Home / Allianz Australia / Determination 901894

Determination 901894

Defective repairs by insurer-appointed builder after shower leak claim; complainant sought cash settlement of full rectification cost

FirmAllianz Australia
Decided2023-10-12
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$22,312
Non-financial loss$3,000
Amount claimed$20,000
SourceAFCA PDF

Summary

The insurer's appointed builder carried out defective repairs after a shower leak claim, and the insurer offered only $1,613.30 to finish the work. AFCA found the repairs defective and ordered the insurer to pay rectification costs plus a 20% allowance, interest, inspector costs and $3,000 for non-financial loss.

The insurer authorised the repairer and under the General Insurance Code of Practice must guarantee the repairs, so it is liable for the cost of rectifying the defects.

Issues

Subjects and remedies

elderly or capacityhome or building damagethird party authoritypay claimpay compensationpay interestpay non financial lossrepair or rectify

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 901894 Financial firm Allianz Australia Insurance Limited Determination | Case number: 901894 Page 1 of 7 Case number: 901894 10 October 2023 1 Determination overview 1.1 Complaint The complainant held a home insurance policy with the financial firm (the insurer). He lodged a claim for damage caused by a leak from his upstairs shower. The insurer accepted the claim and appointed a builder to repair the damage. The complainant says the repairs are defective, and need to be completely redone. He wants the insurer to settle the claim by paying the entire cost of repairs, about $20,000. The insurer does not accept the repairs are defective. It says the repairs are mostly complete, and has offered to settle the claim by paying $1,613.30 for the remaining repairs. 1.2 Issues and key findings Are the repairs defective? The repairs are defective, because the builder:  replaced only some of the damaged flooring in the bathroom  replaced none of the damaged flooring just outside the bathroom  installed flooring that is different to the original flooring, leaving the floor uneven  used thin particleboard for flooring, in violation of the relevant Australian Standard  installed a vanity next to a swinging shower door, which cannot fully open because it is blocked by the vanity. How should the claim be settled? The insurer should pay the cost of rectifying the defective repairs. The insurer should also pay $3,000 compensation for non-financial loss (stress, inconvenience, and delay). Why is the outcome fair? The repairs authorised by the insurer were defective. It is fair for the insurer to pay the cost of rectifying the repairs. It is also fair for the insurer to pay compensation for the stress and inconvenience it caused by mishandling the claim. 1.3 Determination This determination is in favour of the complainant. The insurer must pay the complainant:  $22,312.15 for the cost of rectifying defective repairs  the cost of replacing the damaged flooring outside the bathroom (based on a fair and reasonable assessment by the insurer)  20% of the above amounts for contingencies  interest on the above amounts, at the rate determined under section 57 of the Insurance Contracts Act 1984 (Cth), from 4 May 2022 to the date of payment  $770 for the cost of the report by the complainant’s building inspector  $3,000 compensation for non-financial loss. Determination | Case number: 901894 Page 2 of 7 2 Reasons for determination 2.1 Are the repairs defective? The repairs are defective, because the builder:  replaced only some of the damaged flooring in the bathroom  replaced none of the damaged flooring just outside the bathroom  installed flooring that is different to the original flooring, leaving the floor uneven  used thin particleboard for flooring, in violation of the relevant Australian Standard  installed a vanity next to a swinging shower door, which cannot fully open because it is blocked by the vanity. Insurer appointed builder to repair damage The policy covers building damage caused by some kinds of leaks. The policy says that if the insurer accepts a claim for building damage, it will pay the cost of repairing the damaged part of the building ‘to the same condition as when it was new’. On 25 October 2021, the complainant lodged a claim for damage caused by a leak from his upstairs shower. The insurer accepted the claim and appointed a builder to repair the damage. The builder carried out repairs between December 2021 and May 2022. The complainant says the builder’s work was defective. He says rectifying the defects will req uire undoing all of the builder’s work and starting the repairs from scratch. He asked the insurer to settle the claim by paying him the entire cost of repairs, about $20,000. The insurer says the repairs are mostly complete, and its builder has quoted the cost of the remaining repairs at $1,344.42. It has offered to settle the claim by paying this amount, plus a 20% contingency, a total of $1,613.30. Some work authorised but not completed In or about March 2022, the builder said the following work was necessary to repair the damage:  install 8m 2 of new yellow tongue flooring  install mortar base underlay for floor tiles  install 3m of new timber wall framing. The complainant agreed this work was necessary. The insurer authorised the builder to complete the work. The complainant says the builder claimed to have done the work, but after he complained, the builder admitted it had not done the work, and claimed the work was unnecessary. The insurer’s internal assessor sent the complainant an email between May 2 022 and November 2022 (the copy of the email provided by the insurer is undated). The email said: You have raised concerns with works that have not been carried out as per the scope of works supplied. [The builder has] responded advising that the issues raised regarding the timber frame and flooring did not need replacing as originally thought… Determination | Case number: 901894 Page 