Home / Allianz Australia / Determination 903059

Determination 903059

Insurer partially declined storm claim for underground landslide damage and timber decking

FirmAllianz Australia
Decided2023-02-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant's storm claim was partly declined for underground landslide damage and decking. AFCA found the underground damage covered, required scope of works and rectification and reimbursement of $1,842.50 expert costs, but upheld the decking decline and refused non-financial loss.

The insurer bore the onus to prove the 72-hour landslide exclusion and failed; the retaining wall exclusion did not apply, while decking damage was wear and tear not shown to be storm-caused.

Issues

Subjects and remedies

home or building damagenatural disasterpay compensationrepair or rectify

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 903059 Financial firm Allianz Australia Insurance Limited Determination | Case number: 903059 Page 1 of 10 Case number: 903059 21 February 2023 1 Determination overview 1.1 Complaint The complainant holds a home insurance policy with the financial firm (insurer). He lodged a claim on 9 March 2022 for damage to the property which he says was due to a storm. The insurer has partially accepted the claim for internal damage to the rumpus room, bedroom and storage room. However, it has declined cover for the timber decking and the underground damage to the property which it says was not caused by an insured event or is excluded under the policy. The complainant disagrees with the insurer’s decision and seeks that all property damage be covered under the policy. 1.2 Issues and key findings Is the insurer entitled to decline the balance of the claim? No. I am satisfied, on balance, that the underground damage was caused by landslide and is covered under the policy. The insurer has not established, on balance, that the landslide occurred more than 72 hours after the storm. Accordingly, the insurer is not entitled to decline cover and it must also pay the cost of rectifying the underground damage. I am not satisfied that the timber decking damage has been caused by the storm. Accordingly, the insurer is entitled to decline cover for the decking. Is the complainant entitled to compensation? No. I am not satisfied that the insurer has unduly or unreasonably delayed the claims process or otherwise failed to handle the claim appropriately. The insurer is not required to pay compensation in this instance. Why is the outcome fair? I am satisfied the complainant has established a valid claim under the policy and that the insurer has not established the landslide exclusion applies. Accordingly, it is fair that the insurer also undertake or pay the costs of rectification for the underground damage. 1.3 Determination This determination is in favour of the complainant. If the complainant accepts this determination, within 14 days of being notified of its acceptance, the insurer must:  pay the complainant $1,842.50 for its professional costs;  obtain a scope of works from SP. SP should endeavour to reach agreement with W G regarding the scope of works. The rectification works for the internal damage and the underground damage should then be completed in a timely manner, noting in particular the instability of the structure. Determination | Case number: 903059 Page 2 of 10 2 Reasons for determination 2.1 Is the insurer entitled to decline the balance of the claim? No. I am satisfied, on balance, that the underground damage was caused by landslide and is covered under the policy. The insurer has not established, on balance, that the landslide occurred more than 72 hours after the storm. Accordingly, the insurer is not entitled to decline cover and it must also pay the cost of rectifying the underground damage. I am not satisfied that the timber decking damage has been caused by the storm. Accordingly, the insurer is entitled to decline cover for the decking. Onus on complainant to establish valid claim The initial onus is with the complainant to establish, on the balance of probabilities (that it is more likely than not), that the loss or damage claimed falls within the terms of the policy. This is known as a valid (or prima facie ) claim. Once the complainant has established a valid claim, the onus shifts to the insurer to establish, on balance, the application of a policy exclusion or that it is otherwise entitled to decline the claim under the policy. Policy covers insured events subject to exclusions The insurer’s policy consists of the policy schedule and product disclosure statement (PDS). It is not in dispute the insurer provided the policy documents to the complainant. The policy is an ‘insured events’ policy. This means not all loss and damage is automatically covered. Rather, only loss or damage caused by one or more of the insured events, and not subject to exclusions, is covered. The insured events are set out in the PDS and includes storm, rainwater and run-off (which is not combined with flood waters). It also covers loss or damage directly caused by or arising from soil movement, including erosion, landslide, mudslide and subsidence if it occurs within 72 hours of a storm. The