Home / IAG / Determination 907521
Determination 907521
Partial decline of business property claim for flood damage
Summary
The business property was inundated in the February/March 2022 rain events and the insurer partially declined the claim as flood damage excluded under the policy without flood cover. AFCA found the initial stormwater inundation of the garage/office to 0.15m was covered and should be cash settled on a scope of works plus 10% uplift, but the balance caused by flood was excluded.
Flood damage is excluded where no flood cover extension is held, and rainwater that mixes with floodwater is classified as flood, though initial stormwater runoff damage before floodwater arrival remains covered.
Issues
- Claim denial primary · upheld
“The insurer is entitled to rely on the terms and conditions of the policy to decline the claim for flood damage.”
- Inadequate claim investigation secondary · not upheld
“I accept, based on the information provided that the initial inundation to a level of 0.15m above the garage/office floor was most likely stormwater runoff and therefore covered.”
Subjects and remedies
home or building damagenatural disasterpay claim
Text of the determination
Determination
Case number 907521
Financial firm Insurance Australia Limited
Determination | Case number: 907521 Page 1 of 6
Case number: 907521 27 January 2023
1 Determination overview
1.1 Complaint
The complainant holds a business insurance policy with the financial firm (the insurer) and
lodged a claim after the business property was inundated on 1 March 2022 following the
catastrophic rain events in February/March 2022.
The insurer partially declined the claim. It accepts the initial inundation of the garage/office
was likely stormwater runoff but otherwise found the damage to the house was caused by
flood. The policy did not include flood cover
The complainant acknowledges the property was flooded but says the inundation of the
house and garage/office was caused by stormwater runoff. The complainant disputes the
hydrologist report and says it does not properly consider the inundation of the house caused
by water overflowing the toilet system.
1.2 Issues and key findings
Is the insurer entitled to partially decline the claim?
Yes. I am satisfied the inundation of the house above floor level was most likely caused by
flood which is excluded from cover under the terms of the policy. The insurers liability is
limited to loss or damage caused by the initial inundation of the garage/office to a level of
0.15m above floor height.
Why is the outcome fair?
There is no dispute that the complainant had been provided the policy documents and that
the complainant had not opted to take out the optional flood cover. The outcome is fair as
flood damage is excluded under the policy and the available information shows that most
likely inundation above floor height in the house was caused by floodwater.
The insurer has accepted damage to the garage /office has been caused by stormwater
runoff and covered under the terms of the policy. The insurer can rely on the scope of works
(SOW) for the accepted damage and obtain a current quote based on the SOW. The insurer
may then cash settle the claim based on the quote subject to providing a 10% uplift on the
quote to cover contingencies.
1.3 Determination
This determination is in favour of the insurer
The insurer is entitled to rely on the terms and conditions of the policy to decline the claim for
flood damage.
If it has not already done so, the insurer should cash settle the claim for the loss or damage
assessed to be caused by the initial stormwater damage to a level of 0.15m in the
garage/office as set out in section 2.1 of this determination.
Determination | Case number: 907521 Page 2 of 6
2 Reasons for determination
2.1 Is the insurer entitled to partially decline the claim?
Yes. I am satisfied the inundation of the house above floor level was most likely caused by
flood which is excluded from cover under the terms of the policy. The insurers liability is
limited to loss or damage caused by the initial inundation of the garage/office to a level of
0.15m above floor height.
Policy does not provide cover for flood
The complainant’s business insurance policy covers for loss or damage not otherwise
excluded to property insured. If a flood cover extension is shown in the certificate of insurance
(COI) the policy will cover damage caused by flood.
The COI does not show flood cover. The information exchanged shows the complainant was
given the option to add flood cover for an additional premium. The complainant does not
dispute he did not have the flood cover extension.
Flood is defined in the PDS as:
the covering of normally dry land by water that has escaped or been released
from the normal confines of any of the following:
a lake (whether or not it has been altered or modified);
a river (whether or not it has been altered or modified);
a creek (whether or not it has been altered or modified);
another natural watercourse (whether or not it has been altered or modified);
a reservoir;
a canal;
a dam.
Circumstances of the loss
The complainant lodged a claim after the property was inundated on or about 1 March 2022
following a sustained period of heavy rainfall that impacted significant sections of the east
coast of Australia during February/March 2022 causing catastrophic damage.
The property is located approximately 100m from the Richmond river within the towns centre.
The complainant was not present when the property was inundated as R street was cut off or
blocked for up to three days during the event. The complainant reported the water likely came
from the south. When the complainant returned to the property on 2 March 2022, and there
was no water on the street.
