Defective repairs by insurer's repairer and extent of rectification and cash settlement
Text of the determination
Determination
Case number 908274
Financial firm AAI Limited
Case number: 908274 24 April 2024
Determination | Case number: 908274 Page 2 of 9
1 Determination overview
1.1 Complaint
The complainant lodged a claim with the financial firm (the insurer) in July 2018, for damage
caused by a storm. The insurer accepted the damage and organised repairs. Numerous
defects and issues were observed with the repairs.
The insurer agrees the defects require rectification. However, a dispute has arisen over the
extent of rectification works the insurer is liable for.
1.2 Issues and key findings
What is a fair resolution to this complaint?
The claim has been ongoing since 2018. During this time, there has been considerable back
and forth between the parties causing a breakdown in the relationship.
Given the prolonged nature of this issue and the current relationship between, the panel
considers it is in the best interest of both parties the claim is cash settled.
What is the extent of the insurer’s liability?
The insurer is required to comply with the provisions of this determination.
Is the insurer liable for temporary accommodation costs?
Yes. The complainant is entitled to temporary accommodation costs in accordance with the
provisions of this determination.
Is the insurer required to cover th e complainant’s project management costs?
No. The insurer is not required to pay these costs.
Is the complainant entitled to further compensation for non-financial loss?
No. The insurer is not required to pay compensation for non-financial loss.
1.3 Determination
This determination is substantially in favour of the complainant.
Within 14 days of the complainant’s acceptance of this determination the insurer is to cash
settle the complainant the amount of $226,421.20.
Determination | Case number: 908274 Page 3 of 9
2 Reasons for determination
2.1 What is a fair resolution to this complaint?
Complaint involves prolonged dispute
This complaint relates to a dispute regarding the quality of repairs completed by the insurer’s
repairer, JLG from the accepted claim in July 2018.
The insurer acknowledges the need for further rectification work as a result of the faulty
repairs. The parties dispute what is required to rectify the defects and issues and progress
has been limited.
The insurer says it complied with the AFCA determination and organised a comprehensive
repair audit report from QT to address the complainant’s concerns. It says it was unable to
provide an updated scope of works following the QT report as the complainant has failed to
cooperate with the process, causing substantial delays.
To progress the claim, the insurer offered $71,063.45, to allow JLG to attend on site to scope
for repairs.
The complainant disagrees with the settlement amount and has raised concerns over the
insurer’s handling of the claim. The parties are at an impasse.
Claim to be cash settled
The claim has been ongoing since July 2018. Issues with quality of workmanship, credentials
of assessors, inspectors, a safe work method request and the complainant denying access to
the property have all delayed settlement.
Having reviewed the exchanged information, the panel is of the view that the relationship
between the parties has irretrievably broken down and it would not be fair, reasonable or
practical to expect or require the parties to work together in any efficient or satisfactory way.
The panel considers the best possible solution to bring finality to the claim and complaint is a
cash settlement. This will allow the complainant to choose his own builder with credentials he
is satisfied with and have more direct involvement with the process as desired.
2.2 What is the extent of the insurer’s liability?
Experts agree roof installation defects are extensive
The complainant raised concerns with the quality of how the roof sheets were installed and he
requested that the entire roof be replaced.
Building consultants QT, in its report dated 9 April 2021, observed numerous areas with
defects in the installation of the roof sheets and flashing including:
damage to the sheets, and paint touch ups to conceal the damage
damage to the sheets left untouched
pushing ridge capping down to flatten before screw fixing causing ridge scraping against
the ridges of the corrugations of the sheets
poor application of sealants where capping and flashing overlap around items penetrating
the roof
some screws overtightened and rubber sealing washers missing on others.
Determination | Case number: 908274 Page 4 of 9
The QT report noted the poor workmanship was evident across the entire roof and
recommended all the roof sheets be replaced as the same colour sheet may likely not be
available.
Builder OI, in its report dated 9 July 2023, agreed with QT ’s findings and additionally identified
issues with flashing installation.
Insurer required to cover the cost for full roof replacement
The insurer agrees there are extensive defects due to poor installation. This is further
acknowledged in the BC desktop review of both the insurer’s and the complainant’s report.
The scope of works provided by the insurer’s builder MM, dated 27 May 2022, has only
allowed replacement for 150m2 of the total roof area of 364m2. It says it can rely on the
policy terms and conditions to limit its liability to the damaged areas (only).
