Text of the determination
Determination
Case number 906663
Financial firm AAI Limited
Determination | Case number: 906663 Page 2 of 7
Case number: 906663 29 May 2023
1 Determination overview
1.1 Complaint
Since 20 September 2021, the complainant and FB have held landlord insurance with the
financial firm (insurer). On 11 May 2022, they lodged a claim for movement damage to their
investment property, which they attributed to escape of liquid (EOL) from leaking pipework.
The insurer has denied the claim. It accepts that EOL has occurred. However, it says there
has not been a single leak incident causing damage. Rather, the claimed damage has
occurred gradually and is mostly due to wear and tear and ground movement over time. The
policy excludes cover for damage from those causes.
The complainant maintains that the claimed damage should be covered under the EOL
insured event set out in the policy.
1.2 Issues and key findings
Is the insurer entitled to deny the claim?
No. The damage has predominantly been caused by a series of EOL incidents attributable to
one source. Further, the insurer has not established that it is more likely than not that the
claimed damage was due to causes excluded under the policy.
Why is the outcome fair?
The operative cause of damage was a series of leak events from the one source. The insurer
has not shown the claimed damage is excluded under the policy terms. It is therefore fair that
it covers the claim.
1.3 Determination
This determination is in favour of the complainant.
If the complainant accepts this determination, the following steps are to be taken:
the insurer is to provide him with a choice of three building consultants not previously
involved in the claim who are willing to prepare an SOW and quote for the claim related
movement damage
within seven days of the complainant informing the insurer of his choice, the insurer is to
engage that building consultant to inspect the property, prepare an SOW that adequately
accounts for claim related repairs, and a resulting actionable retail quote
within 14 days of receiving the building consultant’s SOW/quote the insurer is to pay the
complainant the quoted amount plus a 20% uplift, less the policy excess.
The insurer is also required to reconsider the plumbing invoices the complainant previously
provided in terms of the extent to which they may be covered under the policy as exploratory
costs. This does not necessarily mean those invoices must be covered.
Determination | Case number: 906663 Page 3 of 7
2 Reasons for determination
The parties provided numerous submissions to AFCA. While this determination does not refer
to them all, I have taken each submission into account in reaching my decision.
2.1 Is the insurer entitled to deny the claim?
No. The damage has predominantly been caused by a series of EOL incidents attributable to
one source. Further, the insurer has not established that it is more likely than not that the
claimed damage was due to causes excluded under the policy.
Complainant must show a claimable loss under the policy
The complainant is required to show, on the balance of probabilities (that it is more likely than
not), that he suffered a claimable loss under the policy. This means he must show the loss
was caused by a risk for which he is insured.
Subject to the terms and conditions set out in the product disclosure statement (PDS), the
complainant’s policy covers damage to the insured property caused by a listed insured event.
Those event s include ‘ Escape of liquid ’.
The PDS requires that when making a claim, an insured must be able to prove that an
incident covered by the policy took place. ‘Incident’ is defined as ‘a single event, accident or
occurrence which you did not intend or expect to happen. A series of incidents attributable to
one source of originating cause is deemed to be the one incident’.
On 11 May 2022, the complainant lodged a claim with the insurer. He said that his managing
agent had recently discovered cracking and movement damage affecting his investment
property. The complainant said the damage was caused by leaking pipes.
Once the complainant proves the existence of a claimable loss, the insurer is liable for the
loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of
proving on the balance of probabilities the application of the exclusion or condition.
Insurer says the damage is not covered
The insurer says the proximate cause of the claimed loss is not a single incident covered by
the policy. Rather, the damage was proximately caused by gradual process of leaks, wear
and tear and ground movement. The policy excludes cover for damage from those causes.
Proximate cause is the dominant, efficient or operative cause of the loss. It is not required to
be last in time or the sole cause. It is a question of fact dependant on the circumstances.
When the claim was lodged, the insurer appointed builder AB to assist it with assessment. On
19 May 2022, AB’s plumber attended the property and undertook CCTV inspection of the
pipework and leak detection testing. AB reported that:
the cause of leakage was the bath/shower waste not being connected to the sewer line
the resultant water pooling under the house could potentially be causing movement
throughout the property
the bath/shower failed a spray test due to deteriorated seals between the wall and bath
there were no silicon seals behind the bath/shower spindles and the bath spout had not
been installed flush with the wall
while there were issues with the sewer/stormwater drains, including tree root ingress, there
were ‘no issues with drains that would cause the damage’.
