasonable.
The complainant is represented. For the sake of brevity and convenience, any references to
the complainant in this determination will include references to his representative.
1.2 Issues and key findings
Is the insurer required to increase its settlement offer?
Yes. The evidence shows that the insurer is required to increase its settlement offer in
accordance with the provisions of this determination.
Is the complainant entitled to further temporary accommodation?
Yes. The insurer is to include an amount for temporary accommodation in its settlement as
detailed within the provisions of this determination.
Is the complainant entitled to indirect financial loss compensation?
Yes. The panel considers the insurer’s actions cause d the complainant to suffer indirect
financial loss. It is fair in all the circumstances for the insurer to pay them $5,400. It is als o fair
for the insurer to pay the complainant up to $5,000 for his legal representation.
Is the complainant entitled to non-financial loss compensation?
Yes. Given the insurer’s h andling of the claim, delay and the impact on the complainant, the
panel considers an award of $4,500 in non-financial loss compensation is fair.
1.3 Determination
This determination is substantially in favour of the complainant.
Within 14 days of this determination being accepted by the complainant, the insurer is to
comply with the provisions of this determination.
Determination | Case number: 909236 Page 2 of 9
2 Reasons for determination
There has been a full exchange of material between the parties, and each party has had the
opportunity to address the issues arising from the information exchanged.
Due to the nature of/complexities involved in this dispute, it has been referred to a Panel for
determination.
This determination follows consideration of all the information exchanged and is based on
what is fair in all the circumstances, having regard to the relevant legal principles, terms of the
policy, good industry practice including codes of practice and previous AFCA decisions where
applicable.
2.1 Is the insurer required to increase its settlement offer?
Parties do not dispute that there is a claimable loss
The complainant’s policy is a listed events policy. It provides cover for a s eries of events,
including fire, subject to the terms and conditions of the policy.
The parties do not dispute that the complainant has established a claimable loss under the
policy. The complainant is required to show, on the balance of probabilities, that any claimed
loss is the result of an insured event covered under the terms of the policy. This is known as
establishing a valid claim.
The coverage provided by the policy is subject to conditions, limitations and exclusions. This
means that not all loss or damage is automatically covered.
T he issues in contention between the parties relate to the insurer’s assessment of its liability
for the claim and additional costs incurred by the complainant.
Parties disagree on the scope of works
The complainant argues that the insurer’s builder, J prepared five building repair contracts
that were incomplete. This included, but was not limited to, Home Owners Warranty and
Insurance provisions. He said each contract failed to address the full extent of damage. The
complainant proceeded with the repairs privately based on the insurer’s version 5 scope of
works.
The insurer says that when the claim was set tled it was noted that the property had been
remediated and the painting of the internals (bedrooms, walk in robe, ensuite, hallway, toilet,
ground floor lobby room) was not required. The complainant has had these repairs included in
their repairs which we re not agreed to.
Relevant to this determination, the complainant seeks for the insurer to accept the following
items:
$9,520.30 for roof cleaning
$30,925 for kitchen
$2,663.10 for vanity
$6,214.60 for pergola
$3,123 for power pole
$43,990.38 for accommodation
$5,000 in non-financial loss compensation and
$5,000 for legal fees.
Determination | Case number: 909236 Page 3 of 9
Remediation delays
The insurer acknowledged several delays throughout the claim of which significant to this
dispute was the remediation of the building.
The claim timeline confirms that on:
28 September 2021 - claim lodged
5 January 2022 - building clean underway
28 January 2022 - hygienist testing onsite
The insurer appointed its builder, J who further subcontracted 365 to complete the
remediation. The insurer explained that the authorization to proceed could only be given after
it completed its investigation. The investigation concluded in November 2021 and the insurer
authorised the claim in December 2021 and restoration commenced in January 2022
The complainant argues that because of the remediation delay, his property suffered
irreparable damage. He seeks for the insurer to accept the additional costs he incurred.
