Home / IAG / Determination 904724

Determination 904724

Dispute over scope of works and extent of water damage from a leaking pipe; cash settlement amount

FirmIAG
Decided2023-04-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$12,494
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Mr J's home insurer accepted a leaking pipe caused water damage but disputed the extent and scope of repairs, with conflicting expert reports. AFCA rejected all the scopes of works, set its own, and required the insurer to cash settle for $12,494.40.

Applying the policy terms, AFCA found no expert scope fair, attributed 80% of the damage to the covered leaking pipe and 20% to waterproofing, and set a cash settlement that excluded items Mr J must pay.

Issues

Subjects and remedies

home or building damagepay claim

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 904724 Financial firm Insurance Australia Limited Determination | Case number: 904724 Page 1 of 10 Case number: 904724 4 April 2023 1 Determination overview 1.1 Complaint The complainant (Mr J) holds a home and contents insurance policy with the financial firm (the insurer). He made a claim for water damage to his bathroom, laundry and toilet. The insurer appointed a plumber (SAPLL) and a builder (UT) to inspect the damage and provide reports. The complainant disagreed with their conclusions. The complainant appointed a plumber (APH) to report on the cause of the damage and its extent. APH‟s report was provided to the insurer with a scope of works. The insurer accepted the damage was from a leaking pipe inside the masonry wall at the shower point but does not accept the scope of works proposed by APH. The insurer appointed a building consultant and engineer (CFT) to report on the extent of the damage and to provide a scope of works. Mr J does not accept CFT‟s conclusions on the extent of the damage or its proposed scope of works. The insurer says it is unable to determine the extent of the damage and the repairs required. It proposed to arrange a joint assessment by CFT and APH (at its cost) to determine the cause and extent of the damage. The complainant says this is unnecessary and unfair. He says the insurer should accept APH‟s report and repair the home in accordance with APH‟s scope of work. 1.2 Issues and key findings Should the insurer accept APH’s scope of works to resolve the complaint ? No. The insurer should cash settle Mr J‟s claim based on the scope of works in Section 3.2 of the determination. Why is the outcome fair? The outcome is fair because it brings finality to this complaint. It is also fair because the remedy has regard to the policy terms as it relates to those costs the insurer has agreed to cover in the policy and costs that are the responsibility of Mr J. 1.3 Determination This determination is substantially in favour of the complainant. The complainant has 30 days to accept the determination. If he accepts the determination, the insurer must cash settle the complainant‟s claim by paying $12,494.40. Determination | Case number: 904724 Page 2 of 10 2 Reasons for determination 2.1 Should the insurer acc ept APH’s scope of works to resolve the complaint? There are four possible outcomes to this complaint The financial firm accepts the cause of the damage is a leaking pipe inside a masonry wall at or near the shower in Mr J‟s bathroom. It also accepts that the policy responds to Mr J‟s claim. However, it says it is unable to determine the extent of the damage based on the expert reports from a plumber it appointed (SAPPL), a builder it appointed (UT), a building report from APH (appointed by Mr J) and a building consultant and engineer (CFT). It has suggested as a possible resolution to this complaint that CFT and APH attend Mr J‟s home, at the insurer‟s cost, to review the damage and provide:  a joint report on the extent of the damage, and  a scope of works. Mr J says this is unfair and wants the insurer to authorise the repairs based on the scope of works prepared by APH. I consider that there are four possible outcomes in this complaint. Those possible outcomes are that I either:  confirm the insurer‟s sug gested resolution proposal  accept APH ‟s scope of