Home / Hollard / Determination 908149
Determination 908149
Insurer declined cover for external storm damage (retaining wall, deck, paving) relying on exclusion for inherent defects and faulty workmanship
Summary
The insurer declined cover for external storm damage to a home, citing defective construction of retaining walls. AFCA found the storm caused the damage, required the insurer to accept and settle the claim, and awarded $1,000 for non-financial loss.
The complainant established a prima facie claim from a storm, and the insurer failed to prove the inherent defect/faulty workmanship exclusion applied.
Issues
- Claim denial primary · upheld“The insurer has not established the policy exclusion on which it relies applies to the circumstances of the loss.”
- Inadequate claim investigation secondary · upheld“insurer's engineer did not attend the site to investigate the cause of the damage until 6 months after the loss”
- Delay secondary · upheld“almost 6 months before the insurer's engineer inspected the property after the claim was lodged”
Subjects and remedies
home or building damagenatural disasterpay claimpay non financial lossrepair or rectify
Related
Text of the determination
Determination
Case number 908149
Financial firm The Hollard Insurance Company Pty Ltd
Determination | Case number: 908149 Page 1 of 6
Case number: 908149 27 September 2023
1 Determination overview
1.1 Complaint
The complainant lodged a claim under his home insurance policy held with the financial firm
(insurer) for damage to his property caused by a storm in March 2022.
The insurer assessed and partially accepted the claim. It accepted cover for contents damage
and internal painting and plastering. However, the insurer declined cover for the external
damage including the retaining wall, timber deck and concrete paving and building movement
(the disputed damage).
The insurer appointed an engineer who considered the disputed damage arose from
defective construction of the timber retaining walls, which is what caused the movement.
The complainant disagrees with the insurer’s decision. He says the retaining walls around the
house filled up with an abnormal amount of water and the damage was new and occurred
due to the storm event. He wants the insurer to cover the cost of repairs for the disputed
damage.
1.2 Issues and key findings
Is the insurer liable for repairing the disputed damage?
Yes. The insurer is liable for the disputed damage. This is because the available information
shows the insured storm event was the proximate cause of that damage and the insurer has
not established the policy exclusion on which it relies applies to the circumstances of the loss.
Is compensation for non-financial loss warranted?
Yes. It was almost 6 months before the insurer’s engineer inspected the property after the
claim was lodged. In the meantime, the damage was severe and potentially developing
further, with implications for the complainant’s safety in his home . It is understandable that he
has experienced significant upset as a result of the time taken by the insurer to investigate
and then reach a final claim decision based on those investigations. Compensation of $1,000
is warranted in the circumstances.
Why is the outcome fair?
The insurer has not established the damage being claimed should be excluded because of
construction issues, as it has submitted. The insurer has not argued the application of any
other exclusion. It would not be fair for the insurer to decline cover in those circumstances.
1.3 Determination
This determination is in favour of the complainant. The insurer is required to pay the
complainant $1,000 compensation for non-financial loss and accept and settle the claim for
the disputed damage, as set out in section 2.1.
Determination | Case number: 908149 Page 2 of 6
2 Reasons for determination
2.1 Is the insurer liable for repairing the disputed damage?
Yes. This is because the available information shows the insured storm event was the
proximate cause of the disputed damage and the insurer ’s evidence and submissions do not
establish the application of the exclusion on which it relies in seeking to decline cover.
Complainant has onus to establish a valid claim
It is established insurance law that the complainant has the onus to establish, on the balance
of probabilities (that is more likely than not), that the loss or damage falls within the scope of
cover under the policy. This is commonly known as a prima facie claim.
The complainant ’ s policy provides cover for defined insured events, with optional cover for
accidental damage. The certificate of insurance (COI) confirms the complainant did not take
out this optional cover. This means the policy responds where one or more of the insured
events listed in the policy causes damage to the property. That cover, is however, subject to
terms, conditions and exclusions.
Complainant says damage occurred following the storm
On 11 March 2022, the complainant lodged the claim for damage to the external and internal
areas of his property. The complainant says there is damage to the retaining wall, timber deck
and concrete paving area, with associated movement (the disputed damage).
