Text of the determination
Determination
Case number 907982
Financial firm Allianz Australia General Insurance Limited
Determination | Case number: 907982 Page 1 of 6
Case number: 907982 27 March 2023
1 Determination overview
1.1 Complaint
The complainant holds home building and contents insuran ce with the financial firm (insurer).
Her home is built on a steeply sloping block. On 28 February 2022, s he lod ged a claim for
movement damage when a retaining wall failed during a severe storm event the day before .
The insurer has denied the claim. It says the storm damage cover does not apply to retaining
walls. It also says the house movement was due to inadequate drainage behind the retaining
wall, leading to soil slumping. The policy excludes inherent defects and soil movement.
The complainant maintains that the insurer should cover the claim. She also seeks
reimbursement of interest she paid on a loan she took to out to pay for repair of the retaining
wall. She is also dissatisfied with the insurer‟s claim handl ing.
1.2 Issues and key findings
Is the insurer entitled to deny the retaining wall damage?
Yes. The policy does not cover damage to retaining walls caused by a storm, so the insurer is
entitled to deny coverage for that damage. Accordingly, it is also not liable for any interest the
complainant has paid for the loan she took out to pay for the wall‟ s repair.
Is the insurer entitled to deny the house movement damage?
No. The damage was due to the retaining wall failing in the storm. Given the rainfall volume,
that would have happened even if drainage had been installed. The policy covers movement
of soil within 72 hours of a storm. Therefore, the exclusions the insurer relies on do not apply.
Is non-financial loss compensation payable?
Yes. The insurer has acknowledged that it is responsible for significant delays, which caused
the complainant major stress and inconvenience. It is reasonable to require the insurer to pay
the complainant the $5,400 compensation it previously offered.
Why is the outcome fair?
Storm damage to retaining walls is not covered. However, the insurer has not proven the
house movement damage is excluded. It is fair that the insurer covers the claim to the extent
the policy responds. It is also fair that the insurer pays compensation for stress it caused.
1.3 Determination
This determination is partially in favour of the complainant.
If the complainant accepts in writing this determination, the insurer is to:
cash settle the house movement claim in accordance with section 2.2 of this determination
within 14 days of the acceptance, pay the complainant $5,400 in compensation.
Determination | Case number: 907982 Page 2 of 6
2 Reasons for determination
During the storm event, there was water ingress into the granny flat on the lower level of the
complainant‟s house . The insurer has accepted that aspect of the claim is covered. As the
damage to the granny flat is not in dispute, this determination does not deal with or affect the
rights of the parties in relation to that damage.
2.1 Is the insurer entitled to deny the retaining wall damage?
Yes. The policy does not cover damage to retaining walls caused by a storm, so the insurer is
entitled to deny coverage for that damage. Accordingly, it is also not liable for any interest the
complainant has paid for the loan she took out to pay for the wall‟s repair.
Complainant must show a claimable loss under policy terms
The complainant is required to show, on the balance of probabilities (that it is more likely than
not), that she suffered a claimable loss under the policy. This means she must show the loss
was caused by a risk for which she is insured.
The complainant holds home and contents insurance with the insurer. Subject to the terms
and conditions set out in the product disclosure statement (PDS), the policy covers damage
caused by a listed insured event. One of those events is „Storm, cyclone, rainwater or run -of f‟.
The complainant says that on 27 February 2022, the granny flat became flooded during a
severe storm event. The next day, she observed that the retaining wall behind her house had
pushed out in one section and completely failed in another. The complainant says her house
was saved from collapse by its supporting poles still being attached to the back deck.
Once the complainant proves the existence of a claimable loss, the insurer is liable for the
loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of
proving on the balance of probabilities the application of the exclusion or condition.
