Partial denial of storm/flood claim for building and contents on grounds of faulty design/workmanship exclusion and mould
Text of the determination
Determination
Case number 905683
Financial firm Insurance Australia Limited
Determination | Case number: 905683 Page 1 of 11
Case number: 905683 24 May 2023
1 Determination overview
1.1 Complaint
The complainants hold a Home insurance policy with the financial firm (the insurer) for their
building and contents.
The complainants’ property was subject to major weather events between March and June
2022. Subsequently, the complainants lodged two claims for damage to the building and
contents caused by the weather events.
Following assessment, the insurer concluded most of the claimed damage was caused by
faulty design and workmanship, both of which are specifically excluded under the insurance
policy and partially denied the claim.
The complainants disagree with the insurer’s decision and say the claimed damage was
caused by the storm/flood events and the insurer is liable for the loss. Additionally, the
complainants say the insurer did not appropriately handle the claim causing unnecessary
delays, inconvenience and stress.
1.2 Issues and key findings
Should the insurer contribute further for the building damage claim?
Yes. As detailed in section 2.1 of this determination, the insurer is required to increase its
cash settlement.
Should the insurer contribute further for the contents loss claim?
Yes. As detailed in section 2.2 of this determination, the insurer is required to increase its
cash settlement.
Is non-financial loss compensation payable?
The insurer has handled the claim reasonably and is not required to pay any non-financial
loss to the complainants.
1.3 Determination
This determination is partially in favour of the complainants.
Within 21 days of the complainants providing written notice they accept this determination the
insurer is required to do the following:
> pay $2,450 for clean-up works
> pay $4,175 for cleaning the tank
> pay $9,119 for vanity reinstatement
> assess and settle the electrical items as detailed in section 2.2 of this determination
> pay a further amount for contents as detailed in section 2.2 of this determination.
Determination | Case number: 905683 Page 2 of 11
2 Reasons for determination
The parties provided numerous submissions, reports and documents to AFCA. While this
determination does not refer to all those materials, the AFCA panel has read them all and
taken them into account in reaching its decision.
2.1 Should the insurer contribute further for the building
damage claim?
Complainants have an onus to show the loss is covered
The complainants are required to show, on the balance of probabilities (that it is more likely
than not), they suffered a claimable loss under the policy. This means they must show the
loss was caused by a risk for which they are insured.
Following a major fire incident in 2021, the complainants made alterations to their garage and
used it as their residence (in lieu of temporary accommodation). The complainants took out
the subject insurance policy for the garage (the building) and their contents.
The complainants say their property was impacted by storm/flood events on
3 March 2022
10 March 2022
7 April 2022 and
3 July 2022.
The complainants lodged two claims, one for the events in March and April (claim 1) and
another for the event in July 2022 (claim 2).
The insurer acknowledges there were storm events and there was storm water run-off into the
property. Accordingly, the insurer accepted an insurable event occurred. The insurer says
that some of the damage for which the complainants have sought cover is due to factors
specifically excluded under the insurance policy and it is entitled to limit its liability.
Complainants say the insurer’s settlement is insufficient
The insurer engaged several experts to assess the nature and the extent of the loss. Based
on the assessment findings, the insurer says the proximate cause of loss is faulty design or
workmanship of the building, which allowed water into the building. The insurer says such
losses are excluded under the terms and conditions of the insurance policy and payments
made to date are reasonable.
The complainants disagree with the insurer and say the insurer’s settlement is insufficient and
it (the insurer) has not reasonably demonstrated the relied exclusions are applicable in the
circumstances.
In the complainants ’ view, the claimed damage was caused by the weather events and
subsequent mould. In resolution, the complainants ask the insurer to pay the following:
> $3,600 for mould clean-up
> $10,290 for reinstatement of the decking and laundry doors
> $16,000 for replacement septic tank
> $9,119 for bathroom vanity
> $8,899 for air-conditioning units
> $4,175 for water tank.
Determination | Case number: 905683 Page 3 of 11
Insurer should increase the settlement
The panel has carefully examined the information available regarding the items in dispute.
For the reasons noted here, the insurer is required to increase its settlement for the building
damage.
Initial clean-up works
The complainants say the insurer’s appointed restorers failed to attend the site, this meant
the complainants needed to carry out the clean- up works. In line with the insurer’s internal
assessment, the complainants ask the insurer to pay $3,600.
