Insurer limited cover for flood damage and offered a cash settlement based on a low quote; service delays
Text of the determination
Determination
Case number 907877
Financial firm AAI Limited
Determination | Case number: 907877 Page 2 of 9
Case number: 907877 20 October 2023
1 Determination overview
1.1 Complaint
The complaints hold a home insurance policy (policy) with the financial firm (insurer). On 9
March 2022, a claim was lodged for flood damage to the insured property caused on 28
February 2022.
The insurer accepted the claim but limited cover to damage which it assessed to be
consistent with the flood event. The complainants are dissatisfied with the insurer’s
assessment of its liability, the cash settlement offer and its level of service over the life of the
claim.
1.2 Issues and key findings
Is it fair for the insurer to limit its liability under the policy?
Yes. The insurer’s assessment of its liability under the claim is fair. The available information
shows not all the damage claimed by the complainants is covered under the policy.
Is the insurer’s cash settlement o ffer fair?
No. The insurer ’s final cash settlement offer is not based on a fair and actionable repair
quote. Within 14 days of receiving notice of the complainants’ acceptance of this
determination, the insurer is to arrange a fresh and actionable quote to use as the basis for
settlement of the claim.
Are the complainants entitled to compensation for non-financial loss (NFL)?
Yes. The complainants are entitled to $2,000 in NFL given their poor experience and delay
caused by the insurer in bringing their claim to conclusion.
Why is the outcome fair?
The outcome is fair in all the circumstances because the insurer’s preferred quote is not
actionable. It would be unfair to allow the insurer to settle its liability under the claim based on
such a quote. Further, the available information shows the insurer’s overall managem ent of
the claim was not to a satisfactory level, and an award of NFL is fair in the circumstances.
1.3 Determination
This determination is in favour of the complainants.
If the complainants accept this determination, within 14 days of being notified of the
acceptance:
the insurer must cash settle the complaint as specified in section 2.2 of this determination.
the insurer must pay $2,000 in NFL to the complainants within 14 days or receiving notice
of the complainants’ acceptance of this determination .
Determination | Case number: 907877 Page 3 of 9
2 Reasons for determination
2.1 Is it fair for the insurer to limit its liability under the policy?
Yes. The insurer’s assessment of its liability under the policy is fair. The available information
shows not all the damage claimed by the complainants is covered under the policy.
Policy covers loss or damage caused by insured events
The policy covers the insured property against loss or damage caused by one or more of the
listed insured events including ‘Storm’ and ‘Flood’ specified in the product disclosure
statement (PDS). Cover under these policy benefits are subject to the conditions, limitations
and exclusions specified in the PDS.
The insurer provided the complainants with the relevant policy documentation including the
certificate of insurance (COI) and PDS. I am satisfied the insurer is entitled to rely on the
policy provisions to assess its liability under the claim.
The relevant policy wording has been provided in section 3 of this determination.
Onus on complainants to show the damage triggers cover under the policy
The initial onus is with the complainants to show that it is more likely than not the all the loss
or damage claimed within the terms of the policy. Only once the complainants can do this
does the onus shift to the insurer to show, on balance, it is entitled to limit or decline liability in
line with the policy or otherwise.
The complainants are seeking cover for all the damage they say is the result of the
storm/flooding event on 28 February 2022. The insurer does not dispute there is some interior
damage consistent with stormwater ingress and for which it has offered to cash settle the
complainants in the amount of $21,954.10.
The insurer says the structural issues noted to the insured building and associated cracking
damage has been occurring over an extended period due to foundational ground movement.
Damage of this nature is excluded from cover under the policy.
I note, since lodgement of the AFCA complainant, the complainants have advised that the
damage in the following areas does not form part of their claim:
cracking in driveway
cracking in garage
cracks to external walls to kitchen/dining/living areas
hole in ceiling in the bar room area
kitchen floorboards movement
bedroom window and door frame cracking.
I am satisfied the insurer, in line with the scope of works and associated repair quote from
builders ‘J’, has accepted to cover the recent internal water ingress damage in th e areas
listed below:
kitchen
hallway
lower rumpus room
living room
bedroom 2
bedroom 3
Determination | Case number: 907877 Page 4 of 9
back patio ceiling; and
replacement of an air-conditioning unit.
I am satisfied the above listed areas of the home and/or damage is not in dispute between the
parties. The damage that remains in dispute for the most part relates to:
structural cracking damage in various areas of the home caused by foundational
movement
mould
additional damage caused by the insurer’s appointed builders.
