Claim declined for foundation and brickwork damage from a leaking water main, on the basis of earth movement and gradual causes exclusions
Text of the determination
Determination
Case number 905484
Financial firm Strata Community Insurance Agencies Pty Ltd
Determination | Case number: 905484 Page 1 of 9
Case number: 905484 9 May 2023
1 Determination overview
1.1 Complaint
The complainant is a body corporate insured under a residential strata insurance policy with
the financial firm (insurer) covering several units. The complainant is represented by the
chairman of the body corporate. References to the complainant will include both him and the
body corporate.
The complainant lodged a claim for damage to the foundations and brickwork of units one
and five due to a leak in a water main between the units.
The insurer declined the claim. It says the damage is more consistent with earth movement
that has been present prior to the leaking pipe event occurring. The insurer says any loss or
damage arising from long term, gradually operating causes or defects, errors or omissions to
the property, or as a result of faulty or defective workmanship or materials, is excluded from
cover under the policy.
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
No. The information shows the leaking pipe caused the cracking damage to units one and
five. I am satisfied the cause of damage was sudden and accidental. I also cannot be
satisfied the insurer has shown an exclusion applies to the damage claimed.
Why is the outcome fair?
Given the policy covers the claimed damage, it would be unfair for the insurer to decline
cover.
1.3 Determination
This determination is in favour of the complainant.
The insurer is to pay the complainant:
$62,000 for the repairs to underpin unit one
$62,100 for the repairs to underpin unit five
$236.50 for safety barrier outside unit one
$1,155 for the cost to investigate and report on the leak.
Interest is payable on these amounts under section 57 of Insurance Contracts Act 1984 (Cth),
from 7 April 2022 to the date of payment of the claim.
Determination | Case number: 905484 Page 2 of 9
2 Reasons for determination
2.1 Is the insurer entitled to decline the claim?
No. The information shows the leaking pipe caused the cracking damage to units one and
five. I am satisfied the cause of damage was sudden and accidental. I also cannot be
satisfied the insurer has shown an exclusion applies to the damage claimed.
Complainant has initial onus to establish loss covered by terms of policy
It is accepted insurance law that the complainant carries the initial onus to establish, on the
balance of probabilities (that is, more likely than not), a loss which is covered by the terms
and conditions of the policy.
Only if the complainant can do this, will the duty shift to the insurer to show, on balance, it is
entitled to decline cover in line with the policy wording or otherwise.
Policy covers accidental loss or damage not otherwise excluded
The policy covers loss or damage during the period of insurance. The product disclosure
statement (PDS) defines loss or damage as:
direct physical loss of, destruction of, or damage to property from any sudden and
accidental cause not otherwise excluded by this Policy.
This cover is subject to conditions and exclusions. The insurer refers to the following
exclusions:
1. We will not pay for Loss or Damage:
…
(c) (i) caused by moths, termites or other insects, vermin, mice, rats, rust or
oxidisation, mildew, mould, contamination or pollution, wet or dry rot, corrosion,
gradual corrosion or deterioration, change in colour, dampness of atmosphere or
other variations in temperature, evaporation, disease, inherent vice or latent
defect, loss of weight, change in texture or finish or pecking, biting, chewing or
scratching by birds or animals;
(ii) caused by Wear, Tear, fading, concrete or brick cancer, gradual deterioration
or developing flaws;
(iii) caused by lack of maintenance or failure to maintain Your Insured Property in
a reasonably good state of repair.
However We will pay if any of these causes directly results in Loss or Damage
from any other Event claimable under Section 1 such as fire or glass breakage.
(d) caused by non-rectification of an Insured Property defect, error or omission
that You were aware of, or should reasonably have been aware of.
…
(g) caused by vibration or from the removal or weakening of or interference with
the support of land or buildings or any other property, Erosion or Earth Movement.
However We will pay if the Loss or Damage is due to:
(i) earthquake or seismological disturbance, Tsunami, explosion, physical impact
by aircraft;
Determination | Case number: 905484 Page 3 of 9
(ii) bursting, leaking or overflowing of water tanks, pipes, drains, gutters or other
water or liquid carrying apparatus; and
(iii) Flood if Optional Cover 1 is shown as included on Your Schedule.
…
(m) due to normal settling, creeping, heaving, seepage, shrinkage, or expansion
in buildings, foundations / footings, walls, bridges, roadways, kerbing, driveways,
paths, garden borders and other structural improvements.
Complainant says water leak caused the claimed damage
There is no dispute repairs were undertaken to unit one in around 2014/2015. The report from
the previous repairer dated 15 November 2014 noted building movement to unit one and
provided an invoice for works carried out to the foundation and correction of the concrete
slabs.