The information available demonstrates the property was affected by several weather events
and given the remote location of the property, it would have been sometime before the insurer
could send out trades.
The panel is satisfied that the complainants’ actions were reasonable but does not consider
the claimed amount reasonable. This is because:
the complainants ask the insurer to pay $3600
this is based on $35 per hour for 102.85 hours
it is not in dispute the complainants did not incur these costs
the invoice was raised by the complainants themselves to the insurer and does not reflect
the actual costs incurred and is based on the complainants’ calculation.
Under normal circumstances, it is likely the insurer would have engaged its service providers
following claim lodgement and incurred some clean-up costs because of the claimed events.
The panel consider s the insurer’s offer of $2,450, to be a fair compensation for the time and
effort spent by the complainants for the clean-up.
External decking and laundry doors
The complainants say mould affected the external decking and laundry doors following the
weather events. This is due to high moisture (almost 100% humidity) in the air, creating fungi
spores and mould to grow in the damp areas around the property.
The insurer engaged builder LP to assess the loss and their report says the mould build-up is
from very moist environment as the decking is positioned low to the ground with no signs of
water drainage systems installed.
There is no dispute the decking and laundry doors are exposed to weather elements to some
extent as the laundry is outside on the decking.
The onus is on the complainants to show the damage was caused by an event covered by
the policy. It is not in dispute; the policy only intends to cover mould when it can be directly
linked to an insured event.
Given the exchanged material, t he panel is not persuaded by the complainants’ position. This
is because any mould (to the decking and laundry doors), on balance was from environmental
causes (high humidity) rather than the storm/flood event itself. In other words, this would have
likely occurred even if water did not enter the subject building during the weather events.
Water tank
The complainants ask the insurer to pay $4,175 for cleaning up the water tank on site. In the
complainants’ opinion, excessive water during the weather event s damaged the tank along
with sewage overflow.
Determination | Case number: 905683 Page 4 of 11
The insurer says there is insufficient evidence to demonstrate the water tank was cleaned
after the previous (fire damage) event and a valid claim has not been established.
There is no dispute the property was inundated by water and there was sewage overflow.
Regardless of the previous claim, the panel is of the view, on balance the tank required
cleaning as there was sewage (on ground) and likely contaminated the water tank.
It is fair the insurer pays $4,175 towards cleaning of the water tank.
Septic tank
The complainants say the septic tank requires replacement because it was damaged during
the weather events. The insurer says the complainants have not established a valid claim for
replacement costs of the septic tank because:
> the insurer cash settled the complainants for this tank under the previous claim
> the assessment of the tank showed firefighting foam in the tank indicating no repairs
had been undertaken since the previous claim
> the complainants have not demonstrated there is further damage to tank because of the
recent weather events.
It is AFCA’s understanding the previous (fire damage) claim was settled based on R’s quote.
R’s scope of works and quote does not include the septic tank. Therefo re, the panel does not
accept the insurer’s argument the previous claim settlement is relevant in the circumstances.
In saying that, the panel also does not accept the complainants’ position. This is because, the
complainants do not present sufficient expert evidence to demonstrate the septic tank was
damaged by the weather events and that it requires replacement because of the weather
events.
It is acknowledged the insurer has already paid the complainants for the clean-up works in
the amount of $1,100. The panel does not find the insurer liable for replacement costs of the
septic tank.
Air-conditioning units
The complainants say the air-conditioning units were affected by mould following the event
and requires replacement. Additionally, the complainants say the internal assessor also
recommended accepting this component. To this, the insurer says the mould was from
external conditions and there is no evidence to demonstrate they were damaged by the
claimed events.
The insurer engaged mechanical experts A to conduct testing of the units. Their service
report of 24 July 2022, says they were unable to test as there were people sleeping
underneath it and the complainants did not allow testing.
The information available does not show these units were impacted by water. Any mould, on
balance, was due to high humidity around the loss period. As previously noted in this section,
the policy does not cover such losses and it would not be fair for the insurer to accept liability.
It is not in dispute the policy only intends to cover mould when it can be directly linked to the
insured event.