Hydrology report identifies indicates inundation of house most likely due to
flood.
The insurer provided a report from its hydrologist (AD) dated 14 July 2022, which was
prepared following a site inspection on 22 April 2022. The report has been exchanged and a
summary contained in section 3 of this determination.
Determination | Case number: 907521 Page 3 of 6
The report identifies the garage/office to be at ground level at approximately 1.4m AHD
(Australian Height Datum). The house was on brick piers and the floor level 500m above
ground level. The floor level of the house would be approximately 1.9m AHD. AD observed a
high-water mark on one of the walls to be 0.3m above the floor level of the of the house and
190mm on furniture in the front of the house.
The garage/office of the property is located to the south of the property. The complainant
informed AD puddles were common within the garage during rain events as result of ingress
through the brick walls and foundations due to a combination of rainfall and high tides. It was
raining at the time of inspection and there was a puddle in front of the garage.
AD noted the car park in the north-east corner is raised above the floor level of the garage
and there is a garden bed with hedging along the southern wall of the garage. It was plausible
that runoff could concentrate into the garden bed which could then seep into the adjacent
garage through the brick wall or foundation.
AD states analysis of the LiDAR survey indicates the localised ponding could have reached
1.55 m AHD prior to overtopping a localised ridge line and flowing onwards to the Richmond
river. AD noted the level of ponding, runoff would have entered the garage/depths of up to
0.15 metres.
As the house is raised 500mm (approximately 1.9m AHD) above the garage/shed floor level
this would be unaffected by runoff and localised ponding. AD considered the inundation of the
house above floor level occurred after the Richmond River broke its banks and inundated the
floodplain.
The records at both gauges indicate water levels in the Richmond River began to rise on the
evening on 28 February 2022 is response to the heavy rainfall across the upper Richmond
and Wilson river catchment. The levels in the Richmond river adjacent to the property
reached around 1.6mADH at 8.00 am on 1 March 2022, with the peak occurring at 9.30am on
2 March 2022.
AD concluded the peak level of inundation to the insured property was caused by flows
escaping the confines of Richmond River. AD determined stormwater ponding could have first
inundated the office to the depths of up to 0.15m and the ceiling damage and mould caused
by stormwater entering through the roof.
Complainant says initial inundation of house through toilet system.
The complainant says water was entering the house through the drains, plumbing and toilet.
The complainant says staff observed that the inside of the toilet had a dirty water mark inside
the toilet bowl (much higher than the water level of the room). The complainant believes this
indicates the house was inundated from water escaping the drains etc which is not flood as
defined in the policy.
AD confirmed it is possible rising floodwaters could have infiltrated the local sewer systems
causing wastewater to surcharge from the floor waste drains in the building. AD states it
would have happened at the same time or moments prior to floodwaters overtopping the floor
level of the building. AD also states it could have manifested as a slightly higher peak water
level in the toilet compared to the flood level in the remainder of the house due to the
pressure of the floodwaters over the downstream sewer system. AD submits in summary,
wastewater would not have surcharged into the house from any floor wastes or created a
higher water level in the toilet, without the effect of the floodwaters from the Richmond river.
Determination | Case number: 907521 Page 4 of 6
The complainant raised the point of the outside walls showing a water level just above the
floor height. AD submits the report states the peak level of inundation was between 0.19 to
0.30m above the floor level observed at two different locations. AD did not see any water
level marked as stated by the complainant.
While I accept wastewater may have inundated the house, in my view, most likely this
occurred after the floodwater had escaped from the normal confines of the river causing a
surcharge of the stormwater/wastewater systems. This would be considered flood water
mixing with stormwater and is correctly classified as flood.
Insurer entitled to partially decline the claim
I accept, based on the information provided that the initial inundation to a level of 0.15m
above the garage/office floor was most likely stormwater runoff and therefore covered under
the terms of the policy.
I note the insurer has accepted this initial inundation is covered under the terms of the policy.
It is unclear from the information provided whether the insurer has settled this aspect of the
claim although I am informed that a scope of works (SOW) has been obtained. In the event
the insurer has not already settled this part of the claim then within 14 days of the
complainant accepting this determination, the insurer should obtain a further quote for the
accepted loss or damage based on the SOW. The insurer may then cash settle the claim
based on the quote subject to providing a 10% uplift on the quote to cover contingencies.