works  accept any one of the scopes of work provided by UT, SAPLL or CFT  make my own findings on the extent of the damage and provide a scope of works. The policy terms are relevant to the outcome of this complaint The policy and certificate of insurance (COI) read together form the insurance contract. The COI confirms Mr J had selected standard cover and identifies that replacement cover is a key policy feature (amongst other things that are not relevant to this complaint). The policy says the coverage for water and oil leaks includes the cost of locating the leak but does not cover the costs to repair or replace the item that the water or oil leaked from. The policy also provides for “other cover”, includi ng:  the cost of demolishing and removing debris  the reasonable costs Mr J has paid to find the cause of the damage  reasonable costs for temporary accommodation  costs to meet current building regulations to repair or rebuild the part of Mr J‟s home that was damaged (but not for undamaged parts of Mr J‟s home). Under the heading “What we pay for – Buildings Insurance” the policy says the insurer it will cover the cost to repair or rebuild the part of Mr J‟s home that was damaged “whichever is lower”. I do not accept the scope of works proposed by SAPLL and UT The first report prepared in this complaint was by SAPLL. SAPLL are plumbers and leak detection specialists. Determination | Case number: 904724 Page 3 of 10 I am satisfied SAPLL comprehensively tested the plumbing in Mr J‟s bathroom. It noted the presence of water damage to areas common to the bathroom, laundry and hallway with high levels of moisture adjacent to the shower alcove, basin, toilet and laundry trough. It was its view that 80% of the damage has been caused by “plumbing failures” and 20% b y waterproofing failures. However, SAPLL‟s report is primarily concerned with the cause of the damage and its views on the extent of the damage caused by the leaking pipe are lacking in detail. In particular, it does not make any conclusion on the extent of the damage caused by the leaking pipe. Nonetheless, SAPLL recommended the following rectification works:  replace the shower rise  replace the shower tapware  repair the bathroom floor waste riser to grate connection  upgrade shower alcove waterproofing to Australian Standard AS374002010 and Ministers Specification S.A.F1.7 2004 (which involves the removal of floor and wall tiling in the shower alcove , the installation of the waterproofing membrane and a puddle flange). I note SAPLL‟s does not allocate those rectification works that Mr J would need to pay for under the policy (for example, the cost to repair or replace the leaking pipe) and those that would be the responsibility of the insurer. I also do not consider that SAPLL could reasonably form a view on a scope of works without providing further detail of the extent of the damage. UT observed:  there was water damage to render and plaster in the bathroom wall adjacent to the shower rose and the base of the laundry wall  the exterior walls were dry  there was no sign of any water damage to the toilet walls or the base of the laundry wall between the toilet and bathroom entrances. The scope of works suggested by UT was:  in the bathroom: > removal of approximately 400mm x 400mm of render/plaster above the tile line adjacent to the shower rose > take steps to dry the area exposed by the removal of render/plaster > reapply plaster and paint the wall  in the laundry: > removal of approximately 350mm x 350mm of render/plaster from the base of the wall between the bathroom entrance and the trough > take steps to dry the area > reapply plaster and paint the wall. However, it is clear from UT‟s report that its scope of works only “reflected the visible resultant damage”. UT also concluded th at Mr J would be required to:  bring the bath/shower and wet area up to Australian Standard AS374002010 and Ministers Specification S.A.F1.7 2004 (which would include the removal and replacement of the shower/bath hob, wall and apron tiles and the application of the waterproof membrane)  repair the leaking pipe servicing the shower rose, and  service shower tapware. I do not accept UT‟s scope