The complainant says movement since those repairs has been minimal. He says it is only
since the water pipe leak in 2020 that there has been significant movement, not ongoing
movement since 2014.
The complainant provided a report from a plumber (PD) dated 7 October 2020. PD stated it
found a water leak between units one and five under the footing of the brick fence work which
was attached to both properties. It stated it was leaking at roughly two litres per minute, and
in its opinion, has caused the soil to be washed away from the footing, causing the footing to
drop and cause damage to the properties.
The complainant referred the claim to the previous insurer which was on risk prior to the
current insurer. The previous insurer engaged an engineer (MB). MB attributed the movement
damage at units one and five to a water leak event that was repaired in 2020.
MB‟s report dated 25 May 2021 stated:
the property consists of ten single-storey units, with a common driveway/ parking area
movement to unit one had previously occurred some time ago, with actions taken in 2014
to address those movements, with subsidence occurring to the eastern-most corner of the
unit and repairs were undertaken to stabilise the area
more movement was noticed to units one and five in 2020, and in September/October
2020, an investigation found a leaking water-supply pipe below a brick fence adjoining the
units
it was not possible to confirm how the pipe was damaged or when the leakage first
occurred
there was evidence of minor ground movement to other building elements throughout the
property, however these were insignificant compared to those that have occurred in close
proximity to the recently repaired water leak.
MB concluded:
4.2 From my inspection I can confirm that significantly severe movement to
various elements of units #1 and 5, and elements to other common-property, have
occurred in close proximity to a water-leak recently repaired in October 2020.
4.3 Movement has also occurred elsewhere throughout the property of 10 units,
although to a much lesser extent of severity. From my inspection, it was clear that
Determination | Case number: 905484 Page 4 of 9
movement as illustrated in Photo Nos-2 thru 10 has resulted from the leaking pipe
as described in the plumber‟s -report provided with your instruction.
4.4 As with the majority of properties throughout [the complainant‟s area] , it is
highly likely that prevailing soils to this property are reactive clays. Reactive clay
will shrink/swell in volume according to variations in moisture content of those
soils. Considering the water-leak was quantified at 2 litres/minute, those soils
within reasonable proximity will have been saturated, resulting in significantly
large soil-swelling and movement to overlying building elements, consistent with
those movements as seen in my inspection.
4.5 Accordingly, I have no hesitation in attributing the movement damages to
various elements of units #1 and 5, and elements to other common-property, to
the water leak event which was repaired in October 2020.
4.6 The date of commencement of the pipe-water-leak is unknown, as advised by
[the chairman] during my inspection. Also, from observations at the time of my
inspection, it was also not possible to confirm when the leak may have first
occurred. I can only suggest that a leak of this magnitude, causing saturation to
the surrounding soils, should have been discovered relatively quickly by residents,
or by others during regular grounds/garden maintenance (lawn-mowing).
MB provided a further report dated 13 February 2022. MB stated:
the insurer‟s engineer‟s report does not change its opinion that the cause of damage was
the water leak
the water leak is in close proximity to the units one and five, and located centrally between
them
no other similar damage occurred to any of the other eight units in the complex, with the
damage only occurring to the two units immediately adjacent to the water leak
the plumber‟s report measured the water leak at a rate of two litres per minute, which was
occurring for an unknown length of time, and being released only three metres from the
footings of units one and five
the leakage was occurring underground and at mains pressure, meaning it was occurring
under significantly high pressure.
MB stated:
As demonstrated in the paragraphs above, it can be readily appreciated that such
a large volume of water being released below ground, over a prolonged duration,
and under high pressures, will very easily propagate upwards and outwards
through the ground. That a proportion of this water has travelled laterally only 3m,
to the footings of units 1 and 5, is not only clearly conceivable, but highly likely. In
fact, given the high volumes, high pressure, and prolonged duration of this leak, it
should be expected that water migration has extended well beyond this distance.
The complainant says the insurer‟s engineer based its conclusion on the incorrect location of
the leak. He says the insurer‟s responses are inaccurate. He says there was no previous
movement or cracking in units two and five in 2014, as he was present at an inspection at the
time.
Determination | Case number: 905484 Page 5 of 9
Insurer says the damage is not covered
The insurer says the complainant has not established the claim falls within the covering
provisions.
The insurer engaged an engineer (DB) to inspect the property. DB concluded the water leak
was highly unlikely to have contributed to the building movement damage.