Insurer says the retaining wall damage is not covered
The insurer engaged CR, engineers, to investigate causation. CR inspected the property on
11 May 2022, and reported that:
the retaining wall comprised of an upper section constructed of timber sleepers and a
lower grouted rock wall
the retaining wall sections had failed due to a combination of:
> the extreme rainfall in the storm event and subsequent saturation of the retained earth
> poor surface and subsurface drainage of the retaining wall, and
> remedial works (pouring of concrete for remediation of the damage to the upper section
caused failure of the lower section)
t he upper section‟s failure had „occurred suddenly following the February 2022 storm event
where the pressure of the saturated soil behind the wall has overwhelmed the structural
capacity of the wall‟
the volume of rainfall during the storm, would likely have overwhelmed the retaining wall
even if a drainage system had been installed.
CR reinspected the property on 2 July 2022, by which time the complainant‟s builder had
almost competed repair of the retaining wall. CR noted that the observed building movement
damage affecting the house was due to:
Determination | Case number: 907982 Page 3 of 6
„t he failure of the supporting retaining walls (now replaced), which can be considered part
of the footing system of the dwelling‟
„t he continued slumping of the retained soil behind the newly constructed retaining wall (a
direct result of the initial retaining wall failure) ‟ .
The insurer notes that t he „Storm‟ coverage section set out on page 17 of the PDS clearly
states that it does not cover loss or damage to retaining walls. Accordingly, it says the
retaining wall damage is not covered.
Complainant says the insurer should cover cost to repair retaining wall
The complainant says the retaining wall was attached to the support beams for the house.
She refers to CR‟s statements that the wall:
„appears to be an anchored wall with steel rods tying the posts back to assumed
“deadman” anchors in the retained bank‟, and
„can be considered part of the footing system of the dwelling‟.
The complainant submits:
the wall in question is the main support structure to my home. Without it, there is
no home. The wall was built in conjunction with the construction of my home as a
foundational wall. It is not separate to my home. It is part of the construction!
In addition, she says that the insurer‟s appointed loss adjuster, CC, informed her the wall was
structural and supporting her home. She refers to an email dated 13 April 2022 in which CC
advised it had recommended the insurer provide coverage.
Insurer is entitled to deny the retaining wall damage
Regardless of any other functional purpose the wall may serve, it is a retaining wall. The wall
retains the soil behind the house so that the soil and the house on it do not fall down the
steep slope.
It is also not in dispute that the storm event caused the wall to fail.
The PDS explicitly excludes damage to retaining walls due to storms.
I do not accept that CC‟s communications with the complainant in April 2022 preclude the
insurer from relying on the PDS. CC did not say that the insurer would cover the claim.
Further, CC noted that an engineer had been appointed to undertake further investigations.
Accordingly, the insurer is entitled to decline to cover the complainant for the retaining wall
damage. As that damage is not covered, the insurer is not liable for interest complainant paid
on the loan she took out to pay for the wall‟s repair.
2.2 Is the insurer entitled to deny the house movement claim?
No. The damage was due to the retaining wall failing in the storm. Given the rainfall volume,
that would have happened even if drainage had been installed. The policy covers movement
of soil within 72 hours of a storm. Therefore, the exclusions the insurer relies on do not apply.
Insurer says house movement damage is excluded
In light of CR‟s reports, the insurer submits:
Determination | Case number: 907982 Page 4 of 6
the proximate cause of the failure of the retaining wall and subsequent movement
of the deck footings, and house movement is caused by the failure of the retaining
wall in the claimed storm event. The heavy rain caused the upper tier retaining
wall to fail, as the water was unable to adequately drain, the result of the retaining
wall failure was loss of soil, and ongoing soil slumping. This resulted in the deck
footings shifting, causing movement in the house.
Proximate cause is the dominant, effective or operative cause of the loss. It is not required to
be last in time or the sole cause. The insurer says that as the proximate cause of damage to
the deck footings and house poles was the retaining wall‟s failure, the resulting house
movement damage is not covered.
The insurer also refers to general exclusions set out on page 55 of the PDS, which preclude
cover for damage as a result of, caused by or arising from:
inherent defects, including faulty design/materials, structural defects or poor workmanship
soil movement , „i ncluding erosion, landslide, mudslide or subsidence unless it is directly
caused by and occurs within 72 hours of…[a] storm‟.
According to the insurer, both of those exclusions apply to the house dama ge given CR‟s
findings. Further, it says „that the [deck] footings are attached to the wall is an inherent defect
and poor construction‟.