The insurer is otherwise entitled to rely on the terms and conditions of the policy to refuse
liability for the balance of the claim on the grounds it was caused by flood which is excluded
from cover.
2.2 Why is the outcome fair?
There is no dispute that the complainant had been provided the policy documents or that the
complainant had not opted to take out the optional flood cover.
The outcome is fair as flood damage is excluded under the policy and the available
information shows that most likely, inundation above floor height in the house was caused by
floodwater.
The insurer has accepted damage to the garage /office has been caused by stormwater
runoff and covered under the terms of the policy. The insurer offered to settle the claim based
on a SOW obtained from a builder. To avoid ongoing delay, it is fair for the insurer to rely on
the SOW and obtain a current quote based on the SOW. It is fair to allow a 10% uplift on any
quote provided to cover possible contingencies that may arise.
Determination | Case number: 907521 Page 5 of 6
3 Supporting information
3.1 AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided. While the parties have raised
several issues in their submissions, we have restricted this determination to the issues that
are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information. If there are conflicting recollections and these are evenly weighted, we may find
that a claim cannot be established.
3.2 Hydrology Report from AD
AD noted the lower sections of the walls (gyprock) were stripped. The complainant advised
the walls had been stripped higher than the peak water level. Mould was observed on the
ceiling.
there was no rainfall damage on the ceiling at the front of the insured property.
the garage/office of the insured property which is located to the south of the property. AD
noted the floor level of the garage is flush with ground level. Puddles inside the garage at
the time of the inspection, which was spread out mostly along the southern edge of the
shed. The complainant informed AD puddles were common within the garage during rain
events as result of ingress through the brick walls and foundations due to a combination of
rainfall and high tides.
the flood level of the car park in the North East corner is raised above the floor level of the
garage and there is a garden bed with hedging along the southern wall of the garage.
It was plausible that runoff could concentrate into the garden bed which could then seep
into the adjacent garage through the brick wall or foundation.
Determination | Case number: 907521 Page 6 of 6
rainfall data showed steady rainfall across much of the Northern Rivers region at around
12.00 on 23 February 2022, which continued for around 20 hours before abating. A second
more intense rainfall period occurred from mid-morning on 27 February 0222, continuing
for 30 hours and ending on the evening of Monday 28 February 2022.
the two closest weather gauges to the property are (B and A). B is located 3.7 kilometres
from the property, and recorded 259mm rainfall over a 36-hour period from 8.00am on 27
February 2022. A recorded 515 mm over the same period. In the absence of additional
rainfall records, it is reasonable to assume the rainfall at the insured property was similar
or marginally higher than recorded at B. AD states, this would mean that the heaviest rain
fall was between 7.00am and 8pm on 27 February 2022 with at least 167mm of rainfall
during this period.
this heavy rainfall over the 13-hour period, would have generated large volumes of runoff
that would have overwhelmed the stormwater drainage along R Street. AD states this
would have led to runoff being concreated towards the low-point of the south-west corner
of the insured property. AD says the extent and depths of ponding would have increased
over the 13-hour period leading to inundation spreading into the property.
the localised ponding could have reached 1.55 m AHD prior to overtopping a localised
ridge line and flowing onwards to the Richmond river. The level of ponding, runoff would
have entered the garage/office to a depth of up to 0.15 metres.
the house is raised 500mm above the garage/shed floor level and would been unaffected
by runoff and localised ponding. The inundation above floor level of the house would have
occurred after the Richmond river broke its banks and inundated the floodplain.
the two nearest river level gauges to the property indicate water levels in the Richmond
River began to rise on the evening on 28 February 2022 is response to the heavy rainfall
across the upper Richmond and Wilson River catchment.
the levels in the Richmond River adjacent to the property reached around 1.6mADH at
8.00 am on 1 March 2022, with the peak occurring at 9.30am on 2 March 2022. AD
estimated the river levels would have reached around 1.95 mAHD at the insured property
based on its position between the two gauges.
the peak level of inundation to the insured property was caused by flows escaping the
confines of Richmond river. AD determined stormwater ponding could have first inundated
the office to the depths of up to 0.15m and the ceiling damage and mould caused by
stormwater entering through the roof.
3.3 Rainwater that mixes with flood water is flood
The courts have established that once rainwater mixes with flood water, it is all considered
flood water. Where rainwater mixes with flood water and causes damage, a flood exclusion
will usually apply to defeat the claim.
Accordingly, when deciding complaints, consideration has been given to whether there was
any rainwater runoff damage before the flood water arrived at the insured property.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.