The panel accepts that while the insurer is entitled to investigate a claim, any additional
property damage caused during remediation or lack thereof, in fairness, would fall under the
scope of its claim assessment.
Roof cleaning
The complainant said it cost him $8,856.10 to arrange roof cleaning works, which he did
privately. He provided an invoice from 365 which detailed the work it carried out. To this
amount he added a 7.5% uplift, which he called an ‘(insurer) warranty’, making a total of
$9,520.30.
The insurer included $4,000 for the cleaning of the roof in th e settlement, inclusive of the
margin and GST. The insurer requested a breakdown of costs for review of any additional
costs claimed.
Given roof cleaning was required and the complainant provided an invoice for the work
completed, the panel prefers complainant’s position. However, given the amount payable by
the complainant is the amount of the tax invoice, the panel does not accept the insurer is
responsible for the uplift.
The insurer is to reimburse the complainant the difference between the tax invoice and the
amount allowed in the settlement sum, that is $4,856.10.
Kitchen
The complainant was concerned that after 16 weeks of inactivity, the smoke would have
settled into the timber work. The complainant believed that the delays deteriorated the q uality
and condition of the kitchen. The complainant provided photographs in support of his position.
The insurer does not consider photos of the kitchen and vanities confirms they were damaged
by smoke. In January 2022, the insurer agreed to carry out o xidisation testing and instructed
its hygienist to test for carbon deposits. The insurer concluded that while there is no specific
testing that would confirm oxidisation, there is a test to confirm carbon deposits.
The insurer appointed an expert, M who confirmed that there were no traces of carbon
deposits and relied on this to limit its liability. The panel notes that testing was not conducted
until some four months after the fire and some cleaning had been completed.
The panel also notes that fire contamination was observed to be prevalent within the kitchen.
Determination | Case number: 909236 Page 4 of 9
Further, M reportedly detected minor and trace elements of soot and charcoal in the kitchen
area and this was present after cleaning had been completed.
In the circumstances of this claim the panel is satisfied that it would be fair that the insurer
contributes 50% of the cost to replace the kitchen. The insurer is to pay the sum of
$15,462.50.
Vanity
The insurer’s notes show that in January 2022, the complainant raised concerns about the
vanity needing replacement as he felt that the toxic fumes would have entered the materials.
The complainant provided photographs to show that it was damaged due to oxidisation. The
complainant has since replaced it and is seeking this cost.
The available information does not show this was non-restorable. Given this, the panel is not
persuaded the vanity is non-restorable.
Pergola
The complainant said the damage to the pergola was caused by the scaffolding used to
replace the roof on the main section of the house. The complainants seek $6,214.60 for the
costs he incurred to replace the pergola.
The insurer argued that the pergola was scoped into the cash settlement for $850.00.
There is limited information available but having regard to the available information and in the
interest of bringing finality to the dispute, the panel considers a 50% contribution to the
difference between the amount claimed and what the insurer allowed, is fair. The insurer is to
pay $2,682.30.
Air Conditioning
The insurer’s notes confirm that the air conditioning unit was reportedly damaged and scoped
in the J’s fifth version of the scope of works. However, the insurer has not commented as to
why it has excluded this amount from its final settlement offer.
The complainant provided a report from B to say the unit was severely smoked damage and a
replacement of the whole unit and duct work was recommended.
The insurer has not provided any ex pert evidence to refute B’s assessment of its fair
replacement costs. On balance, the panel accepts the complainant’s position given it is
support by B.
Power pole
The complainant said it was necessary for the power main to be disconnected from the
property (including the shed) and a temporary pole to be arranged, to facilitate safe work
practice. He provided an invoice of $3,123 in support of these costs claimed.
In its response dated 17 February 2023, the insurer accepted the costs claimed.
