Determination 902512

Flood damage claim not properly assessed and unreasonably delayed

FirmTerri Scheer Insurance Pty Ltd
Decided2023-03-01
ProductGeneral Insurance · Landlord
OutcomeFor the complainant
Amount awarded—
Non-financial loss$4,000
Amount claimed—
SourceAFCA PDF

Summary

The complainant lodged a flood damage claim on a rental property which the insurer accepted, but the damage was not fully assessed and repairs were unclear after many months. AFCA found the insurer had unnecessarily delayed the claim and failed to engage with AFCA, and ordered an independent engineer assessment, a settlement process, and $4,000 non-financial loss compensation.

The insurer failed to properly assess the remaining flood damage and unreasonably delayed the claim, causing unusual inconvenience and stress, so the claim must be reassessed and settled and non-financial loss compensation paid.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial lossreassess claim

Related

All Terri Scheer Insurance Pty Ltd determinations · Find similar determinations

Text of the determination

Determination Case number 902512 Financial firm Terri Scheer Insurance Pty Ltd Determination | Case number: 902512 Page 1 of 5 Case number: 902512 21 February 2023 1 Determination overview 1.1 Complaint The complainant holds an insurance policy to cover a rental property with the financial firm (insurer). On 7 March 2022 a claim was lodged following damage from a flood. The insurer accepted the claim. The insurer appointed an external assessor to manage the claim. The assessor appointed a builder and restoration company to quote and conduct make safe works. It is unclear how much work has been done and if any actual flood damage repairs have begun. The complainant says the lack of contact and progress from the insurer and its appointed assessors and trades are unacceptable. The complainant says the repair quotes submitted by the insurer’s builder do not include all areas of damage. 1.2 Issues and key findings Has the insurer accurately assessed the claim? No. Given the insurer’s lack of engagement during this complaint process and the complainant’s legitimate concerns, the panel is not persuaded the insurer’s current assessment status addresses the claim related damage. The complainant has provided no expert reports to indicate what additional work is required, only photographs of the additional damage that is not included in the available scope of work (SOW). Given the limited information, it is fair for the claim to progress in the manner set out in section 2.1. Has the insurer unnecessarily delayed the claim? Yes. The available information provided by the complainant shows several areas of concern that have not been addressed by the insurer, nearly 11 months into the life of the claim. The insurer has failed to engage with AFCA, which has contributed to the delays. It is fair for the insurer to pay the complainant $4,000 compensation for non-financial loss. 1.3 Determination This determination is in favour of the complainant. The insurer is required to follow the steps outlined in section 2.1 of this determination to properly assess the damage and repair or cash settle the cost of repairs to the complainant. The insurer is to also pay the complainant $4,000 in non-financial loss compensation. Determination | Case number: 902512 Page 2 of 5 2 Reasons for determination 2.1 Has the insurer accurately assessed the claim? Property damage not fully assessed The insurer provided no information to AFCA to confirm its current position regarding the extent of damage. The insurer has not responded to the areas of damage raised by the complainant in his correspondence of 6 December 2022. The complainant provided a quote from the insurer’s builder (JL) dated 15 November 2022 as well as two more recent quotes dated 3 February 2023. The quotes do not include all the provisions to repair the areas raised in the correspondence of 6 December 2022. However, the complainant has not provided any expert information to show the extent of damage he says is claim related. Neither is there any information to show the property should be declared a total loss, being the outcome he is seeking. In total, there is limited information to substantiate a fair remedy. Claim should be settled in this way The insurer is to appoint an engineer to assess the property within two weeks of this determination being accepted. The engineer is to provide a SOW that addresses all concerns raised by the complainant relating to the flood damage. The engineer must be independent and qualified to undertake this task. Within two weeks of receiving this SOW, the insurer must engage a builder to attend the property and provide a quote based on the engineer’s SOW. This quote can then be utilised for a cash settlement or for the builder to be appointed to conduct the repairs. The quote should also estimate the likely timeframe for repairs to be completed. The panel acknowledges the policy provides the insurer with the discretion as to how to settle the claim. However, given the substantive delays experienced and the significant impact this is having on the complainant, the panel considers it fair for the complainant to choose the method of settlement. This is subject to the cost of repairs not exceeding the policy limits. If the cost of repairs do exceed the policy limits, then the claim should be cash settled. If the complainant elects for the insurer to conduct the repairs, then:  the insurer must begin repairs as soon as practicable  cover the complainant for any loss of rent incurred whilst repairs are being conducted  ensure any other policy benefits (e.g. storage of contents) that are applicable are provided. If the complainant elects to be cash settled, he can also provide his own quote based on the engineer’s SOW. His contractor should also attempt to estimate the likely timeframe of repairs. If only one quote is obtained during this process that is based on the engineer’s SOW (i.e. the insurer’s quote), then the insurer is to cash settle the claim based on that quote plus a 20% contingency. If more than one actionable quote is obtained based on the engineer’s SOW, then the insurer is to cash settle the claim based on the average of those quotations with a 20% contingency. Determination | Case number: 902512 Page 3 of 5 The contingency is to address the likely variations such a complicated job would arise as well as the fact the risks of the works are passing to the complainant and the loss of any guarantee under the policy. The insurer must also include a loss of rent benefit in its cash settlement based on the likely timeframe of repairs. This timeframe should be based on the builder’s estimate of repairs (if there is more than one estimate, the average of the two) plus a 20% contingency. In addition, the insurer should include any other policy benefit that may be applicable (e.g. storage of contents). Any cash settlement is subject to the policy limits. If the parties are unable to agree on the quantum, the complainant can lodge a new complaint at AFCA for a decision on this point. 2.2 Has the insurer unnecessarily delayed the claim? Compensation is awarded conservatively Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial loss where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. We take a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Compensation is warranted given the circumstances The insurer has failed to engage in the AFCA process. AFCA sent a letter on 5 December 2022 seeking the insurer’s response within 7 days. This was followed up with an overdue request letter sent on 14 December 2022 and an adverse warning outcome letter on 4 January 2023. A phone call was also attempted on 16 January 2023, but the in surer’s case handler could not be reached. This was followed up with an email to the insurer’s main email address. The insurer has not responded to any of this or engaged with AFCA to date. Given the nature of the complainant’s raised issues, it is clear t he property still has damage that has not been assessed. The panel is satisfied that given the time elapsed since the claim was lodged and the type of damage that remains to be assessed, there are delays present in the claim that are caused by the insurer. Further, the panel accepts the insurer‘s unnecessary claim delays and refusal to participate in the AFCA process caused the complainant to experience an unusual degree or extent of inconvenience, stress and anxiety. This would not be minor or insignificant. Accordingly, the panel accepts it is fair for the insurer to pay the complainant $4,000 in non- financial loss compensation in line with the AFCA Rules. Determination | Case number: 902512 Page 4 of 5 Determination | Case number: 902512 Page 5 of 5 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.