The insurer accepts damage to the contents was attributable to the storm event. It paid the
amount of $33,200 (the policy limit for contents). The insurer also settled the amount of
$8,890.98 for the internal damage in the downstairs of the property.
However, the insurer says the disputed damage is the result of the defective construction of
the retaining walls. The insurer relies on the general exclusion for ‘loss or damage caused by
or resulting from… inherent defects, structural faults, faulty workmanship or faulty design ’ to
decline cover for the disputed damage.
The complainant maintains the storm event caused the disputed damage. He says there was
water coming through the ceiling and wall of the lower sections of the house, and the
retaining wall and deck have moved closer towards the house.
The insurer’s builder, JL, attended the property on 22 March 2022. JL ’s report identified the
water ingress point through the brick wall in the lower section of the house, that is a retaining
wall to the front of the property. JL says there is insufficient drainage to the property and
water is leaking through this area on a consistent basis when rain is heavy.
The insurer’s engineer, SW, attended the property on 10 August 2022. SW ’s report and
photographs confirm the disputed damage at the property.
Complainant has established a prima facie claim
There is no dispute a significant storm event occurred and damaged the property. The panel
is satisfied the complainant has established a prima facie claim for damage from an insured
event.
That means the onus shifts to the insurer to show, on the balance of probabilities, a policy
exclusion applies or that it is otherwise entitled to deny the claim.
Determination | Case number: 908149 Page 3 of 6
Experts say the storm event was not the cause of the disputed damage
Builder JL says the disputed damage is the result of maintenance and building issues and not
from a single insured event. However, in the same report, JL answered ‘No’ in response to
the question ‘Are There M aintenance Issues Present? ’.
As well, while JL said there was an ‘insufficient amount of drainage to the property’, they
based that on a ‘visual inspection’ and not an invasive investigation. It is not clear from the
accompanying photos what drainage was/was not in place in respect of the retaining walls
specifically. The panel is not satisfied the evidence shows either a lack of drainage, or that
any such lack ‘ caused the water to erode the footings over the years ’, as JL suggests .
Engineer SW said ‘ It is evident that the construction of the deck and concrete pavement relies
on the support of the soil which is retained by the adjacent timber retaining walls’. SW goes
on to say the gradual failure of the retaining walls has allowed soil mobilisation and erosion to
occur, which has caused the deck and concrete pavement to gradually rotate and move. SW
says the underlying cause of the movement and failure is due to inherent design and
construction issues of the retaining walls, which are supporting the subgrade material below
the deck footings and concrete pavement. SW concluded the damage was unrelated to any
one-off insured event.
While SW stated that the timber retaining walls ‘have gradually rotated and failed’, the panel
is not satisfied the available evidence shows that any movement or loss of
stability/functionality was ‘gradual’. There is no persuasive information to show the retaining
walls had previously experienced significant or any movement. Instead, we have photographs
of the walls and surrounding areas taken some time after the storm, during which period it is
reasonable to assume further movement may have occurred in addition to that initially
triggered by the storm event, given the already compromised area.
No evidence the cited building standards applied as at the date of construction
SW has said the underlying cause of the movement and failure is due to inherent design and
construction issues with the retaining walls. They cited building standard AS 4678-2002.
However, it is not clear if this standard was applicable at the time the property itself or
retaining wall was constructed. SW estimated that the property was built in 1984 but did not
cite relevant building standards applicable in or prior to that year. SW concedes it is unable to
determine the age of the property without access to plans related to the construction of the
dwelling or retaining walls. They acknowledge the construction of the retaining wall would
have pre-dated the first editions of the Building Code of Australia and AS 4678-2002.
In a supplementary report dated 19 December 2022, SW provided an excerpt from a 1964 US
publication for engineering and design for retaining walls. Based on this, SW says the
retaining wall design methods have remained largely unchanged from prior to the time of its
construction. They also say the retaining walls should have complied with general
engineering principles.
However, having regard to all the available evidence, the panel is not satisfied the insurer has
shown the exclusion for inherent defects, structural faults, faulty workmanship or faulty design
has been shown to apply to the retaining walls, which appear to have functioned as required
for decades up until the storm event.