Determination | Case number: 906663 Page 4 of 7
On 26 May 2022, the insurer’s engineering expert , GP, inspected the property. GP concluded
the EOL AB found was the dominant cause of movement damage to the laundry, bathroom
and toilet area. Seasonal soil movement was a moderate cause of that movement damage. In
the case of the laundry, non-compliant surface drainage was also moderately causative.
The insurer asked GP for how long the damage had been occurring, to which GP responded:
Very difficult to say, the damage could have begun years ago and slowly
progressed to this point. The hallway crack looks fairly recent, it wouldn't surprise
me if this had occurred within the last 8-12months. Since the dwelling is on
stumps and given the magnitude of water discharging beneath the dwelling I
would assume the plumbing related damages are all mostly within the last 12-18
months depending on when the dwelling was last occupied, however, there are
many other factors that could have slowed or increased the rate of deterioration.
On 27 September 2022, the insurer asked GP to confirm whether the dominant cause of
damage was EOL from the waste not connected to the sewer line. It also asked if the damage
was due to a gradual leaking process and, if so, over what period. GP responded as follows:
multiple EOLs throughout the property had resulted in foundational movement
while it was difficult to say exactly which one caused the majority of the laundry damage,
GP attributed that damage to the nearest EOL, being the disconnected downpipe
the damage to the bathroom and surrounding areas, including the toilet and entry, was
attributable to the EOL beneath the bathroom, being the disconnected waste pipe
‘Foundational issues can emerge very rapidly after the EOL therefore it would be assum ed
this is a recent leak, however, it is certainly possible this has been an ongoing issue that
has been neglected. It is very difficult to give an accurate time frame for this based on a
visual inspection’.
GP amended its original causation report after inspecting the property on 15 December 2022
with AB and the insurer’s internal property assessor. Its updated view was that the causes of
the movement related damage to the:
laundry were:
> EOL from the sewer line with tree root intrusion, near the driveway - minor
> maintenance issues (disconnected southeast drainpipe, non-compliant surface drainage
and seasonal soil movement) - dominant
kitchen/meals area, bathroom, toilet, entry, bedroom one and living room were:
> EOL from the disconnected waste pipe below the bath – dominant
> maintenance issues (non-compliant drainage and seasonal soil movement) – minor
Second bedroom were:
> EOL from the disconnected waste pipe below the bath – moderate
> maintenance issues (non-compliant drainage and seasonal soil movement) – moderate.
On 8 February 2023, the insurer again asked GP to confirm for how long the EOL damage
had been occurring and whether it was from a single leak incident or occurred over a period.
GP replied ‘these EOL events would need to take place over a period of time longer than 3
days (72 hours) for any significant foundational movement (and therefore any significant
movement related damages) to occur’.
Determination | Case number: 906663 Page 5 of 7
Based on GP’s commentary , the insurer says that a single leak event/occurrence was not the
proximate cause of the resultant movement damage. Instead, the effective causes of damage
are excluded because the PDS confirms the EOL insured event does not cover:
the cost to repair/replace the leaking item
dam age caused by ground movement, ‘but we will cover loss or damage caused by a
landslide or subsidence proved to have occurred within 72 hours of, and directly because
of, escape of liquid and not because of erosion, structural fault or design fault’
wear, tear, gradual deterioration or damage by the gradual process of liquid leaking.
Further, the PDS general excludes damage caused by, connected with or arising from ground
movement (except to the extent it is covered under, relevantly, the EOL insured event).
Complainant maintains that the policy responds to the claim
The complainant says he is on a pension and unable to afford expert reports in response to
those relied on by the insurer. However, he says GP’s findings confirm that his property
sustained EOL related movement damage.
He also relies on a letter from the property’s managing agent stating that:
the property was subject to six monthly routine inspections
at the last inspection the property was found to be in satisfactory condition and the tenants
did not report any maintenance concerns
soon after the tenants vacated, the agent discovered that the waste pipe under the house
from the bath/shower was no longer connected to the drain.
this meant water from showers and baths would run under the house, sit around the
stumps and make the ground very soft
this could have potentially caused movement and cracking damage.