It is fair the insurer increases its cash settlement for the building repairs
As discussed above, the panel considers it fair for the insurer to increase its cash settlement
for the following disputed items:
Roof cleaning $4,856.10
Kitchen $15,462.50
Determination | Case number: 909236 Page 5 of 9
Pergola $2,682.30
Power pole $3,123
Air Conditioning $14,850
The insurer is to pay interest, in accordance with the Insurance Contracts Act 1984 (the Act),
from the date any of these amounts were paid by the complainant, until reimbursement by the
insurer.
The complainant is to provide proof of payment.
2.2 Is the complainant entitled to further temporary
accommodation?
It is not in dispute that the complainant was entitled to temporary accommodation while the
property was being repaired. However, the insurer disagrees that it is liable for further
temporary accommodation because the complainant has not substantiated the costs claimed.
The insurer’s notes confirm that in October 2021, the complainant did ask the insurer if it
would consider paying temporary accommodation in lieu of the costs he would incur towards
the additional costs he would incur to match materials. The insurer acknowledged this and
said it would review and confirm.
The insurer again offered accommodation and the complainant declined saying he would like
to keep his claim costs down and local accommodation was expensive with little or no options
available to him.
The panel acknowledges that while the complainant may have acted in good faith (to keep
claim costs down), temporary accommodation is an additional benefit available to him and is
paid in addition to his building sum insured. There is no information that shows the insurer
attempted to clarify this with the complainant. Moreover, t hroughout the insurer’s interactio n
with the complainant about accommodation, the complainant expressed his preference to
stay onsite.
On 11 February 2022, the complainant discussed accommodation with the insurer again. Due
to the location and limited options, the complainant negotiated an alternate arrangement
whereby the insurer would pay him $150 per night for his stay in his shed.
On 15 February 2022, the insurer explained that it would be willing to consider paying
temporary accommodation in lieu of the disputed kitchen repairs. However, this was subject
to the outcome of the onsite assessment discussion with the insurer’s representative that was
set to happen later in the week. Both parties agreed to this.
On 25 February 2022, the complainant notified the insurer that the onsite assessment did not
go as planned. Instead, he still wanted the insurer to accept the kitchen repairs in full and he
re-negotiated the same accommodation arrangements but for an increased rate of $200 per
night. The insurer did not agree to this.
The insurer says that temporary accommodation under the policy is for actual incurred costs,
no proof of incurred costs has been provided. However, it has included $14,000 in the
settlement in good faith for temporary accommodation. The insurer says if receipts can be
provided for incurred temporary accommodation costs for the remaining sum, reimbursement
of costs above this up to the policy limit can be offered.
Determination | Case number: 909236 Page 6 of 9
The complainant argues that if he had been advised by the insurer that the allowance paid is
an additional benefit, he would not have subjected himself through the difficult and stressful
circumstances of living in the shed.
The panel has carefully considered all submissions and has had regard to the following
factors;
The insurer was on notice of the condition in which the complainant was living and
that it was lesser than what he was entitled to under the policy benefit
The delays caused by the insurer resulting in a longer period the complainant was out
of the home
The insurer’s failure to notify the complainant that temporary accommodation is an
additional benefit, despite the insurer being on notice the complainant was seeking to
minimise claim costs
The panel is of the view that given the limited options in the area, the insurer should
have considered more flexible accommodation solutions, such as a cash settlement or
assisting with the fit out of the shed
The PDS details it will only reimburse the actual costs incurred and
The insurer did offer alternate accommodation options.
Having had regard to these factors the panel it is satisfied it would be fair to pay the
complainant for the time he spent in the shed (147 days) at the offered rate of $200p/n, a total
of $29,400.00.
For the sake of clarity, the panel notes;
This is the total amount for temporary accommodation and is not in addition to the
$14,000.00 the insurer offered and
The insurer is not required to pay an additional amount under the heading, temporary
accommodation, for the money the complainant spent of the shed.
