A landlord's flood claim was cash settled by the insurer for $232,173.24 after it limited liability for pre-existing damage. AFCA found the pre-existing damage limitation fair but increased the settlement to $273,569.01 and awarded $2,000 for non-financial loss.

Engineering reports showed pre-existing damage the insurer need not cover, but the higher AJG quote with a 25% uplift was fair, and the insurer's slow assessor appointment warranted non-financial loss compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial loss

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 904006 Financial firm Allianz Australia General Insurance Limited Determination | Case number: 904006 Page 1 of 6 Case number: 904006 30 March 2023 1 Determination overview 1.1 Complaint The complainant held a Landlord's Insurance policy with the financial firm, (insurer) and lodged a claim on the policy on 11 March 2022 after the property had been inundated by flood waters. The insurer has accepted liability and offered to cash settle for $232,173.24. The complainant disputes the settlement figure and maintains the scope of works is not sufficient to complete the repairs to the premises. The complainant seeks a cash settlement of $368,433.99 plus GST, interest paid on her outstanding home loan and non-financial loss compensation given her claims experience. 1.2 Issues and key findings Is the insurer entitled to limit its settlement due to pre -existing damage? Yes. The panel is satisfied that most likely the property had pre-existing damage for which the insurer is not liable to repair. It is fair in the circumstances to cash settle the claim. The insurer should increase the cash settlement to $273,569.01 based on the quote from AJG, inclusive of a 25 per cent uplift to cover contingencies. Is the complainant entitled to compensation for non-financial loss? Yes. While the panel accepts some of the delays were outside of the insurer's control, the panel is satisfied the insurer was too slow in appointing an assessor in the first instance. This has contributed to delays in the assessment of the property and resolution of this complaint. In the circumstances, the panel considers an award of compensation for non-financial loss of $2,000 is fair. Why is the outcome fair? The outcome is fair as it is consistent with the available evidence and the policy terms. The panel accepts that the complainant's property suffered significant damage in the flood, however the relevant engineering reports indicate some of the damage identified is pre- existing. It is therefore reasonable that the insurer not be liable for this damage. 1.3 Determination This determination is partially in favour of the complainant. Within 14 days of the complainant's acceptance of this determination, the insurer must pay the complainant:  $273,569.01 in payment of the damage to the home  $2,000 as compensation for non-financial loss. Determination | Case number: 904006 Page 2 of 6 2 Reasons for determination 2.1 Is the insurer entitled to limit its liability for the damage claimed? Yes. Most likely the property had pre-existing damage for which the insurer is not liable to repair. It is fair in the circumstances to cash settle the claim. However, the insurer should increase the cash settlement to $273,569.01 based on the quote from AJG, inclusive of a 25 per cent uplift to cover contingencies Circumstances of loss The complainant holds a Landlord ’s Insurance policy covering the property for a building sum insured of $393,273 for a series of insured events including flood, subject to various policy terms and conditions. There is no dispute that the complainant's property was flooded during the extreme weather events of February 2022. The complainant's building, a raised level weatherboard property, was inundated to a level of approximately 1.55 meters above the upper floor leve l. The insurer ’ s building expert, (AJG) confirmed that every room in the premises was inundated with flood water up to approximately 1.5 metres for at least five days. A report provided by the complainant from (RH), a Queensland government organisation, suggests the inundation was to a level of approximately 1.7 metres above the upper floor level. There is no dispute that the property suffered significant flood damage because of the flood event. Property has signs of pre-existing damage The dispute arose after the insurer sought to limit its liability based on the initial damage assessments. The property was first assessed by AJG on 31 May 2022. AJG confirmed the house had flood damage with the majority of the damage due to the high volume of rain experienced during the flood event. AJG prepared a Scope of Works (SOW) and quote for the repairs totalling $218,855.21. The complainant did not accept the assessment believed the house should have been assessed as a total loss. The neighbouring property, which the complainant also owned had been assessed as a total loss and the complainant considered the damage to the insured property at least as severe. The panel notes the claim for the neighbouring property was settled for a sum insured of $262,158. The building was then assessed by (PIB) on 14 July 2022. PIB confirmed that the property had sustained flood damage and structural damage associated with the claimed event. PIB also observed pre-existing structural damages to floorboards and structural wall framing. PIB engaged consulting engineers, (BE), who reported on 26 August 2022 that the exposed timber frame revealed a wide variety of ad hoc details. Deterioration was noted such as rotten timber and pest damage, damage to the subfloor area and the support stumps. BE concluded the primary cause of damage to the dwelling was the long-term weathering of the timber framing/other elements, pest damage and ad hoc framing modifications/repairs along with Determination | Case number: 904006 Page 3 of 6 periodic flooding of the structure. The report does not provide any detailed consideration of the flood damage. The insurer obtained a further building and engineering report from (SWP) on 11 November 2022. SWP identified general deterioration and termite damage to the externally exposed timber, cracking to the concrete retaining wall within the subfloor and a leaning post in the external rear of the dwelling. SWP considered the damage consistent with long-term deterioration and wear and tear by general building movement, weathering and termite damage, and not related to the one-off flood event of February 2022. SWP also considered there was evidence of heavy wet rot/deteriorated timber framework internally, consistent with general age-related wear and tear