DB‟s report dated 29 October 2021 stated:
building movement cracking in and around unit five is very unlikely to be the result of, or
associated wi th, the leak in the water pipe „ due to the impossible travel path for any sub-
soil moisture, including approximately 2 to 4 metres up-slope, and under the existing
concrete footings for the brick fence ‟
the most likely cause of the movement cracking is years of ponding and pooling of
overflow roof water and surface water adjacent to the footings of unit five which have been
constructed in a highly reactiv e „H1‟ foundation soil
movement cracking in and around unit one is very unlikely to be the result of, or associated
with, the leak in the water pipe due to the impossible travel path for any sub-soil moisture
the most likely cause of the movement cracking to unit one is a continuation of the building
movement damage caused by the ground movements prior to the earlier attempts to rectify
damage completed in 2014/2015.
DB concluded:
all of the building movement damage we observed is most likely the result of
many years of ground movements however any contribution from a 2020 leak in
the water pi pe… is very unlikely due to the nature, characteristics & low
permeability of the natural foundation soil.
…
remains our opinion that the “trapped” ponding & pooling surface water, and the
absence of adequate surface water management is the most likely proximate
cause of the building movement damage that we observed.
DB provided further reports dated 18 November 2021 and 21 March 2022. In response to
concerns the complainant raised about DB basing the report on the incorrect location of the
leak, DB stated the location of the pipe repair does not adversely affect or compromise any of
the opinions in the report. DB stated:
It remains our opinion that the 2021 movement cracking in the brickwork on the
property is a continuation of the pre-2014 cracking in brickwork all caused by the
ground movement in the highly reactive foundation soil exacerbated by
inadequate footing design, failure to incorporate adequate articulation joints in the
brickwork, poor surface water management around the property, and garden,
shrub & tree growth.
The insurer says the loss or damage and the cause itself was not sudden and accidental as
the loss or damage has likely been occurring for many years, since at least 2014 and before
policy inception on 7 December 2019. It says MB‟s report refers to „subsequent movement‟
since 2014 and the fact the grout-injection works of 2014 were not successful in bringing the
walls back into their original position. The insurer says ground movement is indicative
throughout the premises.
Determination | Case number: 905484 Page 6 of 9
The insurer also says the leak itself was not sudden or accidental, with its internal assessor
finding the water pipe was damaged over time by rubbing action against the footing of the
brick fence. It says the loss has been occurring gradually over an extended period of time.
The insurer says the leak did not cause the earth movement. Rather, it says it may have
exacerbated pre-existing earth movement. It says both the movement and the leaking pipe
has arisen progressively over time from gradually operating causes.
The insurer also says the complainant has a duty to repair and maintain the property and that
includes regularly carrying out maintenance checks to ensure it is maintained in a good state
of repair.
Proximate cause of damage, on balance, was the leaking pipe
The information provided shows there have been movement issues at this property over the
years. This included in 2014 when works were completed to rectify movement issues to unit
one.
However, I am also satisfied there was a significant water leak event in around 2020. PD
located the leaking pipe and stated it had been leaking at roughly two litres per minute. As
MB stated, this is a significant amount of water to be leaking into the soil for an unknown
period. It is unclear from the information provided when the pipe first started leaking.
However, it is clear it was leaking during the period of insurance and therefore any damage
attributable to the leak also occurred during the period of insurance.
The two engineering reports provide conflicting opinions on the cause of damage. While DB
refers to ongoing issues with the movement at the property, I do not consider it has
adequately considered the significant volume of water from the water leak and the extent of
damage localised to the area of the leak. There is no dispute there is ongoing general
movement to the entire property. However, DB has not adequately addressed why the
significant movement damage is localised to the area close to the water leak.
I also consider DB has incorrectly located where the pipe was repaired in its report. It refers to
an area outside the property and uses this location to support the conclusions in the report.
However, the report from PD, the plumber that located the leaking pipe, provided
photographs of the location of the leak, which was inside the property near the gate. I
consider this factual error raises concerns with DB‟s conclusions.
DB also says the cause of damage is the same as the cause of the damage in 2014.
However, it is unclear how DB has concluded on the cause of the 2014 damage when it does
not appear DB was involved in any aspect of the 2014 repairs. It does not adequately explain
this conclusion.
I consider MB‟s conclusions regarding the wat er leak causing the cracking damage to units
one and five to be more persuasive. The conclusions are logical and plausible. The fact the
significant cracking to the property is localised to the area of a significant water leak means I
consider, on balance, the proximate cause of the damage to units one and five was the water
leak.
Complainant has established a loss covered by the terms of the policy
The policy covers damage to property from any sudden and accidental cause. Accidental is
not defined in the policy but is generally considered to mean damage the insured did not
intend or expect.
