Home / QBE / Determination 908831
Determination 908831
Insurer reduced settlement for fire-damaged shed under the coinsurance/underinsurance clause
Summary
A fire damaged the complainant company's hayshed and the insurer offered $114,100 on the basis of underinsurance. AFCA found underinsurance applied but to a lesser degree, and required payment of $180,404 plus interest, rejecting claims for indirect and non-financial loss.
The coinsurance clause applied, but on a fair replacement value of $300,000 and a mid-point repair cost of $217,355, giving a settlement of $180,404; consequential loss was excluded by the policy.
Issues
- Claim amount dispute primary · upheld“The $114,000 settlement proposed by the insurer is incorrect. The correct application of the clause results in a settlement amount of $180,404.”
- Delay secondary · upheld“In view of the delay since the loss occurred it is appropriate that interest be payable to the complainant.”
- Product terms interpretation secondary · not upheld“The coinsurance clause will apply because the declared value ($200,000) is less than 80% of the correct insurable value.”
Subjects and remedies
home or building damagesmall businesspay claimpay interest
Related
Text of the determination
Determination
Case number 908831
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 908831 Page 1 of 7
Case number: 908831 28 June 2023
1 Determination overview
1.1 Complaint
In February 2021 the complainant company renewed its Business Commercial Retail
Industrial Insurance policy with the financial firm (insurer). On 10 October 2021 an accidental
fire badly damaged the complainant‟s hayshed and destroyed its haybales. The insurer
accepted the claim and settled the loss of hay. For the shed, the insurer offered only
$114,100 of the total sum insured of $200,000, on the basis the shed was underinsured. The
complainant claims the full sum insured and loss of income for delay.
1.2 Issues and key findings
Is the insurer entitled to reduce the settlement amount in reliance on the policy
provisions for underinsurance?
Yes. The coinsurance/underinsurance clause will apply because the declared value
($200,000) is less than 80% of the correct insurable value ($300,000 x 80% = $240,000).
What is the correct calculation of damages payable under the
coinsurance/underinsurance clause?
The correct calculation of damages under the coinsurance/underinsurance clause
results in a settlement amount of $180,404.
Is the complainant entitled to indirect financial loss or non-financial loss
compensation?
No. The complainant is not entitled to compensation for indirect financial loss or non-financial
loss.
Why is the outcome fair?
The outcome is fair because there was underinsurance by the complainant but not to the
degree maintained by the insurer.
1.3 Determination
This determination is substantially in favour of the complainant.
Within 21 days of this determination being accepted, the insurer must pay the complainant
$180,404 and interest on this sum under the Insurance Contracts Act from 1 July 2022 to
date of payment.
Determination | Case number: 908831 Page 2 of 7
2 Reasons for determination
2.1 Is the insurer entitled to reduce the settlement amount in
reliance on the policy provisions for underinsurance?
Yes. The coinsurance/underinsurance clause will apply because the declared value
($200,000) is less than 80% of the correct insurable value ($300,000 x 80% = $240,000).
Insurer says coinsurance clause applies and reduces the amount payable
A party making an insurance claim must establish they suffered a loss that is covered under
the insurance policy. The insurer accepts the complainant suffered a loss which is covered
but says it is entitled to reduce the amount payable for the shed because the complainant
was underinsured. The insurer has the burden of proving the application of the
underinsurance provisions. In doing so it must establish the necessary facts on the balance of
probabilities (i.e. that it is more likely than not).
The policy schedule clearly advises the complainant of the risk of underinsurance (see 3.2
below) and the Policy contains a provision named a “coinsurance clause” which explains that
where there is underinsurance the insurer will only pay a proportion of the loss. The policy
provides the insurer will only pay the proportion of the loss that the sum insured bears to 80%
of the replacement cost of the shed (see 3.2 below).
The co-insurance clause does not apply when the total cost of repairs is less than 5% of the
building sum insured. In the present case they exceed 5%.
No issue arises as to the complainant having received the relevant policy documents.
In considering application of the coinsurance clause two important factual questions arise;
what is the true replacement cost of the insured property and what is the measure of the
actual loss? The parties have obtained estimates and quotes which show substantial
divergence of opinion in valuation.
