Home / IAG / Determination 904507

Determination 904507

Adequacy of cash settlement offer for storm damage building repairs, other costs and claim handling

FirmIAG
Decided2023-10-18
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$296,351
Non-financial loss$10,800
Amount claimed$114,765
SourceAFCA PDF

Summary

Complainants disputed the insurer's cash settlement offer for storm and mould damage to their home and its claim handling. AFCA required the insurer to increase the building settlement, cover moving costs and extended temporary accommodation, and pay $10,800 non-financial loss.

A cash settlement should be based on a fair scope of works with an adequate contingency, actionable quotes for mould, electrical, plumbing and landscaping, and the policy covers moving costs, while poor claim handling justified maximum non-financial loss compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay non financial loss

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 904507 Financial firm Insurance Australia Limited Determination | Case number: 904507 Page 1 of 9 Case number: 904507 4 October 2023 1 Determination overview 1.1 Complaint The complainants lodged a claim with the financial firm (the insurer) for damage to their property which occurred around February 2020 because of a storm event. Following assessments, the insurer partially accepted the claim subject to the policy terms and conditions. The insurer declared the contents a total-loss and made a cash settlement of $177,975. Meanwhile, the insurer authorised its preferred service provider(s) to carry out some of the building repairs, including mould remediation. The repairer completed some work. For the remaining repairs, including some rectification works, the insurer offered the complainants a cash settlement of $163,847.81. This was based on its builder’s scope of works and cost estimates with a 15% contingency. The insurer says its builder cannot undertake further repairs due to concerns of mould at the site which in the insurer’s opinion is u nrelated to the claimed event. The complainants say the cash settlement is insufficient to reinstate the property and does not cover other costs, including temporary accommodation and damaged contents. They also say the insurer mismanaged the claim and caused significant stress, delays and inconvenience. 1.2 Issues and key findings Should the insurer increase its offer for the building damage? Yes. The insurer’s offer does not reflect actionable costs and it is fair the insurer increases its offer as noted in section 2.1 of this determination. Should the insurer cover other costs? Partly. The complainants have not been paid for packing and relocating their contents. The policy responds to this. It is fair the insurer covers these costs under the insurance policy. Should the insurer pay non-financial loss compensation? Yes. The available information shows the insurer’s claim handling has caused unnecessary delays, stress and inconvenience. It is fair the insurer pays the complainants $10,800. 1.3 Determination This determination is substantially in favour of the complainants. Within 21 days of the complainants providing written acceptance of this determination, the insurer is required to make payments to the complainants as noted in sections 2.1, 2.2 and 2.3 of this determination. Determination | Case number: 904507 Page 2 of 9 2 Reasons for determination 2.1 Should the insurer increase its offer for the building damage? Complainants must show claimable loss under the policy The complainants are required to show, on the balance of probabilities (that it is more likely than not), that they suffered a claimable loss under the policy. This means they must show the loss was caused by a risk for which they are insured. The parties accept there is damage to the property from a storm event. This is an insurable event under the insurance policy. As such, the panel accepts the complainants established a valid claim. Complainants say the building is a total loss In the complainants’ opinion, the building must be treated a total loss. This is due to several reasons, including:  The insurer’s scope of works lacking items and is insufficient to carry out the works necessary to reinstate the property to its pre-loss condition  The insurer cannot complete works and provide the necessary warranty  There are concerns of ongoing mould at the property despite the insurer’s numerous mould remedial works.  It is necessary to carry out a complete strip-out of the property to reinstate the building. Insurer says its offer is fair The insurer says its builder would not be able to undertake repairs and provide warranty. Accordingly, it proposes to resolve the claim on a cash settlement basis. Based on the scope of works (SOW) and quote from its builder R, the insurer offered the complainants $163,847.81. This included a 15% contingency. The insurer says its offer is reasonable because R’s SOW covers the claim related repairs. It is reasonable for the claim to be cash settled The relationship between the parties has significantly deteriorated. This claim has been ongoing for a long time. The complainants do not dispute a cash settlement. The panel is satisfied it is fair the claim is cash settled as much as possible