Home / AIG Australia Limited / Determination 908261
Determination 908261
Water damage claim settlement amount and excess
Summary
The complainant, an owner of units in a strata building, claimed for water damage and was settled less a $10,000 excess. AFCA found the insurer must add a 15% contingency uplift of $3,741.81 but rejected claims about the excess, delay and loss of rent.
The settlement lacked a contingency uplift for transfer of risk and loss of repair guarantee, while the policy excess applied and the insurer could not be compelled to waive it.
Issues
- Claim amount dispute primary · upheld“Whilst the original offer was accepted by the complainant, it did not compensate him for the transfer of risk... the insurer increases the settlement by 15% to include a contingency uplift.”
- Claim denial secondary · not upheld“The insurer is not required to waive the excess and cannot compel any other party to pay it.”
- Delay secondary · not upheld“I am not satisfied the insurer unduly delayed the claim.”
Subjects and remedies
related party investmentsmall businesspay compensation
Related
All AIG Australia Limited determinations · Find similar determinations
Text of the determination
Determination
Case number 908261
Financial firm AIG Australia Limited
Determination | Case number: 908261 Page 1 of 6
Case number: 908261 19 May 2023
1 Determination overview
1.1 Complaint
The complainant is an eligible beneficiary under a strata insurance policy held in the name of
the Body Corporate (BC). The policy is underwritten by the financial firm (insurer). The policy
covers more than 100 residential units and one commercial unit.
The complainant owns at least two units in the building. He lodged a claim with the insurer for
water damage to one of the tenanted units. This damage was caused by pipes leaking from
the unit above.
The insurer accepted the claim. It sought payment of the policy excess from the BC and/or
the owner of the unit above. Both refused to pay. The insurer later settled the complainant for
the assessed cost of the damage, less the applicable policy excess ($10,000).
The complainant believes this is unfair. He does not have enough money to conduct repairs.
He also says the quote is not sufficient and the claim was unnecessarily delayed.
1.2 Issues and key findings
Is the insurer required to increase its settlement offer?
Yes. Whilst the original offer was accepted by the complainant, it did not compensate him for
the transfer of risk, any loss of a repair guarantee or minor additional work. It is therefore
appropriate that the insurer increases the settlement by 15% to include a contingency uplift.
As the claim is made under the policy, an excess applies. The insurer is not required to waive
the excess and cannot compel any other party to pay it.
The insurer is not required to pay loss of rent as the unit remained habitable and occupied.
Why is the outcome fair?
The insurer ’ s offer was based on a viable building quote. There is no persuasive evidence the
builder would not conduct the work. It is appropriate that a contingency uplift be paid to
compensate for the transfer of risk and loss of a repair guarantee. This will also cater to any
minor additional work required to repair the damage. As the complainant is claiming under the
terms of the policy, it is fair that an excess applies.
1.3 Determination
This determination is substantially in favour of the insurer.
The insurer is required to add a 15% contingency uplift to the scope of the settlement. Based
on the original full repair allowance ($24,945.42), this is $3,741.81.
Unless there is substantive additional damage found when the work is undertaken, the insurer
is not required to pay any further amounts in relation to this complaint. If substantive
additional work is required, the complainant may contact the insurer and have this reviewed.
Determination | Case number: 908261 Page 2 of 6
2 Reasons for determination
2.1 Is the insurer required to increase its settlement offer?
Yes. Whilst the original offer was accepted by the complainant, it did not compensate him for
the transfer of risk, any loss of a repair guarantee or minor additional work. It is therefore
appropriate that the insurer increases the settlement by 15% to include a contingency uplift.
As the claim is made under the policy, an excess applies. The insurer is not required to waive
the excess and cannot compel any other party to pay it.
The insurer is not required to pay loss of rent as the unit remained habitable and occupied.
Complainant unhappy with insurer’s resolution of the claim
The complainant says on or about 16 December 2021 his tenants found water was leaking
from above the ceiling of his unit and flooding the ceiling space.
A claim was lodged. Investigations confirmed there was a pipe leaking from the unit above.
The insurer accepted the claim and ascertained what it considered was a fair estimate for the
cost of repairs. A dispute arose as to who had to pay the policy excess of $10,000. The
complainant refused as he considered he was not liable for the damage. The BC and the
owner of the unit above would not pay the excess either.