PDS does, however, make it clear that cover for storm does not include loss or damage caused by storm surge or hydrostatic pressure, or to retaining walls. Further, building cover does not include cover for unpaved paths or driveways, including loose or compacted soil, gravel, pebbles, rocks or sand. The policy also contains general exclusions for damage which is caused by, amongst other things:  wear and tear;  inherent defects; and  soil movement (but does not include soil movement caused directly by and occurring within 72 hours of an insured event). Insurer provided reports commenting on the cause of damage The insurer appointed a loss adjuster, SLA, who inspected the property on 15 March 2022. SLA then engaged a builder, UBP, and an engineer, SP, to attend the property. UBP attended the property on 4 May 2022. It says: Determination | Case number: 903059 Page 3 of 10  the property is a split-level house and, due to the amount of rainwater, a landslide under the house has occurred;  the landslide hit a structural brick wall located in the rumpus room behind the access door in the lower level. There are two visible cracks on the brick wall. One is in the rumpus room area where the landslide hit the wall and appears to have previously been repaired. The other is on the opposite side of the rumpus room where no landslide occurred. In its opinion, this second crack is not related to the claimed event;  there are visible cracks on the ceiling and the timber door jamb that are related to movement, which could be related to the landslide;  water was pouring through the brick wall damaging skirtings and cabinetry; and  part of the rear decking area has sunk and some of the timber decking has popped up. In its opinion, the damage to the decking is an ongoing issue due to wear and tear and not related to the landslide. SP attended the property on 20 May 2022. It has provided a report which states:  the dwelling is situated on steeply sloping ground with predominantly clay soil;  the complainant advised that following a recent storm event there was water ingress within the rumpus room on the lower floor level. Further, ‘ a few days after the storm ’ , on several occasions, the soil in the subfloor space crumbled and rolled down the slope making impact with the rumpus room brick wall, causing cracking damage to several places around the building;  the excessive rain has resulted in excess water behind the brick wall and water stains in the rumpus room. This is as a result of a combination of excessive rain and the absence of a waterproofing membrane on either side of the brick wall;  water can also permeate into the rumpus room via the floor slab due to the absence of a waterproofing barrier as required for a habitable rumpus room constructed below ground and interfacing with subterranean soil and water;  in the subfloor below the first-floor level, beyond the bottom level footprint, it appears that blocks of clay have rolled down the slope to the brick wall at the rumpus room;  in its opinion, the clay crumbled due to water saturation in the soil following heavy rains. Clay is generally stable at steeper slope angles than sandy soils. However, in general, wet clays have lower strength than dry clay;  when clay soil starts to dry out progressively from the outer surface, a tension crack can develop a short span away from the slope edge. The combined effect of the tension crack, moisture in the clay soil and weight of the soil in front of the tension crack results in the formation of a slope failure plane, consistent with a landslide;  there are several places in the dwelling where separation between building finishes and the main structure has occurred. However, the cracking is superficial and does not compromise the structural integrity of the dwelling;  the cracks are not consistent with a storm event and collapse of the soil within the subfloor. In its opinion, the pattern of cracks throughout the dwelling is due to general building and thermal movement in between different materials due to thermal expansion/contraction; and  there is other minor damage to the dwelling that is unrelated to the storm event and due to general wear and tear. Accordingly, the insurer says:  as soil is not considered part of the building, and the exclusion for retaining walls, this part of the claim is not covered;  as the damage to the walls and timber decking are due to depreciation, gradual deterioration, wear and tear and soil movement not within 72 hours of a storm, this damage is also not covered under the policy; and Determination | Case number: 903059 Page 4 of 10  it will cover the internal damage that has resulted to the rumpus room. Complainant says damage caused by storm The complainant obtained an expert report from an engineering geologist, WG. It says:  the house was built in the early 1970s so the cut batter under the house had stood for approximately 50 years unsupported. However, due to the severe surface flows, subsurface flows, and general saturation of the slope as a result of the extreme rainfall event, the cut batter is now unstable;  locally, that rainfall event was the largest in living memory and contributed to the highest ever monthly