in order to provide finality to this longstanding matter. A cash settlement should be based on a fair scope of works. It should include an uplift for contingencies. This is to account for the potential of further variations, which is highly likely given this complicated claim, as well as the loss of the insurer’s lifetime guarantee . Complainants’ quote from K includes unsubstantiated scope of works The complainants provided quotes from several providers in support of their position. This included from a builder (P), a plumber (C), an electrician (E) and a landscaper (FM). The complainants are seeking a settlement based on K’s quote . In K’s opinion, the building needs a full re-instatement which will cost $735,834.29. Determination | Case number: 904507 Page 3 of 9 The exchanged information does not show the claim related damage cannot be repaired. In particular, the complainant’s quote from M demonstrates it is possible to complete mould remedia tion works to the property. No report, or other expert evidence, has bee n provided to show the only way to repair the claim related damage is to demolish and rebuild the property. Further, K’s quote includes several items without substantial evidence to show they are necessary and related to the claimed event. For example, K’s quote includes costs to: > remove and replace the roof, however the complainants have not provided evidence to show the roof requires full replacement because of the claimed event and/or the insurer’s works. > remove and replace the pool, however the complainants have not demonstrated evidence to show the pool is damaged because of the claimed event and/or by the insurer’s repairs and requires a full replacement. The available information, including the expert from CF, does not demonstrate damage to the pool. Given this, the panel is not persuaded the home needs to be rebuilt or that K’s quote is a fair estimate of the complainants’ loss. Insurer should increase its settlement offer for building repairs The complainants provided an alternate quote from P . P’s quote was for $149,223. This was fairly close to R’s quote of $142,476.36. It is not clear what scope of works P’s quote was based on. The complainants say this builder is no longer able to carry out the works. Given the exchanged information, th e panel generally accepts R’s quote more likely better reflects the scope of works related to the claim and can be used as the basis of settlement. It is not clear the scope of works P’s quote is based on. K’s quote appeared to be for a full rebuild which is not substantiated. The complainants say R’s estimate for kitchen repairs is insufficient . They say the original estimate was over $32,000. However , the panel notes P’s quote was fairly close to R’s quote and would have presumably included this. The panel is not persuaded by this argument. There are several aspects of R’s quote though that does not fully address some of the complainants ’ other concerns. This is set out below: A fair Contingency The insurer has allowed 15% contingency because it is unable to authorise the works. This should be increased to 25% because of the following:  the extent and complex nature of the works will likely require variations,  additional work will likely result from the additional mould remediation required (set out below),  R’s quote is not actionable, and  rates and costs have likely increased. Mould remediation The complainants say the insurer’s appointed service providers only took samples from the habitable areas. The insurer excluded areas, such as the undercroft, which is still accessible from the habit able areas. In the complainants’ opinion, the tests (done by the insurer) are not a true reflection of what is necessary to reinstate the property and clear the mould. Determination | Case number: 904507 Page 4 of 9 The insurer says it has effectively treated the mould caused by the claim. However, it has not addressed why the undercroft should not be remediated. Given this, the panel is not satisfied the insurer has adequa tely addressed the complainants’ concerns. In the circumstances, the insurer has not clearly established why it is not liable for additional remedial works in the undercroft area and other uninhabitable areas. The complainants provided a quote from M setting out the remediation works. The amount quoted was $61,268.80 . There is no information to show this is unreasonable. This is in addition to the building repairs as R’s quote does not adequately scope mould remedia tion works . Further, the panel accepts it is likely the complai nant s would need to carry out these additional works as noted in M’s quote to obtain warranty. The panel does not accept a contingency should be included. The amount is fairly significant, some mould remediation has already been done and this amount is actionable. Electrical wiring and appliances The complainants’ service provider says the electrical wiring have not been safely disconnected and require full re-wiring as part of the reinstatement. The insurer has not provided any evidence to challenge’s E findings. On balance, the panel accepts the E’s findings and their SOW to be actionable. R’s quote makes an allowance for electrical works. The panel has estimated this to be about $24,957.43 (including appliances and air-conditioning units). It is fair the insurer pays the difference between E’s quote and R’s allowance, bringing the total to $17,191.44 plus 25% contingency. Plumbing The complainants provided a quote from C and say the insurer’s estimate does not cover all the necessary works and does not represent an actionable quote. C’s quote includes costs to supply and connect the pool filter . The panel accepts this is likely necessary considering the pool has been empty for some time. C includes the cost to install new downpipes. In the panel’s opinion, there is insufficient evidence to show these works relate to the claimed event and/or any repairs undertaken by the insurer. Given these costs are not substantiated, the insurer is not required to cover this. Overall, the panel is satisfied C’s quote better represent s the works needed in relation to the claim and represents costs applicable to the complainants in the retail market and can be used as the basis of settlement. R's quote makes an allowance of about $7,369.98 for the plumbing works. It is fair the insurer pays the difference between R’s estimate and C’s actionable quote for all items except the downpipe, bringing the total to $18,961.28 plus 25% contingency. Landscaping The complainants say the insurer’s repairer left several metal shards (from roof works) on the property making it unsafe. The insurer does not dispute the complainants’ position and has allowed $196.36 to remove the metallic debris. In the panel’s view, R’s estimate is insufficient, and it is likely necessary to remove the soil given the safety concerns. The complainants’ quote from FM reflects actionable costs . This is because it includes costs to remove existing turf and re-lay. The insurer should increase its offer to include this cost, Determination | Case number: 904507 Page 5 of 9 $6,795.80. No contingency should apply given it is an actionable quote and is unlikely to have variations. Amounts payable by the insurer for building works The building claim should be settled in the following way:  $178,095.45 for the building repairs based on R’s quote including contingency  $ 61,268.80 for the mould remediation based on M’s quote  $21,489.33 for the difference in costs for electrical works including contingency  $23,701.60 for the difference in costs for plumbing works including contingency  $6,795.80 for the landscaping works. For clarity, the insurer is entitled to deduct any previous payments made to the complainants as cash settlement for the building repairs that is covered by the works above. Additional allowance for temporary accommodation and rental furniture is necessary The insurer agreed to cover the costs for temporary accommodation and rental furniture beyond the policy limit and say they will cover it for 6 months. Based on M’s quote , the mould remediation is expected to take a few weeks. Given the extent of damage, the panel considers it fair the insurer settles the complainants for 6 months (repair period, including the mould remediation) and an additional 4 weeks as contingency. The date begins from when payment is made following this determination. For clarity, this is in addition to previous payments. This should be calculated either on the weekly/monthly rent currently incurred by the complainants for temporary accommodation and rental furniture or a fair cost for such accommodation and costs in the local market. 2.2 Should the insurer cover other costs? Complainants seek $114,765 in compensation The complainants say they are seeking compensation of $114,765 from the insurer. This includes the following:  Loss of additional contents  Increased cost of living expenses including utility bills  Expired white good warranty  Costs to pack and move  Rental furniture and temporary accommodation – this has been addressed above  Delays and claim handling  Stress and anxiety The last two points will be dealt with in section 2.3. For the other matters, the panel notes the following. Insurer not required to make further payments for contents loss The complainants say the property was left unoccupied and without mould remedial attempts between 3 March 2020 and 11 May 2020. This caused mould to spread from downstairs (undercroft area) to all the floors. As a result, the complainants say they lost all their contents. In the complainants’ opinion, th e failure to complete mould remedial works led to additional contents loss of approximately $44,000. This is because they estimated their contents loss at Determination | Case number: 904507 Page 6 of 9 $213,998.37. They provided a spreadsheet with a list of contents and values placed next to them. The insurer says it cash settled the complainants for the contents based on the sum-insured amount of $177,975 in July 2020 and met its obligations under the insurance policy. There are several concerns with the complainants’ position. The spreadsheet has not been verified as setting out their full contents loss. Whilst some photographs have been provided of the contents, little information has been provided to substantiate the proof of ownership and value of all the items claimed. The contents were insured for just under $180,000. This presumably was nominated as setting out the value of all the