The panel is not persuaded by the complainant’s position because any mould to the air
conditioning units was from environmental causes (high humidity) rather than the weather
Determination | Case number: 905683 Page 5 of 11
events. In other words, this would have likely occurred even if water did not enter the subject
building
The panel is satisfied that the insurer is entitled to deny this aspect of the claim.
Bathroom vanity
The complainants say the bathroom vanity was damaged because of the water ingress and
the insurer should cover the replacement costs at $9119.
The insurer relies on the report from its building consultant (IS) and says it is entitled to
decline cover for the internal resultant damage because the mould and water seepage into
the insured building resulted from faulty design and workmanship
The claim lodgement call and information available shows the bathroom was the main point of
water entry into the property. While the panel acknowledges IS ’s report findings, given the
nature of event and sheer volume of rainfall, the panel is of the opinion it is plausible water
(during the weather events) would have entered regardless of the issues, as detailed by IS.
IS says water may be trapped within the plinth of the vanity unit and disconnection of the
vanity unit is required. It is fair the insurer covers the costs to repair this item based on the
actionable quote from the complainants, in the amount of $9,119.
2.2 Should the insurer contribute further for the contents loss
claim?
Circumstances
As part of the initial emergency claim settlement, the insurer paid the complainants for the
following:
Emergency payment $5,000
Food loss $500
Fridge $3,700
Carpet $5,005
Washing machine, dryer, freezer $2,250.
These payments were organised by the insurer following the complainants ’ visit to the flood
relief centre. The complainants say they suffered a total-loss of the contents and the insurer
should pay an additional $250,000 (the sum insured amount).
The insurer says the complainants have not satisfactorily shown they suffered a total of loss.
This is because:
> the large pile of contents disposed by the complainants do not match the contents ’ loss
list
> it is not possible to store the claimed volume of contents in the garage
> many items could have been salvaged if the complainants had not exposed them to the
weather elements
> water entered the property because of inherent structural defects and excluded under
the insurance policy.
The complainants say excessive water (during the weather events) entered the bathroom,
and rooms affecting carpets in all rooms. Furthermore, humidity during this period was 99%
on many days leading to mould damage to their belongings, walls, doors and carpets.
Determination | Case number: 905683 Page 6 of 11
General contents
At the time of claim lodgement, the complainants say they started piling up mould affected
items and acknowledged it would be sometime before the insurer could access the site, due
to the remote location of the property and the circumstances of the loss.
In the absence of photographic evidence, it is unclear how much water entered the garage.
Based on the information available (including the claim lodgement call), water entered the site
(at floor level) via the bathroom and through the walls.
As detailed, the insurer cash settled $16,489.60 of the complainants ’ contents claim at the
crisis centre (being for Food Spoilage, Emergency Payment, Fridge, Washing Machine,
Dryer, Chest Freezer, Carpets).
The complainants say more than $360,000 of contents have been lost and seek the full
amount of their sum insured, that is, $250,000, less the $16,489.60 already paid.
It is the panel’s view that t he core issue here is whether the complainants have established
their loss.
The exchanged material includes several photographs of large amounts of household items
piled up outside the property awaiting collection, some of which show evident mould, others
which do not, and many which are simply not identifiable.
The insurer disputes that;
the large amount of contents could have fitted inside the shed-house,
the items could have been damaged by the relatively limited water ingress reported.
Further, the insurer says that the complainants contributed to the loss by not removing the
water damaged carpets despite having been cash settled for the carpets and leaving the
items outside rather than attempting to salvage and remediate.
The complainants say that this is essentially the insurer's fault as;
the insurer told them to put the damaged contents outside as part of the clean-up,
the insurer’s allocated contractor never showed up, and
it took weeks for the insurer’s internal assessor to get to the property.
As stated, the complainants carry the initial onus to establish a loss for which they are
covered. This includes establishing the extent of their contents ’ claim.
Based upon the exchanged material, the panel is satisfied that some damage to contents was
caused by the weather events and that an insured event and some damage has been
established.
Further, there was water ingress, contents got wet and it is reasonable to infer that some of
the contents got mouldy. Further, some of the mouldy contents were not repairable.
In terms of mitigation, the panel is satisfied that both parties could have done more. While the
complainants should have taken photographs to show the damaged items in place or as soon
as possible on removal, and perhaps disposed of too many contents outside, the insurer does
not dispute
that it told the complainants to dispose of damaged contents, or
that its allocated internal assessor did not attend promptly, and
that there was clearly mould damage to contents when the assessor finally arrived at the
property.