Consultants’ information shows structural movement damage is not covered
I am not satisfied the available information shows it is most likely that the movement related
cracking damage to various areas of the home is due to the February 2022 storm and
flooding event. Rather, it is more likely that this damage has been occurring gradually due to
long term foundational ground movement and wear and tear, which is excluded under the
policy.
I note the complainants have elected to authorise a complete roof replacement from tiles to
colourbond at a cost of around $18,621. However, there is an absence of any persuasive
information to show this was due to damage caused by the February 2022 event. Rather, I
accept the information shows there was only minimal damage to the original tiled roof and as
such it would not be fair to require the insurer to cover the cost of the roof replacement.
The insurer appointed engineering consultant M who has provided a report dated 23 August
2022, having attended the site on 21 June 2022. M found that there was non-compliant
surface water drainage to the North, East and South sides of the property. Further, that this
over time has caused long-term differential settlement and associated building movement
cracking. M also observed corrosion and cracked surfacing to the back-concrete balcony and
original steel support columns.
M says the steel support columns and fixtures on and around the balcony did not have
adequate corrosion resistant coating. Further, that the lining boards underneath the back
balcony have cracked and may be holding water which will further exacerbate corrosion of
reinforcement steel. M noted concrete cancer and puckering of underside lining which M says
is due to design and construction defects. M notes long term differential settlement movement
damage to the kitchen floorboards and drywall between the ground floor bar area and room,
which it says are unrelated to the February 2022 event.
I have reviewed the report from building consultant ‘JP’ dated 10 November 2022 obtained by
the complainant. I accept this report confirms the presence of cracking damage in various
areas of the dwelling due to movement of the internal footing, which it says is due to
solidification of the foundation soils during the flood event. JP says the damage was sudden
and is not due to movement over time. I note this report was sourced after M’s assessment
and JP had the opportunity to review M’s report.
I find the opinions and supporting information including photos from M to be more persuasive.
However, I am not persuaded that M has shown there are building defects and/or non-
compliance issues with surface water drainage requirements. This is because the building
standards and NCC referred to by M relate to structures built from 2019 onwards, whilst the
insured building was constructed prior to this time. However, M has provided persuasive
information which in my opinion shows the insured building has been experiencing movement
damage over an extended period and from before the event in February 2022.
Determination | Case number: 907877 Page 5 of 9
Without compelling information to the contrary, I accept the insurer has shown it is most likely
the movement (cracking) damage to the insured building is not due to the insured event
giving rise to the claim. Rather, it is more likely this damage has been occurring gradually
over time due to reasons clearly excluded under the policy.
Insurer’s assessment of its liability under the claim is reasonable
For the above reasons, I am satisfied the insurer has shown it is not required to cover all the
claimed damage and its assessment of the extent of damage to be accepted under the claim
is fair and consistent with its policy obligations.
2.2 Is the insurer’s cas h settlement offer fair?
No. The insurer has not shown its final cash settlement offer is based on a fair and actionable
repair quote. Within 14 days of receiving notice of the complainants’ acceptance of this
determination, the insurer is to arrange a fresh and actionable quote to use as the basis for
settlement of the claim.
Insurer offered a cash settlement of $21,954.10
The insurer says the complainants’ quote includes significant sums associated with the
improvement of the property’s footings and construction, which is not covered under the
policy. Further, the insurer says it is not liable for the cost of repairs to:
removal of the patio
footing works
floor levelling costs
replacement of the property’s roof with metal sheeting.
The insurer ’s final claim settlement offer is based on a scope of works prepared by building
consultants ‘ J ’ in the amount of $18,295.98. The insurer has increased this by a further 20%
to allow for contingencies, bringing its final claim settlement offer to a total of $21,954.10.
Complainant disputes the insurer’s quotes and claim settlement
I note the complainants believe a fair claim settlement for all the damage they claim is around
$160,000 in line with a repair quote from JP. However, the complainants have also provided a
response to the costings provided for the J’s scope of works from their preferred builder JP.
JP says J’s costings of the limited scope of works accepted by the insurer are unreasonable
and that fair costing for these works would be $51,432.08.
I acknowledge the positions of both the complainant and insurer. However, there is an
absence of any compelling information fro m either or the consultants’ supporting their
proposed costings. I am not satisfied either party has shown that their proposed cost of
repairs is fair, reasonable or alternatively that the other consultants quote is unreasonable.