rainfall recorded in the complainant’s suburb;  an engineered retaining wall should be installed. Alternatively, the failed material should be excavated and removed, and the remaining slope battered to a grade of not more than 30 degrees from horizontal with underpinning as necessary. Proximate cause of the damage must be established The complainant needs to show the proximate cause of the damage being claimed was, on balance, the storm event. The proximate cause of a loss is the dominant, effective or operative cause. It does not have to be the first, the last or the sole cause. This is a question of fact depending on the circumstances. If there are several causes, each needs to be examined for qualities of reality, predominance and efficiency to identify the proximate cause. For example, if one cause would have caused the loss in any case, and the other one would not have done so without the first, then the first is the proximate cause. Available information shows that underground damage is due to storm The insurer has accepted the claim for the internal damage to the property. Having reviewed all the available information, I am satisfied, on balance, that the structural damage to the dwelling and the external rumpus room wall damage (underground damage) is also covered under the policy. I am not satisfied, however, that the timber decking damage is covered. There is no dispute that a storm event caused damage to the property and the insurer has already partially accepted the claim for internal damage. The question is whether the underground damage was caused by the storm. When he lodged the claim, the complainant stated that water came down the hill and that he had never seen that before. Further, UBP’s report states that due to the amount of rainwater, a landslide under the house has occurred. SP’s report states the excessive rain has resulted in excess water behind the brick wall which is as a result of a combination of excessive rain and the absence of a waterproofing membrane on either side of the brick wall. Accordingly, I am satisfied that the underground damage has been caused by the storm event and, therefore, that the complainant has established a valid claim under the policy. The insurer has sought to rely on the landslide exclusion and the retaining wall exclusion within the storm event cover. The Macquar ie Dictionary defines a retaining wall as ‘a wall built to hold back a mass of earth’. I do not consider the external rumpus room wall to be a retaining wall since it was not built to and did not hold back earth against it. Therefore, the retaining wall exclusion will not apply. Determination | Case number: 903059 Page 5 of 10 The landslide exclusion will however apply if the landslide occurs more than 72 hours after the storm. There is no dispute that a landslide occurred, however the insurer says it did not occur within 72 hours of the storm. The onus is on the insurer to establish that the landslide exclusion applies. Based on the information available, I am not satisfied that the insurer has established this. I note that SLA did not attend the property until a week after the storm and UBP and SP did not attend the property until two months after the storm. Further, the insurer has not provided sufficient explanation or evidence as to why it says the landslide occurred more than 72 hours after the storm. The complainant also says there was debris and soil entering the house and subfloor from the day of the storm. Therefore, I am not satisfied, on balance, that the insurer has established that the landslide occurred more than 72 hours after the storm. Accordingly, the storm event cover will apply. SP has also referred to the lack of waterproofing on the external rumpus room wall. I am not satisfied, on balance, that this is the proximate case of the damage. I am satisfied, on balance, that the landslide is the proximate cause of the damage. Accordingly, there is no basis to exclude cover for the underground damage. In the relation to the timber decking, the complainant has not provided any evidence to establish that the proximate cause of the damage is the storm event. UBP says the rear decking area has sunk and some of the timber decking has popped up due to ongoing issues with wear and tear not related to the landslide. I am persuaded by the evidence and photographs provided by UBP. Therefore, I am satisfied that the timber decking damage is not covered under the policy. Insurer is liable for repairs to rectify underground damage WGs recommends that a retaining wall designed by a structural engineer be installed to stabilise and rectify the underground damage. It also recommends a large diameter dish drain or trench drain on the uphill side of the house to cut off surface from the slope above in the future. Alternatively, it says the soil could be removed from underneath the house to ensure an angle of not more than 30 degrees from horizontal and underpinned. SP says it does not recommend disturbing the slope further in trying to reshape it to achieve a flatter slope. It says this could result in a new failure plane developing and progressing toward the northern edge of the building. Rather, it recommends a compliant timber