The shed
The damaged shed is insured for $200,000. It has no walls and is 56 metres long, 33 metres
wide and 8 metres high. The building consists of steel sheet roofing, steel purlins and steel
roof trusses supported by steel columns and steel rod roof bracing. The volatility in the price
of steel causes some difficulty in the costings. A report dated 25 July 2022 from the insurer‟s
assessor, L finds that in the 8 to 9 months since the loss there has been a 30% increase in
the price of steel and a 5% increase in labour and other items. The complainant says the
insurer should be responsible for the effect of the delays on settlement.
The builders and experts disagree on replacement value of the shed
The complainant obtained a quote in October 2021 from a local regional builder M for
$157,050 (GST inclusive) to replace the shed. M indicated his view that replacement was the
more appropriate course. In December 2021, an engineer engaged by the insurer advised
that despite substantial damage the shed could be repaired and drafted a scope of work
accordingly. In March 2022 the insur er‟s builder P relying on that scope of work provided a
desktop estimation to repair the shed in the sum of $194,700. At the same time the insurer‟s
loss adjuster L obtained a repair quote from builder J in the sum of $240,011. L advised these
Determination | Case number: 908831 Page 3 of 7
estimates were in line with market rates. It also noted the cost estimates were provisional and
variations were likely.
I note that unless otherwise stated, the figures in this Determination do not include GST
because the complainant is registered for GST, and able to claim the GST portion of its repair
costs from the Australian Tax Office. Similarly, the settlement to the complainant does not
include GST. In its report dated 10 March 2022 L estimated the insurable value of the shed at
$300,000. Subsequently however L referred the matter to its internal quantity surveyor
section. L ‟s report dated 28 March 2022 states that L‟s quantity surveyor Q assessed a total
build cost or value at risk (insurable value) of $426,970. This figure indicates that a sum
insured of only $200,000 represents a substantial underinsurance. Q also estimated repair
costs at $202,838. The actual written report from Q is dated 17 May 2022 and gives a
replacement cost of $394,490 which still represents a substantial underinsurance.
The complainant rejects Q‟s insurable value figure as “ city based pricing ” and excessive. The
complainant has considerable experience in contracting for construction of similar sheds. The
complainant requested builder M update its quote. On 26 April 2022 M quoted a repair cost of
$142,773 and replacement or rebuild cost of $203,272. The increase in the replacement cost
was attributed to a rapid rise in steel prices. In April and May 2022, the complainant sourced
two more rebuild quotes from regional builders; H in the sum of $250,909 and A in the sum of
$254,960. Notably several of the quotes are only available for 7 days due to the volatility of
steel prices.
Insurer ’s calculation of settlement based on underinsurance
The insurer has determined the coinsurance clause applies and that the settlement figure is
$114,000 based on the following calculation:
The insurer has taken the higher value at risk figure from L‟s March 2022 report even though
Q‟s written report in May 2022 comes in at $394,490. The insur er has used the lower desktop
estimation to repair the shed in the sum of $194,700 rather than the higher repair quote from
its builder J in the sum of $240,011. L says the $194,700 is reasonable.
What is the replacement cost of the shed?
The complainant submits the replacement cost of the shed is $203,272 as per the April 2022
quotation from M. Both L and Q say the M quote is understated on the basis M has not
provided a detailed scope of works and there is no allowance for numerous additional costs
required to reinstate the property. As far as can be seen M ‟s quote contains no provision for
builder‟s margin, scaffolding, establishment costs, equipment hire, supervision, engineer
inspections, site cleaning fees and insurance. M has declined to provide a detailed
breakdown of the quote. Q‟s May 2022 report says the replacement cost is $394,490. Q is a
costing expert but is unable to be described as independent. Similarly, the complainant has
previously used the services of M for over 20 years.
I consider it likely that M‟s quote is understated. However, I am also concerned that Q‟s
replacement value may be unreliable even though it is more detailed. AFCA is required to
Determination | Case number: 908831 Page 4 of 7
take into account what is fair and the timing of the movements in the steel price need to be
considered. I do not have available the fluctuations in the steel price at the time the
complainant renewed the policy. However, the parties agree that as at the time of the loss,
the price of steel was 30% less than when Q prepared its report. Q‟s r eport does not appear
to have given consideration to this price increase or the relevant time at which replacement
cost is to be assessed for the purpose of the coinsurance clause. Some weight also needs to
be given to the fact that the regional building contractors selected by the complainant have
hands-on knowledge of their market. I have come to a view that Q‟s replacement value is
excessive. I consider a fair and proper measure of the replacement value is the estimate of
$300,000 reached by L in its report dated 10 March 2022, before Q was consulted.