Determination | Case number: 905484 Page 7 of 9
The insurer says its internal assessor concluded the water pipe was damaged over time by
rubbing action against the footing of the brick fence. However, it is unclear how the assessor
concluded this. The expert reports do not comment on how the pipe was damaged.
I am satisfied the leak was unintended and unexpected from the complainant‟s perspective.
This means it was accidental.
None of the experts can conclude how long the leak has been occurring. There is insufficient
information to show the pipe started leaking due to wear and tear or any other gradual
process. I consider, based on the description of the damage from the complainant, that the
damage can fairly be considered sudden from his point of view.
I am also satisfied the damage occurred during the period of insurance. This means the
complainant has established a loss which is covered by the terms and conditions of the
policy. The onus now shifts to the insurer to show it is entitled to decline the claim.
Fair for the insurer to accept the claim
I do not consider the insurer has established the exclusions referred to apply to the claim. The
information shows the proximate cause of the damage was the leaking pipe, not gradual
deterioration in the ordinary course of events, or a failure to maintain the property. There is
also insufficient information to show the pipe leaked due to wear and tear or lack of
maintenance.
I cannot be satisfied the damage is due to a defect the complainant should reasonably have
known about or due to a failure to maintain the property. The information shows after the
complainant first became aware of the damage, he arranged for the pipe to be repaired
promptly.
The policy also excludes earth movement. However, this does not apply if the damage is due
to a leaking pipe. I am also satisfied it was the leaking pipe, not normal settling, that caused
the damage. These exclusions therefore do not apply in the circumstances.
The complainant has established a claimable loss with respect to the external cracking to
units one and five and the fence between the units. The insurer has not established the
application of a relevant policy exclusion. The insurer must accept the claim and settle it in
accordance with the policy terms.
The complainant provided several invoices and quotes in support of the loss. I consider it fair
for the insurer to cash settle the following:
$62,000 for the repairs to underpin unit one
$62,100 for the repairs to underpin unit five
$236.50 for safety barrier outside unit one.
The policy also includes the following benefit:
9. Exploratory costs, Replacement of defective parts
When Your Insured Property suffers Loss or Damage as a result of:
(a) bursting, leaking, discharging or overflowing of water tanks, water apparatus
or water pipes; or
(b) bursting, leaking, discharging of gas tanks, gas apparatus or gas pipes; or
(c) leakage of oil from any fixed oil installation, including tanks, apparatus and
pipes;
Determination | Case number: 905484 Page 8 of 9
We will pay the reasonable costs of locating the cause of the Loss or Damage
and for any Loss or Damage caused in locating the leak.
We will also pay:
(i) up to $1,000 for the repair or replacement of the defective part or parts of such
tanks, apparatus, pipes or other installations giving rise to the Loss or Damage;
and
(ii) up to $1,000 to rectify contamination damage or pollution damage to land at
Your Situation caused by the escape of the liquid giving rise to the Loss or
Damage.
We will not pay for any of these costs if the bursting, leaking, discharging or
overflowing is caused by a building defect, building movement, faulty
workmanship, rust, oxidation, corrosion, Wear, Tear, gradual corrosion, gradual
deterioration, Earth Movement or by trees, plants or their roots;
This means the insurer is liable for the invoice to investigate and report on the leak for
$1,155.
Interest is payable on all of these amounts under section 57 of Insurance Contracts Act 1984
(Cth), from 7 April 2022 to the date of payment of the claim.
Insurer has not established prejudice
The insurer says the complainant prejudiced the insurer by delaying the lodgement of the
claim, which it says was seven months after the date of loss. The insurer refers to sections of
the policy that require prompt notification of a claim and that it is entitled to reduce its liability
on a claim to nil if the complainant fails to comply.
The complainant says he did not intentionally delay informing the insurer of the claim or fail to
allow an assessor to inspect the property. He says he was following instructions from the
previous builder and expected it to repair the damage under warranty, in which case, the
complainant would not have required to claim on insurance. The complainant says after
lodging the claim, the insurer took seven months to arrange an engineer to attend the
property, so he does not consider the delayed notification of the claim prejudiced the insurer‟s
interests under the policy.
The complainant says the body corporate acted promptly in investigating the leak and
repairing it urgently, which shows it mitigated its loss.
Based on the information provided, I cannot be satisfied the insurer has shown the
complainant‟s delay in lodging the claim prejudiced the insurer‟s interests to allow it to reduce
its liability on the claim. The information shows the insurer was able to appoint an expert to
assess the loss and form an opinion on the cause of damage. The information does not show
the delayed notificat ion of the claim impacted the insurer‟s ability to adequately assess the
loss.
This means the insurer is not entitled to reduce its liability on the claim.
Determination | Case number: 905484 Page 9 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.