Determination | Case number: 908149 Page 4 of 6
Insurer liable for the disputed damage
The panel is satisfied the storm has caused the disputed damage. This is consistent with the
following:
there is no dispute there was a substantial storm and wind event on or about the date of
the reported damage
the movement and damage were identified only recently and following the storm
if movement and failure of the retaining wall was due to inherent design and construction
issues, then it is not clear why such substantial damage was not previously evident or
recorded since construction of the property/retaining walls (likely to have been about 40
years ago).
Whilst the design and construction of the retaining walls may have meant the retaining wall
was in some way vulnerable to the effects of a significant storm event, that in itself does not
mean the exclusion applies. The insurer has not established just what building standards
applied at the time of construction, and so the panel cannot be satisfied that the retaining
walls were non-compliant, defective or otherwise poorly constructed.
Even if the retaining wall was found to have been gradually failing (which has not been
established), this also does not engage the exclusion for inherent defects or faulty
workmanship. This is because this exclusion relates to the construction of the wall, rather
than its current condition. The insurer has not argued the application of any other exclusion.
The insurer is therefore required to accept the claim and settle it by either undertaking the
necessary repairs or cash settling.
In the event the insurer decides to cash settle this claim, it should do so based on the
following:
engage an independent structural engineer to inspect the property and provide a full scope
of works for all the required repairs – the engineer should be one agreed to by the parties
and whose costs are payable by the insurer
obtain a current actionable quote from an independent repairer agreed to by the parties for
the disputed damage
cash settle the complainant based on this quote, plus a 15% uplift of the repair quote to
allow for the transfer of risk and contingencies.
Complainant seeks cover for contents under the additional benefits
The complainant also seeks cover for two surfboards and tools that were stored in the shed.
The complainant says he is entitled to cover for these items under the ‘ additional benefits’ of
the policy.
The policy provides cover for damage to items caused by an insured event if the items are left
outside the building. As clarified in the policy, this means any place at the site that is not fully
enclosed by walls and a roof
The complainant says the tools were kept inside a shed and water than ran through causing
the damage. The panel is not satisfied the circumstances of that damage trigger the
additional benefit under the policy. This is because the tools were not kept outside the
building.
For the surfboards, it is not clear if these were kept in a building or outdoors. The complainant
is therefore required to provide the insurer with reasonable and appropriate evidence to show
where the surfboards were kept during the event. That evidence should be provided within 14
days of the complainant accepting this determination (if he accepts it). Upon receipt of this
Determination | Case number: 908149 Page 5 of 6
information, the insurer is to apply the additional benefit and cover the surfboards, if
applicable under the policy.
2.2 Is compensation for non-financial loss warranted?
AFCA may award compensation in certain circumstances
AFCA will only award compensation for non-financial loss where there has been an unusual
amount of physical inconvenience, time taken to resolve a situation, or interference with the
complainant’s expectation of enjoyment or peace of mind.
In assessing whether to award compensation, AFCA expects complainants to be moderately
robust, bear the normal degree of inconvenience experienced when a problem occurs, and
take reasonable steps to minimise the inconvenience suffered. AFCA considers the severity
and impact of the financial firm’s conduct on the particular complainant.
The maximum amount AFCA can award for non-financial loss is $5,400 per claim.
Compensation for non-financial loss is warranted
The panel notes the insurer ’s engineer did not attend the site to investigate the cause of the
damage until 6 months after the loss. In the meantime, the stability and safety of the property
had been seriously compromised by the damage caused by the storm. The complainant has
had the ongoing concern about the security and safety of his property.
In the circumstances, the panel considers it fair that the insurer pays $1,000 compensation for
non-financial loss.
2.3 Why is the outcome fair?
The outcome is fair as the available information supports the complainant’s claim that the
disputed damage was, on balance, caused by a storm. The insurer has not established the
policy exclusion on which it relies applies.
It would not be fair to require the insurer to cover the loss of tools kept in the shed. It would
also not be fair for it to cover the surfboards unless/until the complainant provides reasonable
evidence that they were outside the shed when the storm hit.
Determination | Case number: 908149 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.