3 of 7 I asked the insurer when the builder advised the work was not required. The insurer did not answer this question. On 4 July 2022, the complainant emailed the builder and asked why it said it would replace the bathroom floor, and why it decided not to. On 5 July 2022, the builder replied with a photograph showing severe damage to the flooring and wall framing, and said they were rotten and ‘compromised’. This explains why the builder originally thought the work was necessary. The builder did not say why it changed its mind and decided the work was not necessary. The available information indicates the work quoted by the builder, but not completed, was necessary to repair the damage, and should have been completed. Complainant obtained report saying repairs were defective The complainant appointed a building inspector, who inspected the home on 13 September 2023. The building inspector produced a report saying the builder’s work was defective. The insurer’s builder responded to the report. Having read the building inspector’s report and the builder’s response, I believe the builder’s work was defective. The reasons for this are set out below. Damaged flooring in bathroom not replaced The inspector said the builder should have replaced the bathroom floor, but only replaced part of it. The remaining flooring was extensively water-damaged and mouldy. The builder says only some of the bathroom flooring needed to be replaced. It says the rest of the flooring is stained, but ‘ not structurally compromised to the point it needs replacement ’. The builder and the inspector both said the bathroom flooring was damaged. The builder left damaged flooring in place. The builder did not repair the bathroom to the same condition as when it was new. Damaged flooring outside bathroom not replaced The inspector lifted the carpet outside the bathroom and took photos showing water staining on the underlying plywood. The inspector said the plywood was bulged and fraying, and took photos confirming this. The builder says it did not quote for the replacement of flooring outside the bathroom. It does not dispute that this flooring was damaged by the leak, and should have been replaced. Bathroom floor not level The inspector said the original bathroom flooring had a cement screed over plywood. The builder replaced part of this flooring with cement sheeting over particleboard. Because of this, the bathroom floor is now out of level The builder says the inspector’s report shows the floor is only out of level by 0.07mm. One of the inspector’s photos shows a digital level on the bathroom floor recording a level variation of 0.07mm over 1m. However, another of the inspec tor’s photos shows the level on another part of the floor recording a level variation of 15mm over 1m. The inspector said the floor would be level if the builder used a cement screed like the original bathroom flooring. The insurer and builder have not provided any information to refute this. Determination | Case number: 901894 Page 4 of 7 Replaced flooring does not comply with Australian Standard The inspector said the original bathroom flooring had 15mm plywood. The builder replaced some of this with 19mm particleboard reduced to 15mm. This compromised the structural integrity of the flooring. The relevant Australian Standard says particleboard flooring must not be thinner than 19mm. The builder does not dispute that the flooring it installed did not comply with the relevant Australian Standard. The bui lder says the flooring was ‘[believed] to be within tolerances at the time ’. Shower door does not fully open The inspector said the small vanity was replaced with a larger vanity, and the sliding shower door was replaced with a swinging shower door. The inspector took photographs showing the vanity is now blocking the shower door, and the shower door cannot fully open. The builder says the new vanity and the new shower door were selected by the complainant. Even if this is true, the builder should have realised there was not enough space to install both, and advised the complainant to change his selection. Builder’s work was defective The inspector criticised other aspects of the builder’s work. It is not necessary to discuss these. The information discusse d above is enough to establish the builder’s repairs were defective. 2.2 How should the claim be settled? The insurer should pay the cost of rectifying the defective repairs. The insurer should also pay $3,000 compensation for non-financial loss (stress, inconvenience, and delay). Insurer liable for rectification The General Insurance Code of Practice (to which the insurer subscribes) says that if an insurer ‘selected and directly authorised a repairer’, it must guarantee the quality of the repairs. There is no dispute that the insurer authorised the repairs by its builder. The insurer must guaranteed those repairs. As the repairs are defective, the insurer is liable for the cost of rectification. Rectification means restarting repairs Rectification of the defective repairs will involve replacing the entire bathroom floor, and some flooring outside the bathroom. In a letter dated 25 July 2023, the insurer admitted that if the bathroom floor needed to be replaced, all of its builder’s work would have to be un done. This means the cost of rectification is the cost of starting the repairs from scratch. Best estimate of cost of repairs is $22,312.15 In or about November 2021, the insurer’s builder produced a scope of works and quote for repairs totalling $12,926.95. Determination | Case number: 901894 Page 5 of 7 In or about March 2022, the builder said they discovered additional damage, and produced a scope of works and quote to repair the additional damage totalling $9,385.20. This included the work on the flooring and wall framing which was never done (but should have been). The amounts quoted by the insurer’s builder total $22,312.15. This is the only available estimate of the cost of repairs. The complainant has not provided a quote for repairs. The complainant’s