Escape of liquid claim: cash settlement adequacy and exclusion of bathroom and subfloor damage

FirmIAG
Decided2023-11-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$5,686
SourceAFCA PDF

Summary

The complainant disputed the insurer's cash settlement for water damage from an escape of liquid and sought compensation for bathroom, subfloor and asbestos-testing damage plus non-financial loss. AFCA found the insurer's $4,000 offer, already including $459.27 non-financial loss, was fair and ordered no further payment beyond that offer.

A cash settlement must be based on a reasonable quote for claim-related repairs with a contingencies uplift, and gradual deterioration and wear and tear exclusions apply to damage not caused by EOL.

Issues

Subjects and remedies

home or building damagemotor vehicle collisionno remedy

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 907112 Financial firm Insurance Australia Limited Determination | Case number: 907112 Page 1 of 7 Case number: 907112 27 October 2023 1 Determination overview 1.1 Complaint The complainant holds home building insurance issued by the financial firm (insurer). On 6 January 2022, he lodged a claim after discovering water damage to his living room ceiling, directly below the upstairs bathroom. The insurer accepted there was escape of liquid (EOL) from the bathroom and has offered a cash settlement for the cost to repair the resultant damage to the ceiling. It has also paid the complainant $2,050 for temporary accommodation (TA), even though he stayed in the home. However, the insurer refuses to cover the bathroom and subfloor damage. It says that damage is not from EOL but is due to gradual deterioration, which the policy excludes. The complainant says the resultant damage is more extensive than the insurer has allowed for and that its cash settlement offer is too low. He also says the insurer is liable for damage to the bathroom from asbestos testing the insurer had approved. In addition, the complainant wants to be compensated for the stress and inconvenience the insurer has caused him. 1.2 Issues and key findings Is the insurer required to pay more than it has offered? No. The insurer’s $4,000 offer is adequate because it is based on a reasonable quote for claim related repairs and includes a 20% contingencies uplift. Further, the exchanged information does not show that the insurer is responsible for damage due to asbestos testing. Is more non-financial loss compensation payable? No. The insurer has included in its $4,000 offer $459.27 for non-financial loss compensation. I am satisfied that is sufficient, noting the insurer has overall handled the claim reasonably. Why is the outcome fair? Based on the exchanged information, the insurer’s $4,000 offer in addition to the $2,050 previously paid represents a fair assessment of its liability to the complainant. 1.3 Determination This determination is in favour of the insurer. Within 14 days of receiving written notice from the complainant that he accepts this determination, the insurer is required to pay him $4,000. The insurer is not required to take any other action in relation to the claim or this complaint. Determination | Case number: 907112 Page 2 of 7 2 Reasons for determination 2.1 Is the insurer required to pay more than it has offered? No. The insurer’s $4,000 offer is adequate because it is based on a reasonable quote for claim related repairs and includes a 20% contingencies uplift. Further, the exchanged information does not show that the insurer is responsible for damage due to asbestos testing. Insurer investigated the damage On 25 January 2022, plumber HP performed leak detection testing on behalf of the insurer. HP observed that the living room ceiling was in poor condition, with a large amount of water damage to the plaster and timber underneath the shower recess. There were no pipe leakages but spray testing confirmed the recess itself was leaking. HP concluded: In our opinion the shower recess is in poor ageing condition and is no longer watertight. We also believe the water is exiting the ceiling below due to the absence of a waterproof membrane. HP recommended that the complainant engage a builder to replace the damaged timbers and the shower area. The insurer’s builder, RB, inspected the property on 2 February 2022. It noted about 9m 2 of ceiling plaster and associated cornices required replacing. RB said that was the only resultant damage from EOL, and that the timber sub-floor was stained but not compromised. RB said the damage was consistent with long term wear and tear, and there was no need for TA. RB also provided a scope of works (SOW) dated 19 January 2022 for rectification of the resultant damage. RB costed the required repairs at $2,322.17. RB said it would not be able to warrant the work due to the extensive bathroom maintenance repairs the complainant would have to complete. Accordingly, its SOW/quote was for cash settlement purposes only. AC, the builder the complainant had engaged in January 2022 to inspect the damage, raised asbestos concerns. A t the complainant’s reques t, the insurer agreed to AC arranging asbestos testing, and to cover the cost of a hygienist’s report ($9 90 – which it paid). Health and safety consultant AM provided an asbestos identification report dated 4 March 2022, addressed to AC. No asbestos was detected. The result was later confirmed by the insurer’s hygienist, IF, in a report dated 13 May 2022. On 20 April 2022, the insurer’s building assessor, UB, inspected the property. UB said that:  the complainant reported that an asbestos specialist (presumably, AM) had removed tiles from the shower base, floor and bath hob for testing, then sat there for three hours before