retaining wall fronting the collapsed section of embankment be constructed and that the gap be backfilled with compacted gravel. It also recommends a dish drain between the retaining wall and external rumpus room wall as well as waterproofing of the wall. It appears there is a significant degree of agreement between the complainant and insurer’s experts regarding rectification. Accordingly, I am satisfied that that the insurer should cover the repairs in accordance with the SP report and that a detailed scope of works should be obtained. SP should also consult with WG and endeavour to obtain its agreement to the scope of works required to be completed underground. In terms of the drain proposed on the uphill side of the house, I do not consider this is a rectification cost for the underground damage. The purpose of the drain is to steer water away from the house in the event of a future storm or landslide and to minimise any future damage to the house. Accordingly, if the complainant wishes to install it, the cost of the drain should be paid by the complainant not the insurer. Determination | Case number: 903059 Page 6 of 10 Complainant’s expert report costs should be reimbursed The complainant obtained expert reports from WG which he says cost him $1,842.50 inclusive of GST and which he has paid. Under Rule D.5, AFCA may decide if a financial firm contributes to the professional costs incurred by a complainant in the course of a complaint. These costs can be awarded if the complainant needed an expert to understand or establish their claim. These costs are normally capped at $5,000 unless exceptional circumstances apply. The reports obtained from WG assisted the complainant to establish their claim and particularly how the underground damage should be rectified. Therefore, I am satisfied that the insurer should reimburse the complainant’s professional costs. 2.2 Is the complainant entitled to compensation? No. I am not satisfied that the insurer has unduly or unreasonably delayed the claims process or otherwise failed to handle the claim appropriately. The insurer is not required to pay compensation in this instance. AFCA can award compensation for non-financial loss Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which causes:  an unusual degree of stress, delay, or inconvenience, and/or  interference with a person’s expectation of enjoyment and/or peace of mind. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. Insurer is not required to pay compensation to the complainant The complainant says that he is disappointed at the length of time the process has taken and the non-responsiveness of the insurer. The loss was reported to the insurer on 9 March 2022. I accept there was some delay in the insurer arranging for an assessor to inspect the property and in obtaining expert reports. However, the exchanged material shows the insurer responded to the claim on 22 June 2022. I acknowledge the event, the damage caused and the uncertainty over his home distressed the complainant. However, I am satisfied that the insurer overall has acted in a timely manner and in accordance with its obligations under the General Insurance Code of Practice. On balance, I am also satisfied the insurer handled the claim reasonably. Accordingly, the insurer is not required to pay compensation to the complainant. 2.3 Why is the outcome fair? I am satisfied the complainant has established a valid claim under the policy and that the insurer has not established the landslide exclusion applies. Accordingly, it is fair that the insurer also complete the rectification for the underground damage and pay the complainant’s professional costs. Determination | Case number: 903059 Page 7 of 10 Determination | Case number: 903059 Page 8 of 10 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 903059 Page 9 of 10 3.2 Key policy provisions Storm, cyclone, rainwater or run off What’s covered?  Loss or damage caused by:  storm…  rainwater  run-off (provided run-off is not combined with flood waters)  Loss or damage caused by or arising from:  soil movement, including erosion  landslide  mudslide  subsidence if it is caused directly by and occurs within 72 hours of a storm. What’s not covered?  Loss or damage caused by:  flood…  storm surge  hydrostatic pressure  rainwater, run-off, hail, wind or water that enters your buildings through an open door, window or other opening (excludes openings made by the storm or cyclone).  Loss or damage to: Determination | Case number: 903059 Page 10 of 10  …retaining walls… What’s a building (and what’s not) What’s not covered?  Unpaved paths or driveways, including loose or compacted soil, gravel, pebbles, rocks or sand General exclusions Always excluded Wear and tear Including depreciation, gradual deterioration, wear and tear or lack of maintenance. Inherent defects Including faulty design, structural defects or poor workmanship. Soil movement Including erosion, landslide, mudslide or subsidence unless it is directly caused by and occurs within 72 hours of an explosion, earthquake, tsunami, storm or flood (where your policy schedule shows you have optional cover for flood).

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.