of works as being sufficient having regards to the terms of the policy. The policy provides cover for reasonable costs to meet current building regulations to repair or rebuild the part of Mr J‟s home that was damaged. It follows that Mr J should not be Determination | Case number: 904724 Page 4 of 10 required to bear the costs of bringing the bath/shower and wet area up to Australian Standard AS374002010 and Ministers Specification S.A.F1.7 2004 as it has suggested in its report. I therefore do not accept the scope of works suggested by either SAPLL or UT. APH ’s report cannot be entirely relied on APH says it made a visible inspection of the bathroom, toilet and laundr y and used a moisture detection metre to assess the extent of the damage. Based on its visual inspection and moisture metre readings, APH said the following walls were water damaged:  all four bathroom walls  the laundry wall that adjoins the bathroom and toilet  the wall between the bathroom entrance and the laundry trough  the toilet wall that adjoins the bathroom  the wall that continues from the bathroom. APH‟s scope of works is comprehensive and includes:  the removal of render and plaster from all affected walls to allow drying time  the application of new render and plaster  the removal of all bathroom elements (vanity, bath, shower screen, towel rails etc)  the removal and reinstallation of the laundry trough, tapware and plumbing fittings  the removal of wall tiles from all bathroom and two toilet walls  the supply and application of a waterproof membrane  supply and installation of new wall tiles, grout and silicone  the reinstallation of existing bath (with a new bath frame)  the reinstallation of existing tapware and plumbing fittings  the reinstallation of all bathroom elements  painting  skip hire  portable ensuite hire. APH then identifies what it considered to be works that Mr J would need to do at his expense:  the repair of the leaking pipe  the cost to service the shower tapware  the application of a waterproof membrane to the concrete slab flooring in the bathroom  the tiling, grouting and sealing of the bathroom floor. Having regard to the policy terms, I agree that Mr J (not the insurer) would need to pay for the above. This is because the policy excludes:  costs to repair or replace the item that the water leaked from, and  costs to meet current building regulations to repair or rebuild undamaged parts of Mr J‟s home (as the floor is undamaged). There is no evidence of water damage to the bathroom floor. I accept that all walls that APH has identified as water damaged present with high moisture metre readings, but I do not accept that 100% of the damage has been caused by the leaking pipe in the masonry wall at or near the shower rose. The APH report does not provided sufficient evidence to prove this. I acknowledge the moisture metre readings, but those readings, on their own, do not prove that all the walls contain moisture caused by the leaking pipe in the masonry wall. Determination | Case number: 904724 Page 5 of 10 CFT ’s reasoning and scope of works cannot be accepted CFT‟s report on the extent of the damage and recommended scope of works was the result of “a desktop review” of the SAPLL, UT and APH reports. I do not accept CFT‟s conclusion there are no matters in the UT report that “warrant concern”. As noted above, I do not accept UT‟s scope of works as being sufficient having regards to the terms of the policy. CFT also appears to accept SAPLL‟s report without criticism. I agree with CFT ‟s observation that SAPLL had deployed a comprehensive testing regime. However, as I have already noted, SAPLL‟s report is primarily concerned with the cause of the damage. As I have already noted above, SAPLL‟s findings on the extent of the damage caused by the leaking pipe are lacking in detail. I do not agree with CFT‟s opinion that APH‟s report cannot be relied on for any purpose. However, as I have stated above, I do not accept that 100% of the damage APH had identified was caused by the leaking pipe in the masonry wall. I accept SAPLL‟s finding that 80% of the damage is from “ plumbing failures ” and 20% waterproofing. This is because SAPLL conducted