Determination | Case number: 905683 Page 7 of 11
In addition, t he insurer says that as the water ingress was proximately caused by faulty
design or workmanship, the general exclusion applies, and that even if the water ingress
caused the mould, the contents ’ claim is simply not covered.
Based upon the expe rt evidence, the panel is satisfied that there were some issues with the
design (in particular, slopes and drainage) and construction (elevation and waterproofing)
which contributed to the loss.
However, the panel do es not think that IS goes so far as to warrant a conclusion that the truly
enormous volumes of rain were not the proximate cause of the loss.
IS details:
Torrential rainfall has been directed towards the external walls, resulting in ponding
water to the external walls. Seepage has then occurred through the exposed single
skin, masonry walls, entering the Bathroom and Bedrooms 2 & 3.
The panel also believes it is relevant, in terms of the applicable standard to which the
structure should be held, that the insurer knew that the insured building was a temporary
shed renovation and had put in writing that the complainants’ insurance would be unaffected
by the fact the shed did not have an occupation certificate.
The result is that the panel is not satisfied that the insurer has met its onus to establish the
application of its policy exclusion for faulty design or workmanship.
In the circumstances, the panel is satisfied it is fair and reasonable for the insurer to allow
20% of the contents’ sum insured (which is the maximum the policy allows for contents stored
outside).
The additional payment the insurer is required to make for contents is $33,510.40. That is,
$50,000 (20% of the contents ’ sum insured) less the amount already paid ($16,489.60).
On balance, some of the electrical items were damaged by power outage
The complainants say several electrical items were damaged due to power loss during the
claimed weather event. This is consistent with the complainants’ description of the event at
the time of claim lodgement.
On balance, the panel accepts it is possible for such damage given the nature of the event.
Any item connected to power would have been impacted. Furthermore, the insurer
acknowledges the fridge was affected by fusion and this item has been already settled.
While the panel accepts the insurer did not have an opportunity to assess these items, the
panel also acknowledges the items were disposed of based on the insurer’s advice at the
time of claim lodgement. It is fair the insurer covers the electrical items.
For clarity, the panel is only referring to items which would normally be connected to a
switchboard at the time of loss, such as the televisions etc. The insurer should cover the
electrical items either by replacing them or via cash settlement based on retail costs.
The complainants are required to co-operate with the insurer and provide all relevant
information available including the make/model numbers of these items.
For the sake of completeness, the panel confirms that this allowance for electrical items is in
addition to the allowance for contents items above.
Determination | Case number: 905683 Page 8 of 11
Other damage
The complainants say their spectacles were accidentally damaged during the weather events.
Although the loss happened during the claimed events, the panel does not accept the
weather events are the proximate cause of the loss. The complainants should consider
lodging a separate claim for this loss, so the insurer can assess its liability.
2.3 Are the complainants entitled to any compensation for the
claim handling?
Compensation is awarded conservatively
Under the AFCA Rules, we may award compensation (capped at $5,400 each) for financial
and non-financial loss where complainants have suffered an unusual degree or extent of
physical inconvenience, time taken to resolve the situation or interference with their
expectation of enjoyment or peace of mind.
We take a conservative approach to compensation for financial and non-financial loss. It is
not awarded when a person suffers the normal degree of inconvenience when a problem
occurs.
Having considered the information available, the panel is satisfied the insurer handled the
claims reasonably overall. The insurer is not required to pay any compensation to the
complainants.
Other matters
The complainants raised numerous allegations against the insurer in relation to their general
conduct and procedures. AFCA aims to resolve individual complaints as a free alternative to
the courts. We are not a regulator of the financial services industry, and we do not consider
general complaints about an insurer’s procedures, staff training, advertising, or customer
service.
2.4 Why is the outcome fair?
The catastrophic events leading to the claim were devastating and the panel acknowledges
the challenging circumstances faced by the complainants. However, it would not be fair to
require the insurer to accept full liability when part of the claimed loss, on balance, was not
caused by the claimed weather events or has not been established by the complainants.
Determination | Case number: 905683 Page 9 of 11
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 905683 Page 10 of 11
3.2 Policy wording
Determination | Case number: 905683 Page 11 of 11
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.