There is no dispute the identified defects are a result of poor installation methods undertaken
by JLG and are widespread across the entire roof. The roof was initially installed sometime in
2019. Given the time passed, it is likely the same colour sheets are no longer available.
When an insurer elects to repair insured damage, it guarantees the material used and the
standard of the workmanship (to be free of defects and in accordance with industry
standards). It also bears the responsibility to rectify the defects should any emerge as a result
of the poor quality of workmanship or use of incorrect materials.
In this instance, it is evident the defects are clearly a result of poor workmanship. They are
not pre-existing, and no other factor has contributed towards this.
Given the extent of poor workmanship it is reasonable the entire roof is replaced so all the
defects identified by both pa rties’ experts can be remediated accordingly. Further, the panel
considers it would not be reasonable for the complainant to end up with a mismatched roof
due to faulty workmanshi p from the insurer’s repairer s.
Accordingly, the panel considers it fair that policy limitations and conditions to only repair the
damaged parts of the building do not apply, and (that) the insurer is required to cover the cost
to replace the roof.
Satisfied complainant’s quote is reasonable
The complainant has provided a quote from SS in January 2024, of $65,000 being the cost
for full roof replacement and associated works. The panel agrees the insurer should pay
$65,000 to the complainant to cover the cost of full roof replacement.
Complainant says the ceiling height was altered without consent
The complainant says his property had higher than standard ceilings, which was accounted
for in the insurance repairs building contract. He says JLG reduced the ceiling height without
him being notified of this change and he is seeking for the insurer to cover the cost of bringing
the ceiling height to its pre-loss specifications.
The complainant provided the drawings of the original floor plan and an excerpt from his
original contract tender which show the ceiling height for internal areas was 2740mm.
The OI report notes the height after allowance for the ceiling linings, floor boards, tiles, the
finished floor to ceiling height should not be less than 2700mm. Further the report states the
Determination | Case number: 908274 Page 5 of 9
difference in the height in the internal areas on average to be 2658mm (42mm short) and
considers it as non-compliant with significant works required.
The complainant is seeking the insurer covers the cost of $65,000, as per the SS quote to
bring the internal ceiling height to 2700mm.
Insurer says the difference is within tolerance and compliant
The insurer says it is not liable to cover the cost of bringing the internal ceilings height to
2700mm because it is compliant with the building codes, on the basis it is within acceptable
tolerances.
It relies on its experts’ advice to support its position.
QT, in its report, notes the three locations to measure the floor to ceiling height and found:
in the master bedroom, the height is 2694mm,
in the ensuite, it is 2671mm, and
in the entry hallway, it is 2969mm.
The insurer says that all 3 measurements fell within the accepted range in relation to the
reduction of the ceiling height by 30mm.
Builder MM, in a desktop review, acknowledged the difference in the height, however,
maintained it did not impact the functionality of the ceiling and that it met the current building
code.
MM, said the use of battens in the repair may have caused the change in the ceiling heights,
the use of battens was the correct, most stable repair method. Engineer MCS, was of the
view that the construction dimension of 2740mm is used by builders/carpenters for wall
framing dimensions only and do not apply to finished internal dimensions.
Increasing the internal ceiling is required
The panel is satisfied that there is a difference in ceiling height following the insurer’s repair
work. However, the insurer maintains that the dimensions are complainant with code and
standards.
Based upon the exchanged material, the panel is satisfied that the complainant has
established the height of the ceiling prior to the loss and that the insurer was told what the
ceiling height should be. Its repairer installed ceilings that were measurably lower.
In the panel’s view, the insurer’s obligation is to return the complainant to the position he was
in prior to the loss, not simply to comply with code and standards.
There is no challenge to the quotation of $65,000 and the insurer is to cash settle this aspect
of the claim for that amount.
Insurer must cover additional cost of electrical compliance work
An inspection completed by electrician PE, refers to the various defects identified during the
inspection and the requirement (of the electrical compliance certificate) to detail the works
carried out. The MM scope provided by the insurer does not include any allowance for these
works nor does the insurer disputes that it is required.
The SS quote includes provision for higher costs for replacement of heating unit cover and
assessing the leak in the ensuite above the vanity.
Determination | Case number: 908274 Page 6 of 9
The insurer is to allow $3,000 for electrical work.
Insurer must cover additional cost of ceiling above the vanity
The panel notes that while the QT report includes these defects, it only allows for minimal
costs and does not include repair for the internal ceiling, plastering or mould removal. The
panel considers these costs should be covered as the internal damage to the ceiling (in the
ensuite above the vanity) is evidently from a roof leak either from the roof or from the heating
unit itself and needs to be assessed and repaired.