Based on this replacement cost/insurable value, the coinsurance clause will apply because
the declared value ($200,000) is less than 80% of the insurable value ($300,000 x 80% =
$240,000).
2.2 What is the correct calculation of damages payable under
the coinsurance/underinsurance clause?
The correct calculation of damages under the coinsurance/underinsurance clause results in a
settlement amount of $180,404.
The insurer has underestimated the repair cost of the shed
I accept from the evidence that the shed is repairable. I accept the insurer‟s submission that
M has underestimated the pricing. The complainant‟s other builders did not provide repair
quotes. I do not think it reasonable that the insurer seeks to rely on its lowest quote. It is fair
that the repair cost be based on the midpoint between J‟s assessment of $240,011 and P‟s
assessment of $194,700. This produces a figure of $217,355.
The coinsurance clause calculation
In the present case the repair costs figure of $217,355 exceeds the sum insured. A reduction
for underinsurance will commonly be applied to repair costs as adjusted (or capped) by the
sum insured, as opposed to the actual repair cost. However, by letter dated 16 June 2023 the
insurer has stated „ [w]e have considered the PDS and the wording does not indicate the
underinsurance reduction applies to repair costs as adjusted to sum insured , as opposed to
just the repair cost . ‟ Accordingly based on the above findings the coinsurance calculation is
as follows:
Settlement Method Settlement Calculation
80% of Asse ssed Insurable
Value
0.80 x $ 3 00,000 = $ 240,000
Co - Insurance
Sum Insured % of 80% of
asse ssed insurable value x
repair cost = co - insurance
settlement liability
$200,000 over $240,000 = 83%
83 % x $217,355 = $180,404
Determination | Case number: 908831 Page 5 of 7
Insurer must increase settlement offer and pay interest
As a result, the $114,000 settlement proposed by the insurer is incorrect. The correct
application of the clause results in a settlement amount of $180,404. In view of the delay
since the loss occurred it is appropriate that interest be payable to the complainant. The
assessment of the loss was not straightforward, but in my view should have been capable of
being settled by June 2022 at the same time as the loss of hay. Interest under the Insurance
Contracts Act should run from 30 June 2022 to date of payment.
2.3 Is the complainant entitled to compensation for indirect
financial loss or non-financial loss?
No. The complainant is not entitled to compensation for indirect financial loss or non-financial
loss.
Complainant is not entitled to indirect financial loss compensation.
The complainant has sought compensation for the delays which have occurred including the
cost of hiring a replacement shed to store hay during the harvest season. No particulars of
the amounts involved are provided. In any event however, the policy excludes consequential
losses of this nature (PDS page 43). Further the complainant did not elect to take out the
business interruption cover available under the policy.
There is no material to support an award of non-financial loss compensation.
AFCA can award compensation up to $5,400 for non-financial loss. This must relate to poor
claims handling or actions of the insurer which cause an unusual degree of stress, delay, or
inconvenience. Complainants are expected to be moderately robust. There is no material
available to support an award of non-financial loss compensation to the complainant
company.
2.4 Why is the outcome fair?
Outcome is fair in all the circumstances
The outcome is fair because there was underinsurance by the complainant, but not to the
degree maintained by the insurer.
Determination | Case number: 908831 Page 6 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. I have reviewed and considered
all the information the parties have provided.
While the parties have raised several issues in their submissions, I have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 908831 Page 7 of 7
3.2 Relevant Policy Terms
POLICY WORDING
Insurance Schedule
PDS – Page 15 of Policy
Co-insurance
For each occurrence, we will pay the proportion of the loss or damage that the sum insured
bears to 80% of:
(a) the reinstatement or replacement cost of the business property where the
method of settlement is reinstatement or replacement cost; or
(b) the indemnity value of the business property, on the day the loss or damage
occurs where the method of settlement is indemnity value.
This condition will not apply if the amount of loss or damage is less than 5% of the sum
insured.
Example:
The sum insured is declared at $1,000,000.
Property damage totalling $500,000 occurs from an event covered by the
Policy.
The insurable value of such property at the commencement of the period of
insurance is actually $2,500,000.
Coinsurance applies because the declared value is less than 80% of the
insurable value calculated in accordance with the basis of settlement.
In this example we would pay only $250,000 of your damage less any excess
that has to be paid.
Claim Payment = $1,000,000 / ($2,500,000 x 80%) x $500,000 = $250,000
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.