Insurer is not entitled to deny the claim
I am not satisfied that the insurer is entitled to deny the claim. This is because:
it is not in dispute that EOL has occurred at the property, contributing to movement
damage
GP’s clearly stated opinion was that EOL from the disconnected waste pipe was the
dominant cause of damage to the kitchen/meals area, bathroom, toilet, entry, bedroom one
and living room. It was also a moderate cause of damage to bedroom two
GP also said EOL from the sewer line broken by tree roots was a minor cause of damage
to the laundry
this means that EOL was the dominant cause of the movement damage to the majority of
rooms in the house, and contributed to the damage to the other two rooms
the PDS generally excludes tree root damage, except EOL from pipes damaged by tree
roots to the extent such damage is covered under the EOL insured event
the EOL from the disconnected waste pipe would only have occurred when the
bath/shower were being used. This means that EOL was not gradual
as the PDS confirms a ‘ series of incidents attributable to one source of originating cause is
deemed to be the one incident’ , the damage caused by the EOL from the disconnected
waste pipe was from a single incident
the insurer bears the onus of proving the exclusions on which it relies on balance apply.
GP does not say that wear, tear or gradual deterioration caused the EOL from the
disconnected waste pipe (or the broken sewer line)
despite the insurer’s repeated questioning, GP does not say the movement (subsidence)
occurred more than 72 hours after EOL. GP merely says the EOL events would need to
have taken place over a period longer than 72 hours to cause damage
Determination | Case number: 906663 Page 6 of 7
GP also said that foundational issues can emerge very rapidly after an EOL, and that it is
certainly possible this has been an ongoing issue
It is reasonable to conclude that the movement process would have commenced within 72
hours of the EOL, and would have been added to by each further EOL which formed part
of the series of incidents caused by the disconnected waste pipe
accordingly, the insurer is not entitled to rely on the ground movement exclusion applicable
to the EOL insured event.
The proximate cause of the movement damage affecting most of the house was a series of
EOL incidents attributable to one source, the disconnected waste pipe. The insurer has not
shown policy exclusions apply. It is therefore required to cover the claim pursuant to the
policy terms.
GP has confirmed that non-compliant drainage and seasonal soil movement have contributed
to the damage. It says maintenance work is required to address those matters and to prevent
further EOL from the pipework. GP says a 12 month stabilisation period is required following
the maintenance work before remedial repairs it has outlined can be undertaken.
On 20 December 2022, GP noted that some maintenance repairs had been undertaken.
Importantly, the bath/shower waste pipe had already been reconnected.
Accordingly, I am satisfied that it is fair and reasonable that the insurer settles the claim by
paying the complainant the reasonable cost of covered repairs plus an uplift to allow for
contingencies and the loss of the lifetime guarantee that applies to insurer approved repairs
If the complainant accepts this determination, the following steps are to be taken:
the insurer is to provide him with a choice of three building consultants not previously
involved in the claim who are willing to prepare an SOW and quote for the claim related
movement damage
within seven days of the complainant informing the insurer of his choice, the insurer is to
engage that building consultant to inspect the property, prepare an SOW that adequately
accounts for claim related repairs, and a resulting actionable retail quote
within 14 days of receiving the building consultant’s SOW/q uote the insurer is to pay the
complainant the quoted amount plus a 20% uplift, less the policy excess.
The insurer is also required to reconsider the plumbing invoices the complainant previously
provided in terms of the extent to which they may be covered under the policy as exploratory
costs. This does not necessarily mean those invoices must be covered.
Finally, I acknowledge the complainant was dissatisfied with the insurer’s communications.
He highlights an instance when the insurer sent an email with a sign off block from one of its
other brands. The insurer says this was due to human error and has apologised for doing so.
I am satisfied the apology was a sufficient response to the complainant’s concerns.
2.2 Why is the outcome fair?
The insurer has not shown the claimed damage is excluded under the policy terms. It is
therefore fair that it covers the claim.
Determination | Case number: 906663 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. I have reviewed and considered
all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, I have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.