The insurer is to allow $4,500 for these repairs.
Insurer must cover cost to rectify defective window tinting
The complainant is seeking the cost to remove the existing tint on the master bedroom
window and to replace it to the pre-loss condition. The complainant has provided emails from
JLG to show the window was tinted twice as part of the scope of works.
QT in its report states the repairs did not include any works to the master bedroom window,
however the panel is satisfied this is incorrect.
The photographs submitted by the complainant and the OI report confirms the window tinting
completed is defective.
The insurer is to allow $6,309 for the roof tinting.
Box guttering and capping
The plumber ER advised that the work was of poor quality and there was a need to replace
both the capping and the box guttering. Based upon the exchanged material the panel is
satisfied that the box guttering is non-compliant, including having large gaps, areas of
incorrectly applied glue/silicone, as well as empty screw holes, resulting in leaking.
The insurer is to allow $5,849.25 as provided for in the variation from JL, regarding the box
guttering and capping.
2.3 Is the insurer liable for temporary accommodat ion costs?
The complainant is seeking for the insurer to cover the cost of temporary accommodation and
storage for 70 days. The panel notes extensive works at the property will be required to rectify
the defects. During this period the property cannot be occupied.
The complainant has provided a quote for a three-bedroom apartment and removal/storage of
contents for 12 weeks. Based on this quote, he is seeking $32,830 for accommodation and
$14,400 for contents removal and storage.
The insurer agrees the property requires significant repairs and temporary accommodation
will be required.
Given the exchanged material, the panel is satisfied that an allowance of 12 weeks for repairs
is fair and reasonable.
The insurer is to allow $47,230 for temporary accommodation and storage.
While this figure exceeds the policy limit for temporary accommodation, given the passage of
time and contribution of the insurer’s trades’ poor workmanship, the panel is satisfied that the
figure is fair and reasonable.
Determination | Case number: 908274 Page 7 of 9
2.4 Is the insurer required to pay the project management
costs?
Complainant says he should be paid for project management
The complainant says the initial timeframe for repairs was 12 weeks, but it took the insurer
more than a year to complete the repairs due to the use of unqualified workers, poor
workmanship and lack of supervision. He says he will have to take time off from his work and
be present on site to ensure the project is managed well.
Insurer is not required to pay the complainant project management costs
The panel acknowledges the repairs at the property have been defective, however, the
proposed cash settlement will allow the complainant to engage his own builders as per his
requirements. Organising his own trades will provide him the opportunity to have the
information before the repair commence.
If the complainant wants to be part of the project, he can do so at his own volition. However,
the insurer is not required to cover these costs.
2.5 Is the complainant entitled to further compensation for non-
financial loss?
AFCA can award compensation for poor claim handling
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss
(capped at $5,400) where the insurer’s actions have caused an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or peace of mind.
Insurer is not required to pay compensation for non-financial loss
The complainant says the unusual time the claim has taken and the inability to
progress/resolve it has caused him immense stress and impacted his personal life. He says
the insurer did not provide the required reports to QT prior to its expert attending the site,
which led the report to be biased.
The panel acknowledges the claim has not progressed in a timely manner however, the panel
notes that since the previous determination was issued the complainant’s reluctance in
providing on site access to the insurer, has contributed to delays.
AFCA awards compensation conservatively. It expects complainants to be moderately robust
in relation to claim delays and complications. It only awards compensation when the
complainant has suffered inconvenience, experienced delays or interference with their
reasonable expectations because of the insurer’s error or mishandling of the complaint. We
can reduce or elect not to award compensation when the complainant’s conduct has
contributed to the situation.
Further, the complainant was previously awarded $3,000 non-financial loss compensation.
This is not insignificant.
The insurer is not required to pay further compensation for non-financial loss.
Determination | Case number: 908274 Page 8 of 9
What is the extent of the insurer’s liability to the complainant?
The insurer is to cash settle the complainant $196,888 to cover the cost of repairs.
To this amount, the insurer is to add a 15% uplift to account for the transfer of risk and the
discovery of as yet unknown costs.
The total cash settlement required to fi nalise the insurer’s ob ligations to the complainant is
$226,421.20 , and the insurer is to pay this amount within 14 days of the complainant’s
acceptance of this determination.
2.6 Why is the outcome fair?
The outcome is fair because it is consistent with the exchanged information and the rights
and obligations of the parties.
Determination | Case number: 908274 Page 9 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.