and again, unrelated to the flood event. The panel acknowledges that SWP did not inspect the property until approximately eight months after the event. It is possible during this time that some ongoing damage could have occurred. The panel notes this would most likely be limited as the interior area of the property had been stripped, exposing all the relevant timber framing. Complainants reports inconclusive The complainant relies several inspection reports which indicate the property was in reasonable condition prior to the event. The inspection reports do not identify the damaged framing or damaged subfloor area. The complainant provided a repair quote from EP dated 27 November 2022 for $368,433.99 plus GST. A SOW was provided later, setting out the basis of the quote. The quote and SOW do not address the pre-existing damage. No other evidence has been provided by the complainant to dispute the engineering reports. While the complainant says the damage to the neighbouring property should be considered when assessing this complaint, the panel disagrees. The damage to the neighbouring property only serves to confirm the likely level of flood inundation and not the extent of damage. Insurer is to increase its offer The panel is persuaded by the engineering reports, in particular the report from SWP, that the property did have evidence of pre-existing damage unrelated to the flood event. In the absence of persuasive evidence from the complainant, it is fair for the insurer to rely on the reports it has obtained, to limit its liability. The insurer offered to settle the claim for $232,173.24 based on the SOW repaired by PIB and quote of $193,477 plus a 20 per cent contingency fee. This quote is dated 14 July 2022. AJG had earlier quoted $218,855.21 to complete the repairs, including GST. As indicated earlier, this quote was rejected by the complainant. The panel considers the AJG quote is comprehensive and represents a fair assessment of the damage. In the absence of any additional material, the panel considers it fair that the insurer applies the higher quote obtained from AJG on which to base a cash settlement. The panel considers an uplift of 25 per cent given the age of the quote, the increased costs of materials and labour over the 12-month period, plus the transfer of risk is fair. Accordingly, the panel determines that the insurer should increase its offer to $273,569.01 being the Determination | Case number: 904006 Page 4 of 6 quoted amount of $218,855.21 plus an uplift of 25% ($54,713.80) in settlement of the complainant's claim for loss and damage to the insured building. 2.2 Is the complainant entitled to compensation for non- financial loss? Yes. The panel accepts some of the delays were outside of the insurer's control due to the catastrophic nature of the floods which affected the State. However, the panel is satisfied the insurer was too slow in appointing an assessor in the first instance. This has contributed to delays in the assessment of the property and resolution of this complaint. In the circumstances, the panel considers an award of compensation for non-financial loss of $2,000 is fair. No reasonable basis to recover the indirect financial loss claimed Under AFCA Rule D.3.2, we can award up to $5,400 compensation for indirect financial loss. The insurance policy excludes cover for consequential (indirect) loss. In such cases, we will not make an award for indirect financial loss, unless the complainant suffers an additional loss because the insurer mishandled the claim. The complainant has sought additional loss of rent and says she has incurred increased interest payments on her mortgage due the delays caused by the insurers claims handling. There is no doubt that the damage to the property was considerable, as indicated in the Scope of Works and there would have been a lengthy drying out period before any repairs could be commenced The panel is not satisfied that the available information indicates that the insurer's claims handling, caused the complainant to suffer an uninsured period for loss of rent or caused the complainant to suffer indirect financial loss. The insurer paid the complainant the loss of rent component under the policy in full. The panel accepts that this is fair in the circumstances. Complainant can award compensation for non-financial loss Under the AFCA Rule D.3.3, we can award up to $5,400 compensation for non-financial loss if we find a complainant has suffered an unusual degree of stress, inconvenience, or interference with their reasonable expectations because of the insurer’s handling of the claim. We take a conservative approach to non-financial loss compensation. Complainant entitled to non-financial loss compensation The panel acknowledges that the initial delay in assessing the claim was caused by factors outside the insurer's control. The extreme weather event had led to unprecedented claim numbers, with the availability of materials and trades restricted. Nevertheless, the panel accepts the insurer was slow in appointing an assessor in the first instance to assess the extent of damage. AJG did not attend the property until 31 May 2022, two and a half months after the complainant had lodged the claim. When the complainant rejected AJG ’s assessment , it then took the insurer another six weeks to arrange a further assessment of the property, and until October 2022 to arrange a suitable building engineering report. Determination | Case number: 904006 Page 5 of 6 The panel considers the insurer's conduct has contributed to the delays and has resulted in the complainant experiencing an unusual degree of physical inconvenience or time taken to resolve the matter. The panel considers in these circumstances, compensation for non- financial loss of $2,000 is fair. 2.3 Why is the outcome fair? The available information indicates that the complainant's property while significantly damaged, had pre-existing damage for which the insurer is not responsible. It is fair in these circumstances to rely upon the expert opinions in reaching a balanced view on the extent of the insurer's liability under the claim. Given the well documented and public information as to the significant increase in building and the age of the available quotes it is fair to allow a 25% contingency uplift. No interest is payable in these circumstances. It is also fair as there were delays caused by an insurer's handling of the claim, that compensation for non-financial loss be paid. Determination | Case number: 904006 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive industry experience. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.