proclaiming no asbestos was present even though lab testing had not yet been performed  tiles had been removed from the shower base, floor and bath hob  there was no tile underlay or waterproofing below the floor tiles  there was a pre-existing cracked and missing tile on the outside of the shower hub wall where asbestos testing could have been undertaken  water appeared to have been escaping the confines of the recess through deteriorated sealants, grout and waterproofing (if present)  it estimated resultant damage repair costs at $2,356.30. Determination | Case number: 907112 Page 3 of 7 Insurer has made a cash settlement payment and offered further amounts In late January/early February 2022, due to the asbestos concerns AC had raised, the insurer offered the complainant TA. On 15 February 2022, the complainant told the insurer he did not want to leave his home and requested compensation instead. The insurer paid him $2,050 as TA costs. It says that figure was based on an allowance of $50/day. In March 2022, the insurer offered the complainant a cash settlement of $2,322.17 less the $600 policy excess, based on RB’s SOW/quote dated 19 January 2022. It has increased the amount offered several times, culminating in an offer made on 18 July 2023 to pay $4,000 as a cash settlement. The insurer says its offer comprises the following amounts totalling $4,600, from which it has then deducted the $600 policy excess: $2,983.94 - replace loungeroom ceiling (16m2 as per loungeroom measurements 4.7x3.5) instead of patching, cost of plaster replacement is $72.22 per m2 as per [RB] quote (increase from $650.00 to $1,1155.56 for plaster - good faith only) $596.79 - uplift of 20% applied to increased building settlement (from $2,983.94 to $3,580.73) for contingencies and construction cost increases $360.00 – reimbursement for asbestos testing (good faith only) $200.00 – bathroom tiles damaged during testing (good faith only) $459.27 – compensation for non-financial loss (good faith only - in addition to $2,050.00 compensation already paid during the claim) In making the of fer, the insurer has relied on RB’s revised SOW dated 30 June 2023. Based on ‘current pricing’, RB quotes $2,466.55 for resultant damage repairs. The insurer says that the offer has been made as a gesture of good faith, to resolve the dispute. The insurer maintains that it is:  not liable for upstairs bathroom repairs because: > the complainant has not shown the bathroom was damaged by EOL or any other insured event listed in the policy product disclosure statement (PDS) > the PDS states on page 13 that the EOL insured event does not cover the cost of repairing items that caused the EOL > the PDS sets out on page 31 a general exclusion for damage caused by gradual deterioration, wear or tear > the PDS confirms on page 46 that while the insurer will cover repair costs for damage caused by EOL from a bath, basin, shower base or wall, it will not pay the repair/replace the bath, basin, shower base or wall  not liable for sub floor timber repairs as the timber was stained only, not damaged. Further, the gradual deterioration, wear or tear applies  as set out on page 46 of the PDS, only required to cover the parts of the building that actually sustained loss or damage  despite offering to pay $200 on a goodwill basis for two bathroom tiles, not liable for damage to the bathroom caused by the asbestos testing because: > it did not engage AC or AM to undertake asbestos testing > it did not request or approve invasive testing methods Determination | Case number: 907112 Page 4 of 7 > the maintenance issues for which the complainant is responsible will require a full bathroom strip out, so he has not been prejudiced by the removal of a few tiles during the asbestos testing process > many of the remaining tiles will likely be damaged during the strip out, which means they will not be able to be reused. The insurer has also noted that it is arguable the living room ceiling damage should not be covered as it is consistent with gradual deterioration due to failed waterproofing rather than a single EOL (such as from a shower once a day). Nevertheless, it has given the complainant the benefit of the doubt by agreeing to pay for the resultant damage to the ceiling. Complainant says the insurer’s lat est offer is insufficient The complainant engaged AC to prepare a report and quote for the purpose of his insurance claim. On 14 January 2022, AC said:  the upstairs shower had leaked, and had caused a section of the ceiling below to collapse  there was also visible discolouration/water damage, cracks and ‘caves’ to the remaining ceiling area, and there was an extremely high risk it would collapse  the water damage had caused ‘extreme moulding and asbestos to the plaster’, which was visible on the collapsed section. It assumed the mould had spread over the entire ceiling  it noticed multiple leakage points from the upstairs bathroom shower, toilet and vanity mixer. It recommended re-doing the bathroom plumbing entirely  ‘there is evidence of water leakage that h as caused damage over a long period of time…you can see that the wall tiles behind the shower as curving and about to fall off. The water damage has also caused moulding and rotting to the subfloor timber’  it recommended the entire downstairs ceiling be removed and replaced. Full demolition of the upstairs bathroom was required to enable the plumbing issues to be fixed and any rotten/mould affected subfloor timber to be replaced. ‘Heavy’ waterproofing was needed  it quoted $36,850 for the recommended repairs. The complainant has submitted a quote dated 6 January 2023 from painter SG for replacing and repainting the living room ceiling. The quoted amount is $4,675. On 7 January 2023, tiler MP provided a report to the complainant. MP said it could not replace a few tiles only as the shower was not waterproofed. It also said the tiles were no longer on the market, so it recommended full replacement. MP estimated that would cost $15,000 to $17,000. It also noted there were deteriorated and rotten subfloor timber joints. The complainant has also provided a quote dated 6 May 2023 from DC, carpenter. DC said ‘due to excessive water damage on existing subfloor, flooring showing signs of deterioration which appears to have also affected floor joists’. DC recommended the compromised subfloor be replaced, for which it quoted $11,528. According to the complainant, the insurer is responsible for the damage to the bathroom from the asbestos testing. He says the insurer retained AM, which damaged a wall tile and a shower tile. He says that the insurer retained and supervised IF, which (after UB delivered its report) damaged a floor tile, shower base and part of the bath hob and shower wall. The complainant says the insurer’s $4,000 cash settlement offer is inadequate. He notes that the allowances RB has made in its SOW dated 30 June 2023 are less than those the insurer has agreed to cover. For example, the SOW refers to replacing 9m 2 of ceiling, while the insurer has agreed to replace 16m 2 . He also says the ceiling area is closer to 17.76m 2 . Determination | Case number: 907112 Page 5 of 7 On 2 September 2022, the complainant indicated he would be willing to accept a cash settlement based on RB’s SOW, but subject to the following amendments/additions :  $2,594.63: replacement and painting of ceiling (17.76m 2 ) and surrounding cornice, removal of two lights  $300.00: reinstallation of lights  $2,000.00: repair of bathroom tile damage due to asbestos testing  $18.26: repair of bathroom plaster damage due to asbestos testing  $195.00: cleaning, including waste removal  $417.05: builder’s margin on bathroom tile repairs and clean up  $261.21: GST on bathroom tile repairs, clean up and builder’s margin  $500.00: minimum amount for non-financial loss compensation. The figures set out above total $6,286.15. The complainant acknowledges that figure does not take into account the policy excess. The total less the excess is $5,686.15. Insurer is not required to pay more than it has offered A cash settlement must be based on a reasonable quote for claim related repairs. An uplift is then to be applied to the quoted amount to allow for contingencies and the loss of the lifetime guarantee that applies to insurer approved repairs. Based on the exchanged information, I am satisfied that the insurer’s offer to pay the complainant $4,000 as a cash settlement (in addition to prior payments). This is because:  it is based on RB’s SOW/quote dated 30 June 2023, which is less than four months old and is said to reflect current pricing  in an effort to address the complainant’s concerns, the insurer has on a good faith basis and so as to resolve the dispute, offered to cover additional damage. That does not mean it accepts that additional damage is the result of EOL, so RB’s SOW is inaccurate  the insurer’s proposed a 20% contingencies uplift, which is reasonable  to the extent the complainant continues to press for the damage to the subfloor to be covered, the weight of expert opinion supports a finding that damage involves gradual deterioration, which is excluded  given what UB observed before IF had attended the home, it is more likely than not that AM caused most if not all the bathroom damage by invasive testing  while the insurer agreed to AC arranging asbestos testing, it did not engage AM or approve the invasive testing undertaken  in any event, the complainant will have to complete a full bathroom strip out. Therefore, any damage due to the invasive testing has not increased his loss. 2.2 Is more non-financial loss compensation payable? No. The insurer has included in its $4,000 offer $459.27 for non-financial loss compensation. I am satisfied that is sufficient, noting the insurer has overall handled the claim reasonably. AFCA can award compensation for poor claim handling Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400 per claim) where the insurer’s actions have caused a complainant an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with the complainant’s expectation of enjoyment or peace of mi nd. Determination | Case number: 907112 Page 6 of 7 Insurer has offered a sufficient amount as compensation The complainant says the insurer’s unreasonable refusal to make an adequate cash settlement offer has caused him long term continuous agony as he has been forced to live in miserable conditions. He wants to be fairly compensated for his experience. The insurer has allowed in its $4,000 cash settlement offer $459.27 as an allowance for non- financial loss compensation. That is close to the $500 minimum amount the complainant says he should receive. I consider that the insurer has overall handled the claim reasonably. It arranged investigations promptly, offered the complainant TA and then paid him $2,050 for TA even though he elected to not move out of the home. It has given the complainant the benefit of the doubt in agreeing to cover the resultant ceiling damage and in allowances included in its latest offer. In the circumstances. I am satisfied that the insurer’s $459.27 offer for non -financial loss compensation is sufficient. 2.3 Why is the outcome fair? Based on the exchanged information, the insurer’s $4,000 offer in addition to the $2,050 previously paid represents a fair assessment of its liability to the complainant. Determination | Case number: 907112 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.