contents stored. There is insufficient basis to confirm it was underinsured to the extent sought. The claim involved fairly extensive mould. It is not clear what additional loss, if any, was caused by the insurer’s poor claims handling. Given all this, the panel does not accept there is sufficient basis to award contents beyond the policy limit. This would include for contents lost in the move or left at the house. Complainants have not established their claim for increased living expenses The complainants ask the insurer to cover the increased living expenses while at the short- term accommodation. They say the short-term accommodation was not designed for stays over 3-4 days and had limited facilities, such as small fridges. The complainants say they spent over $11,000 on takeout meals and coffee between March and November 2020. The complainants also say they paid increased electricity costs. To this, the insurer says additional expenses are not covered under the policy terms and conditions. While the short-term accommodation may have its limits, the panel does not consider the insurer liable to cover the increased food bills as a result of the claim. The circumstances leading to the claim were not in the insurer’s control and the insurer’s policy does not cover such costs. Further, and in the alternative, there is insufficient information to compare the complainants ’ meal expenses whilst in alternative accommodation to their expenses prior to the claimed event. This similarly applies to the electricity. Therefore, the complainants have not established this loss. Insurer not liable to cover loss of electrical goods’ warranties The complainants say they lost the warranty on their white good appliances purchased since the insurer’s total loss payment (for contents). This is because the contents have been in their boxes and they have lost the warranties. This is not an established loss. There is no information to show this has occurred. If the products fail, this is arguably a claim against the manufacturer or retailer for providing defective goods. There is insufficient basis to make any award for this. Insurer should cover the costs to pack and move the contents Determination | Case number: 904507 Page 7 of 9 The complainants say the insurer agreed to cover the cost to move the contents from one short term rental to another on 9 November 2020. The insurer has not presented any evidenc e to challenge the complainants’ position. On page 48 of the PDS, the policy outlines the cover relating to temporary accommodation as below: Covered under Buildings Insurance ..  Costs to remove and store your contents and then return them to your home. The panel considers it fair the insurer covers the costs to pack and move the contents (if it has not already done so) from one short term rental to other as the policy covers such costs. Further, it is fair the insurer pays for the estimated costs to move the contents from the current rental place to the insured property (following repairs). The complainants have estimated this to be $5,000. There is nothing to show this is unreasonable. The insurer should pay this in settlement of this and for the interests in finality. Home insurance The complainants also sought reimbursement of premiums for $4,625. In an email dated 1 May 2023, the insurer agreed to a proportional refund for the contents given this was settled as a total loss. This is reasonable. For the home, the insurer did not agree to any refund as it was on risk for further damage. The panel agrees with this given the information does not show the home was a total loss. 2.3 Is non-financial loss compensation payable? Yes. The insurer’s claim handling caused unnecessary stress, inconvenie nce and delays to the complainant. It is required to pay $10,800 to the complainants in non-financial loss compensation. AFCA can award compensation for poor claim handling Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400) where the insurer’s actions have caused an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with the complainant’s expectation of enjoyment or peace of mind. Insurer should pay $10,800 as non-financial loss compensation The complainants say the insurer’s overall claim handling caused major stress, inconvenience and delays. The insurer acknowledged that it should have handled the claim better. Outside the policy terms and conditions, the insurer offered $5,400. Determination | Case number: 904507 Page 8 of 9 The panel considers it fair that both complainants individually receive the full maximum award. Multiple issues arose during the claim process which affected both the complainants significantly. This included the following :  the insurer has taken an unusual amount of time to assess its liability and offer a cash settlement  the insurer’s repair works has caused unnecessary delays and inconvenience to the complainants  the contemporaneous notes show the complainants had to contact the insurer on numerous occasions regarding the temporary accommodation and short-term rental – this included doing multiple, and numerous, moves. Therefore, the insurer should pay $10,800 in non-financial loss. Determination | Case number: 904507 Page 9 of 9 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.