deluge testing which identified a waterproofing issue. I appreciate that SAPLL identified “ other plumbing ” issues that it felt contributed to the damage, but its report didn‟t attribute any percentage to the different „problematic‟ plumbing elements. My reading of SAPLL‟s report is that the leaking pipe in the masonry wall is the largest contributor to the damage. On that basis, and in the absence of information to the contrary, I am satisfied that the leaking pipe is responsible for the damage to Mr J‟s bathroom, laundry and toilet. The appropriate remedy is for the insurer to cash settle Mr J’s claim I do not accept that any of the scopes of work proposed by APH, UT, SAPLL or CFT would result in a fair outcome in this complaint. I also not consider that the insurer‟s proposal for APH and CFT to jointly attend and agree on a scope of works is going to be a workable solution. This is because APH has not indicated any willingness to co-operate with CFT (as outlined in CFT‟s report) . It is also unlikely that CFT would agree to anything that APH would contribute to that process having regard to comments made about APH in its report. I am satisfied the appropriate remedy is for the insurer to cash settle Mr J‟s claim. This is because:  the works required to remediate the damage caused by the leaking pipe will be necessarily involve the removal of render and plaster and effectively mean a full bathroom renovation  it is necessary to attribute 20% of the damage to waterproofing failures  it is necessary to account for work Mr J will be required to pay for under the terms of the policy. While I do not accept APH‟ s scope of works for the reasons I have already stated, I consider that it is a comprehensive scope of works and therefore an acceptable starting point for me to set out a fair scope of works in the circumstances. I have set out Section 3.2 below the work the insurer is to pay for and those works Mr J is to pay. The scope of works takes into account the important policy terms I identified above. Specifically, the insurer‟s obligation to cover:  demolition costs and Determination | Case number: 904724 Page 6 of 10  costs to meet current building regulations to repair or rebuild the part of Mr J‟s home that was damaged. The cash settlement amount is $12,494.40. See Section 3.2 for details. 2.2 Why is the outcome fair? The outcome is fair The outcome is fair because it brings finality to this complaint. It is also fair because the remedy has regard to the policy terms as it relates to those costs the insurer has agreed to cover in the policy and costs that are the responsibility of Mr J. It also fairly attributes 20% of the damage to a cause that was not covered by the policy. The insurer’s initial denial letter was not fair I am satisfied the insurer has mostly dealt fairly with Mr J in its assessment of the cause and extent of the damage. However, there is one aspect of the insurer‟s assessment that warrants calling out. The insurer‟s claim denial letter of 13 April 2022 refers to the faulty design and workmanship exclusion in its policy as its reason for denying many aspects of Mr J‟s claim. It is unclear to me how the insurer could rely on the exclusion where the UT and SAPLL reports do not mention any design or workmanship issues as a cause of the damage. This was, in my opinion, unfair. However, I do not accept this unfairness has caused any loss, whether a direct financial loss or a non-financial loss. Determination | Case number: 904724 Page 7 of 10 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness I have determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). There has been a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. 