Faced with an impasse, the insurer agreed to settle the complainant directly, less the excess
amount. This meant it prepared a ‘Form of release’ document for the complainant to sign in
exchange for payment of $14,945.42. This amount was based on $24,945.42 for the cost of
repairs, less the policy excess of $10,000. This release form was signed on 30 August 2022
and the settlement payment made soon after.
The complainant believes the insurer’s settlement was unfair, as:
he should not be liable to pay the excess as he was not responsible for the damage and
this amount should be added to the settlement
the settlement paid is not sufficient to repair the damage to his unit, noting he has been
unable to get anyone to repair the damage for the quoted amount
he believes there is unseen damage which may substantially increase the repair costs
the insurer has taken too long to resolve the matter.
He believes the insurer should have conducted the necessary repairs and claimed the excess
from the BC directly. He also seeks cover for loss of rent incurred through the delays with the
resolution.
Policy covers accidental damage subject to conditions and exclusions
The insurer’s policy is made up of the Renewal Schedule and the Product Disclosure
Statement (PDS). There is no dispute the insurer sent these documents to the BC.
Whilst the complainant is a unit owner and an eligible beneficiary under the contract, there is
no onus on the insurer to provide the policy documents to him directly.
The policy covers accidental loss or damage at the property, subject to the terms, conditions
and exclusions of the policy. For certain water damage claims, the policy imposes a $10,000
excess, which is detailed in the Renewal Schedule:
Determination | Case number: 908261 Page 3 of 6
Water damage and/or Resultant Water Damage from every bursting, leaking,
overflowing of pipes and/or apparatus $10,000
I accept an excess of $10,000 applies to the complainant’s claim.
Complainant is not bound by signed agreement
It is not in dispute the complainant signed a deed of release for the payment of settlement
money from the insurer.
He signed this release agreement on 30 August 2022 to accept payment of $14,945.42. The
insurer says the complainant should be bound by the terms of this agreement and there are
no grounds for further negotiation.
For reasons that are unclear, the release was made out to the BC, not the complainant. The
BC was not involved in the settlement, despite being the insured party. There is no
suggestion the complainant had the BC’s authority to sign on its behalf.
The parties also agree (from insurer’s letter of 2 September 2022):
Should any further damages be identified during the repair process, the
[complainant] is entitled to submit a variation for the [insurer’s] consideration.
I am satisfied the intent of the release was for the parties to confirm the proposed settlement
of the claim. Howeve r, the document should not have been issued in the BC’s name and
there is no persuasive evidence the complainant had authority to sign on its behalf.
Therefore, I consider the issues relevant to the claim may be subject to review. These include
the payment of the excess, the amount payable for the claim, who conducts the repairs, the
time taken to resolve and consideration for loss of rent.
Insurer cannot compel BC to make payment of the excess
Whilst BC is the insured party to the contract and the complainant is merely a beneficiary, his
ability to claim under the contract means he is subject to its terms.
The PDS confirms the excess is an amount which must be contributed to any claim that is
made. The Renewal Schedule confirms the amount applicable to this claim is $10,000.
Therefore, I accept an excess of $10,000 is applicable to the claim.
Whilst the complainant says he was not at fault and should not have to pay the excess,
responsibility for the loss is not a consideration under the policy. I acknowledge the excess
may be paid by anyone insured under the policy (including the BC or the other unit owner),
however the insurer does not have to power to compel its payment. Neither does AFCA.
In the circumstances, the insurer’s decision to pay the claim, l ess the excess, was fair. This
ensured it paid (what it thought to be) its maximum liability under the policy. I am satisfied the
insurer is not required to waive the excess.
The complainant took separate action against BC, seeking an order that it pay the excess. I
accept any such order in his favour is beyond the scope of AFCA’s jurisdiction or this
determination.
Determination | Case number: 908261 Page 4 of 6
Basis for original settlement offer is reasonable
The insurer’s settlement was based on a scope of works prepared by JL for $23,149.42. This
quote was prepared on or about 3 June 2022, after a site visit on 6 May 2022.
The subsequent settlement was based on a repair price of $24,945.42. It is not clear how the
insurer calculated this increased amount.