Having considered both quo tes (based on J’s scope of works), I feel J’s costings are
unreasonably low whilst JP’s costing s appear excessive.
I believe it would be unfair to require the insurer to settle the claim based on JP’s costings .
Equally, I am not satisfied the insurer has shown its proposed cash settlement offer based on
J’s quote is fair in the circumstances. Further, I note J’s quote does not include mould
remediation works, electrical repairs or additional damage caused by the insurer’s make safe
representatives.
Determination | Case number: 907877 Page 6 of 9
Accordi ngly, for these reasons, I am not satisfied the insurer’s final claim settlement offer is
entirely fair or representative of what it should be required to pay the complainants.
Insurer is to increase final claim settlement as set out below
In line with the above, I am satisfied it is fair that the insurer within 14 days of receiving notice
of the complainants’ acceptance of this determination:
arranges for a suitably licensed and qualified building consultant (other than J) to provide a
fresh actionable repair quote based on J’s scope of works
the scope of works is to be increased to include mould remediation works, the necessary
electrical repairs, repairs to damage caused to the down pipes and lower level metal roof
sheets by the insurer’s appointed con sultants and damaged air conditioning unit (including
the cost to remove and reinstate the unit)
the cash settlement is to be increased by a further 15% to allow for contingencies and
transfer of risk in managing the repairs.
2.3 Are the complainants entitled to NFL?
Yes. The complainants are entitled to $2,000 in NFL given their poor experience and delays
caused by the insurer in bringing their claim to conclusion.
Rules allow for an award of NFL in certain circumstances
AFCA Rule D 3.3 allows for an award of up to $5,400 for non-financial loss compensation, if
the insurer caused the complainant to suffer an unusual degree or extent of inconvenience,
delay or interference. AFCA takes a conservative approach when considering any award of
compensation
Complainants dissatisfied with level of service received under the claim
The complainants are dissatisfied with the level of service received from the insurer and say:
it delayed the assessment of the claim
the level of communication from the insurer was poor
representatives of the insurer when contacted were unable to provide them with accurate
updates about their claim
the insurer disregarded their concerns regarding the presence of mould and the impact on
their family’s health
the insured delayed attending to concerns raised about the make safe works it authorised,
including sand bags hanging off the side of the roof and falling to the ground
its appointed trades caused further damage to their home and did not attend appointments
as promised.
Complainants are entitled to NFL
I am satisfied that the complainants suffered an unusual degree of stress, inconvenience, and
delays because due the insurer’s poor management of the claim and the failures of its
appointed consultants.
I accept the complainants’ conc erns regarding the mould, safety issues with the make safe
works and overall poor level of service and communications on the part of the insurer and its
representatives are fair and reasonable.
I am satisfied the insurer failed to appropriately acknowledge and address these concerns
within a reasonable timeframe. I accept this has impacted negatively on the complainants and
Determination | Case number: 907877 Page 7 of 9
their children over an extended period. This has caused unreasonable levels of stress,
anxiety, physical inconvenience and delays.
Accordingly, I believe it is fair that the insurer be required to pay the complainants $2,000 in
NFL in line with the AFCA Rules. This is to be paid within 14 days of receiving notice of the
complainants’ acceptance of this determination.
2.4 Why is the outcome fair?
The outcome is fair in all the circumstances because the insurer’s quote and basis for its cash
settlement offer is not actionable. It would be unfair to allow the insurer to settle its liability
under the claim based on such a quote. Further, the available information shows the insurer’s
overall management of the claim was not to a satisfactory level, and an award of NFL for this
is fair in the circumstances.
Determination | Case number: 907877 Page 8 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant policy wording
Things we don’t cover
Loss or damage to, or caused by, connected with or arising from, or liability
caused by, connected with or arising from:
Wear, tear and gradual deterioration
any part of the building that has wear, tear, rust, fading, rising damp,
corrosion, rot, action of light, atmospheric or climatic conditions or gradual
deterioration
…
Determination | Case number: 907877 Page 9 of 9
Things we don’t cover
Loss or damage to, or caused by, connected with or arising from, or liability
caused by, connected with or arising from:
Defects, faults, workmanship
any loss or damage to the part of the building with an inherent defect,
faulty design, structural defect or faulty/poor workmanship, whether or not
you knew or should reasonably have known about it...