2.3 Is the complainant entitled to indirect financial loss
compensation?
Yes. The panel considers the insurer’s actions caused the complainant to suffer indirect
financial loss. It is fair in all the circumstances for the insurer to pay him $5,400.
The complainant has suffered additional indirect financial loss
The insurer says the policy excludes cover for indirect loss. However, AFCA can award
indirect financial loss compensation for additional loss suffered when an insurer mishandles a
claim.
The panel accepts that the available information confirms that the complainant discussed the
option of living on site on numerous occasions. While the insurer is not solely responsible for
finding suitable temporary accommodation, the insurer should and could have done more.
The complainant said that the living conditions in the shed were not adequate and not
suitable for occupancy as it was a storage workshop consisting of one toilet. Because of this,
he incurred additional expenses of over $10,000 on, but not limited to:
use of laundromat facilities
clean ing out of pests’ faeces
pruning of the surrounding trees
Determination | Case number: 909236 Page 7 of 9
In the circumstances, the panel is satisfied the complainant has provided information to show
he incurred losses due to the insurer’s actions.
Given this, the panel is satisfied the complainant is entitled to recover the maximum $5,400
as compensation for his indirect financial loss. Under the AFCA rules, we cannot award
anything further.
Legal fees
Claim circumstances are sufficiently complex to warrant legal assistance
Under the AFCA rules, we may require an insurer to contribute towards a complainant’s legal
costs if the complaint raised complex issues and it was reasonable to seek legal advice.
Unless there are exceptional circumstances, we will not require an insurer to contribute more
than $5,000 to these costs.
The complainants would not have incurred legal fees had the insurer acted fairly and in
accordance with the policy terms. Accordingly, the insurer must reimburse the complainant’s
legal fees of up to $5,000.
If the complainant has paid this amount, the insurer is to pay interest, in accordance with the
Act, from the date the amount was paid, until reimbursement by the insurer.
The complainant is to provide the insurer with proof of payment of the legal fees.
2.4 Is the complainant entitled to non-financial loss
compensation?
Yes. The panel is satisfied the insurer must compensate the complainant $4,500 for his
overall claim experience, which was less than ideal. The complainant is entitled to non-
financial loss compensation for the delay, stress and inconvenience caused by the insurer’s
handling of the claim.
AFCA can award compensation for poor claim handling
Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This
must relate to poor claims handling or other actions of the insurer which causes:
an unusual degree of stress, delay, or inconvenience, and/or
interference with a person’s expectation of enjoyment , and/or
peace of mind.
We expect complainants to be moderately robust, and we will not award compensation for the
ordinary degree of inconvenience involved in making a claim.
Insurer to pay compensation or stress and inconvenience
Having considered the circumstances and all the available evidence, the panel is persuaded
the insurer’s handling of the claim was less than ideal. The panel is satisfied the complainant
underwent considerable inconvenience and personal difficulty because of the insurer’s delays
which could have been prevented if the insurer had acted responsibly in the given
circumstances.
The panel considers the evidence shows the insurer’s handling of this claim has not been as
efficient or effective as might reasonably be expected. The panel is satisfied the insurer fell
short in not considering all matters in dispute, such as the disputed damage, the additional
Determination | Case number: 909236 Page 8 of 9
damage and the reasonable need to include an uplift to the settlement for repair costs. There
was also the additional complexity and confusion created over the inconsistent identification
of t he various structures affected which led to several variations to J’s scope of works.
Accordingly, the insurer is to pay the complainant $4,500 in non-financial loss within 14 days
of receiving notice of the complainant’s acceptance of this determinatio n.
Satisfied outcome is fair in all the circumstances
For the reasons provided in this determination, the panel is persuaded the outcome is
consistent with the applicable policy terms, the available information and a balanced
interpretation of the available evidence. Therefore, the panel accepts the outcome is fair in all
the circumstances.
Determination | Case number: 909236 Page 9 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.