In correspondence with the insurer, JL offered to hold its quote price for 30 days and its price
for materials for up to 60 days. This implies JL was willing to undertake the work, although
both dates had passed by the time the release was signed (30 August 2022).
Based on this, I consider the amount offered at the time of the settlement was likely fair.
The complainant says he should be entitled to at least two, if not three, quotes for
comparison. There is no legal requirement for this (particularly not as the insurer agreed to
cover the cost, less the excess). Allowance was also given for possible additional costs.
The complainant later obtained a comparison quote from builder HA for $53,856. This quote
does not mean the JL quote is unfair or unreasonable. The fact that HA may charge a higher
amount is not evidence the JL quote is not viable.
The HA quote was later withdrawn. HA confirmed it would not undertake the repairs.
I am satisfied the basis for the JL quote was reasonable. It apparently was prepared to
undertake the work for the quoted price and the insurer was prepared to consider any
additional costs which arose.
Insurer must add a contingency uplift to the settlement
I acknowledge the supply and labour costs to repair the property may have increased since
the settlement was offered. I am not satisfied the insurer bears any responsibility for this. The
complainant accepted the proposed offer, presumably with the intent of arranging another
repairer to undertake the work. It is not the insurer’s f ault this has not occurred.
Noting it relied on a cash settlement to resolve the claim, I consider the insurer should have
included a contingency uplift. Given the scope of works, the possibility of unseen damage and
the possibility of minor additional work, I am satisfied a contingency uplift of 15% is fair.
This amount must be based on the total estimated repair cost of $24,945.42. This means the
insurer is liable to pay an additional $3,741.81 to settle the claim.
Unless the complainant undertakes the repairs and finds a substantive additional amount of
damage that has not been quoted, I am satisfied this offer is sufficient to resolve the repair
issue. If a substantial amount of additional damage is found, the complainant must contact
the insurer and permit it the opportunity to review and ascertain its worth and the extent of
coverage.
Satisfied the insurer is not responsible for delays with claim
I am not satisfied the insurer unduly delayed the claim. The major issue that has prevented
repairs being undertaken appears to be the concern over payment of the excess. This is not
the insurer’s fault.
I empathise with the complainant’s position that the excess is a considerable amount and he
does not believe he should be liable for any costs. This is an issue he must resolve between
himself, the BC and/or the other unit owner. It is not an issue for the insurer.
Determination | Case number: 908261 Page 5 of 6
Given this, I am not satisfied the insurer unduly delayed the claim. I acknowledge there have
been some issues, however it is clear the complainant was prepared to settle at the time he
signed the release form. If he had engaged JL to undertake the repairs at that time, I consider
there would not have been a delay except due to the complainant’s need to find another
$10,000.
As I am satisfied this is not the insurer’s responsibility, I accept the insurer is not responsible
for any unreasonable delays.
Insurer is not liable to cover any loss of rent
The complainant also seeks cover for loss of rent incurred for the duration of the claim. He
notes that he had to charge the tenants less to stay in the property because of the ongoing
water issues.
The insurer’s policy covers an ‘amount equal to the rent lost’ where a unit:
> becomes uninhabitable or unfit for its intended purpose as a result of an Incident
covered under Section 1 of the Policy; or
> access to the Building is prevented as a result of an Incident covered under
Section 1 of the Policy or physical loss or damage to property immediately
adjacent to the Situation […]
The policy does not define ‘uninhabitable’ or ‘unfit for occupation’ . The insurer considers this
to be where the unit cannot be secured against the elements or where an occupant is without
necessary utilities to safely reside there. I accept these explanations are consistent with the
terms, however I acknowledge there might be other situations where this is applicable too.
Broadly, I accept a home is ‘uninhabitable’ or ‘unfit for occupation’ when it is not reasonably fit
or able to be lived in. Noting the tenants stayed after the loss and the complainant says he
was charging them a lesser rental fee, I accept the home was not uninhabitable.
No specific evidence of this lesser fee was provided. There is also no specific evidence they
moved out or were inconvenienced by this loss, or to what extent. Given this, I am satisfied
the insurer is not liable for paying any loss of rent.
Determination | Case number: 908261 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.