representative said they were in the building industry, and they believed the amounts quoted by the insurer’s builder were reasonable. Insurer must pay allowance for transfer of risk When an insurer settles a claim by repairing damage, it guarantees the quality of the repairs. If the repairs are unsuccessful, or cause additional damage, the insurer is responsible for the cost of rectification. When the insurer settles a claim by paying the cost of repairs, it transfers this risk to the customer. Furthermore, the customer may find it more difficult and expensive to arrange repairs, because they do not have the insurer’s industry knowledge and bargaining power. AFCA considers that if an insurer cash settles a claim, it should consider paying an allowance for the transfer of risk. Generally, AFCA considers that a reasonable allowance is likely to be between 5% and 25% of the quoted cost of repairs. The bathroom incurred significant water damage. Some of the water-damaged material is mouldy, and has been left in place for about two years. This could complicate repairs and increase costs. In the circumstances, I consider 20% to be a reasonable allowance for the transfer of risk. The insurer must pay $22,312.15 for repairs, plus 20% ($4,462.43) for the transfer of risk. Insurer must pay cost of replacing flooring outside bathroom The insurer’s builder’s quotes do not include the cost of replacing the damaged flooring outside the bathroom. There are no available estimates of the cost of this work. The insurer must assess the cost of replacing the damaged flooring outside the bathroom. The insurer may do this by obtaining a quote for the work, or by considering a quote provided by the complainant. The insurer must be fair and reasonable when making its assessment. After assessing the cost of replacing the damaged flooring outside the bathroom, the insurer must pay this amount to the complainant, plus 20% for the transfer of risk. Insurer must pay interest Section 57 of the Insurance Contracts Act 1984 (Cth) says an insurer must pay interest on a claim settlement payment from the time it was unreasonable to have withheld payment. From January 2022 to April 2022, the complainant complained about the repairs. On or about 4 May 2022, the insurer’s building supervisor met the complainant and the builder at t he complainant’s home to discuss the complainant’s concerns about the repairs. From 4 May 2022, the insurer should have realised the repairs were defective. After this, it was unreasonable for the insurer to refuse to rectify the repairs or pay the cost of rectification. It is fair in the circumstances for the insurer to pay interest on the cost of rectification from 4 May 2022. Determination | Case number: 901894 Page 6 of 7 Insurer must pay for complainant’s building inspector Under the AFCA Rules, we can require an insurer to contribute to legal costs, other professional costs, or travel costs a complainant incurred in making a complaint. In considering whether an insurer should contribute to a complainant’s costs, we consider whether they were reasonably incurred, and whether they helped resolve the complaint. The complainant appointed a building inspector, who produced a report outlining the defects in the insurer’s builder’s work. Appointing the building inspector was reasonable, and their report helped me write this determination. The building inspector charged the complainant $770 for their inspection and report. The insurer must reimburse the complainant for this expense. Insurer must pay $3,000 compensation for non-financial loss Under the AFCA Rules, we can award up to $5,400 compensation for non-financial loss if a complainant suffered an unusual degree of stress, inconvenience, or delay because an insurer mishandled a claim. We will only award this type of compensation if there has been an unusual degree of stress, inconvenience, or delay. We will not award compensation for the usual amount of inconvenience involved in making a claim. We will not award compensation for delays caused by a complainant, or other factors outside the insurer’s control. The complainant says the repairs were delayed. He told the insurer he was ’ extremely agitated and upset ’ about the repairs, and ‘ not sleeping at night ’. He says he could not use the upstairs toilet for months, and had to use a bucket instead. There was another toilet in the home, but the complainant is elderly, and could not always make it to the other toilet in time. The insurer admitted there were some delays in repairs, and apologised for the complainant’s experience. The complainant made numerous complaints about the quality of the repairs, but the insurer does not appear to have thoroughly investigated them. If it had, it would have realised the repairs were defective. The builder said it would replace water-damaged flooring and wall framing, but did not do so. When the insurer was advised of this, it did not press the builder to explain why it decided not to do the work, or provide evidence showing it was not necessary. The initial delay in repairs caused stress and inconvenience. The insurer caused further stress and inconvenience by refusing to rectify the repairs after it should have known they were defective. This went beyond the usual amount of inconvenience involved in making a claim. The insurer must pay the complainant $3,000 compensation for non-financial loss. 2.3 Why is the outcome fair? The repairs authorised by the insurer were defective. It is fair for the insurer to pay the cost of rectifying the repairs. It is also fair for the insurer to pay compensation for the stress and inconvenience it caused by mishandling the claim. Determination | Case number: 901894 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. Complainant represented by family member or friend The complainant was represented by a family member or friend. In this determination, statements by the complainant’s representative are treated as if they were made by the complainant.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.