The insurer also refers to a general exclusion relating to wear, tear and gradual deterioration.
Insurer is not entitled to deny the house movement claim
The insurer accepts that the storm caused the retaining wall‟s failure, which in turn led to the
house movement damage. That is in keeping with the available information, including CR ‟s
expert engineering opinion.
Accordingly, I am satisfied that the proximate cause of the house movement damage was the
storm. If the severe storm had not occurred, the retaining wall would not have failed meaning
the deck footings and house support poles would not have been compromised.
It is important to note that the retai ning wall exclusion set out in the „Storm‟ coverage section
of the PDS only applies to damage to the retaining wall itself. It does not apply to resultant
damage arising from or related to the retaining wall damage.
I do not accept that the inherent defect general exclusion applies. CR refers to insufficient
drainage being a contributing factor in the retaining wall‟s failure. However, it also says (and
the insurer accepts) that the volume of rainfall would likely have overwhelmed the wall even if
a drainage system had been installed.
The insurer has not provided any expert evidence in support of its contention that the deck
footing‟s attachment to the retaining wall was an inherent defect. I am not satisfied it has
proven that to be the case.
I accept that another factor contributing to the retaining wall‟s failure was soil movement due
to saturation. CR says that was a direct result of the storm event. It also says the continued
slumping of soil was an ongoing process directly related to the storm.
The complainant observed the retaining wall‟s failure and movement damage well within 72
hours of the storm. Accordingly, the soil movement general exclusion does not apply.
Determination | Case number: 907982 Page 5 of 6
The insurer has not explained how the wear and tear exclusion is relevant to the house
movement claim. Nor has it provided any expert evidence suggesting the exclusion would
apply. Therefore, I am not satisfied that the wear and tear exclusion has been triggered.
Accordingly, the insurer is required to cover the house movement damage.
On 23 July 2022, CR provided a detailed scope of works (SOW) for remediating the „ building
movement damage …resulting from the February 2022 claim event‟. CR recommended the
remedial works be completed as soon as practicable to avoid further movement damage. The
complainant has been unable to afford the repairs.
CR‟s SOW is now over eight months old. It is reasonable to assume that the storm related
movement damage may have worsened in that period.
The insurer is to arrange for CR and a builder not previously involved in the claim to attend
the complainant‟s property as soon as possible. CR is to update its SOW. The updated SOW
is to be provided to the builder who is to prepare a quote for the cost of the works, based on
current retail pricing.
Within 14 days of receiving the quote, the insurer is to:
provide a copy of the updated SOW and the quote to the complainant
pay the complainant the quoted amount, plus a 15% uplift to allow for contingencies and
the loss of the lifetime guarantee that applies to insurer approved repairs.
2.3 Is non-financial loss compensation payable?
Yes. The insurer has acknowledged that it is responsible for significant delays, which caused
the complainant major stress and inconvenience. It is reasonable to require the insurer to pay
the complainant the $5,400 compensation it previously offered.
AFCA can award compensation for poor claim handling
Under paragraph D.3.3 of the AFCA Rules, we may award compensation for non-financial
loss (capped at $5,400) where the insurer‟s actions have cause d an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant‟s expectation of enjoyment or peace of mind.
Insurer’s claim handling unre asonably caused stress and inconvenience
The complainant says that the insurer‟s poor claim handling and delays have caused her
extreme distress.
The insurer has acknowledged that the complainant has experienced significant delays. It has
apologised to the complainant and has offered her $5,400 in non-financial loss compensation.
I agree with the parties that the insurer should have handled the claim better and accept that
its mismanagement caused the complainant major stress and inconvenience. It is reasonable
to require the insurer to pay the complainant the $5,400 compensation it previously offered.
2.4 Why is the outcome fair?
Storm damage to retaining walls is not covered. However, the insurer has not proven the
house movement damage is excluded. It is fair that the insurer covers the claim to the extent
the policy responds. It is also fair that the insurer pays compensation for stress it caused.
Determination | Case number: 907982 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. I have reviewed and considered
all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, I have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.