3.2 Scope of works Room Room measurement / Scope Qty Unit Rate Total (inc GST) Insurer or Mr J Bath (1.9 W x 1.8 D x 2.25 H) m 1 Removal of vanity unit including tapware and plumbing fittings 1.5 hr $60.00 $90.00 80% insurer 20% Mr J 2 Removal of bath tub including bathtub frame, tapware and plumbing fittings 1.5 hr $60.00 $90.00 80% insurer 20% Mr J 3 Removal of bath / shower screen, towel rails etc 1 hr $60.00 $60.00 80% insurer 20% Mr J 4 Removal tiles from 4 walls (13.32m2) 10 hr $60.00 $600.00 80% insurer 20% Mr J 5 Removal of compromised render, and plaster (15.03m2) 12 hr $60.00 $720.00 80% insurer 20% Mr J 6 Hire commercial dehumidifier to expe dite drying of brick walls 14 days $90.00 $1,260.00 80% insurer 20% Mr J 7 Once the 4 brick walls have dried out apply new render and plaster (15.03m2) 21 hr $75.00 $1,575.00 80% insurer 20% Mr J 8 Render and plaster 20 20kg bags $25.00 $500.00 80% insurer 20% Mr J 9 Once the render has dried apply waterproof membrane to the tiled section of the walls (13.32m2) 12 hr $100.00 $1,200.00 80% insurer 20% Mr J Determination | Case number: 904724 Page 8 of 10 10 Remove floor tiles , Waterproof membrane for the floor and lay new tiles (incl tile glue, grout and seals) $2, 500.00 100% Mr J 11 Repair leaking pipe & service shower tapware $750 .00 100% Mr J 12 Waterproof membrane material 1 15kg tub $139.00 $139.00 80% insurer 20% Mr J 13 Once the waterproofing membrane has dried tile, grout and silicone the walls (13.32m2) 21 hr $90.00 $1,890.00 80% insurer 20% Mr J 14 Wall tiles (+20% for offcuts) 16 m2 $35.00 $560.00 80% insurer 20% Mr J 15 Tile glue 7 20kg bags $36.00 $252.00 80% insurer 20% Mr J 16 grout 2 5kg bags $31.00 $62.00 80% insurer 20% Mr J 17 silicone 6 tube $18.00 $108.00 80% insurer 20% Mr J 18 Paint one wall (1.9m * 900mm) in colour to match as close to possible as existing (1.71m2) 2 hr $75.00 $150.00 80% insurer 20% Mr J 1 9 Paint 1 10L $135.00 $135.00 80% insurer 20% Mr J 20 Reinstall bathtub including bathtub frame, tapware and plumbing fittings 4 hr $100.00 $400.00 80% insurer 20% Mr J 21 Reinstall vanity unit including tapware and plumbing fittings 3 hr $100.00 $300.00 80% insurer 20% Mr J 22 Reinstall of bath / shower screen, towel rails etc 2 hr $60.00 $120.00 80% insurer 20% Mr J Laundry (3.2 W * 2 D * 2.25H) m 1 Removal of double laundry trough including tapware and plumbing fittings 1.5 hr $60.00 $90.00 80% insurer 20% Mr J 2 Removal of washing machine and plumbing fittings 0.5 hr $60.00 $30.00 80% insurer 20% Mr J 3 Removal of compromised render, and plaster from 2 walls (2.9m2) 3 hr $60.00 $180.00 80% insurer 20% Mr J 4 Hire commercial dehumidifier to dry out brick walls (Use same dehumidifier as for bathroom line item) 0 days $0.00 $0.00 N/a Determination | Case number: 904724 Page 9 of 10 5 Once the 2 brick walls have dried out apply new render and plaster (2.9m2) 4 hr $75.00 $300.00 80% insurer 20% Mr J 6 Render and plaster 5 20kg bags $25.00 $125.00 80% insurer 20% Mr J 7 Paint 2 walls (2.9m2) in colour to match as close to possible as existing 3 hr $75.00 $225.00 80% insurer 20% Mr J 8 Paint (use bathroom paint) 0 0 $0.00 $0.00 N/a 9 Reinstall double laundry trough including tapware and plumbing fittings 3 hr $100.00 $300.00 80% insurer 20% Mr J 10 Reinstall washing machine and plumbing fittings 0.5 hr $60.00 $30.00 80% insurer 20% Mr J Toilet (0.95 W * 1.8 D * 2.25H) m 1 Removal of wall tiles (0.3m2) 0.5 hr $60.00 $30.00 80% insurer 20% Mr J 2 Removal of compromised render, and plaster from 2 walls (1.4m2) 1.5 hr $60.00 $90.00 80% insurer 20% Mr J 3 Hire commercial dehumidifier to dry out brick walls (Use same dehumidifier as for bathroom line item) 0 days $0.00 $0.00 N/a 4 Once the 2 brick walls have dried out apply new render and plaster (1.4m2) 2 hr $75.00 $150.00 80% insurer 20% Mr J 5 Render and plaster 3 20kg bags $25.00 $75.00 80% insurer 20% Mr J 6 Once the render and plaster have dried tile 2 walls (0.3m2) 2.5 hr $90.00 $225.00 80% insurer 20% Mr J 7 Tiles (Use bathroom tiles) N/A N/A N/A N/A N/a 8 Glue, grout and silicone (Use from bathroom) N/A N/A N/A N/A N/a 9 Paint 2 walls (1.4m2) in colour to match as close to possible as existing 1.5 hr $75.00 $112.50 80% insurer 20% Mr J 10 Paint (use bathroom paint) 0 0 $0.00 $0.00 N/a Gen Exp 1 Portable ensuite hire 30 days $87.50 $2,625.00 80% insurer 20% Mr J 2 petrol and travel 100 L $1.50 $150.00 100% Mr J 3 consumables $200.00 80% insurer 20% Mr J 4 Skip bin 2 4m3 $400.00 $800.00 80% insurer 20% Mr J Determination | Case number: 904724 Page 10 of 10 Insurer‟s liabil ity (cash settlement amount) = $12,494.40 Mr J‟s liability = $6,523.60

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.