Storm/flood water inundation claim: extent of insurer's liability for repairs and temporary accommodation, and claims handling
Text of the determination
Determination
Case number 901249
Financial firm AAI Limited
Determination | Case number: 901249 Page 2 of 9
Case number: 901249 7 July 2023
1 Determination overview
1.1 Complaint
The complainants held a home insurance policy with the financial firm (insurer). They lodged
a claim on 28 February 2022 after their newly purchased property experienced water
inundation following a storm.
The complainants say during the storm, the entire lower floor was flooded. This resulted in
extensive water and mould related damage. The complainant stripped the lower floor due to
concerns with mould and water damage. This included stripping all the walls and ceilings.
They are claiming for the reinstatement of the lower floor, upper floor timber flooring,
temporary accommodation as well as other expenses.
The insurer says the complainants’ costs are unreasonable and accepts just $4,610.76 in
damages. It initially offered a higher sum. However, it later retracted this as it included
upstairs timber flooring which it says was not damaged by the storm.
The complainants seek their full claim as well as compensation for non-financial loss due to
the insurer’s claims handling.
1.2 Issues and key findings
What is the e xtent of the insurer’s liability?
The available information is insufficient in determining a fair amount for the repair costs. This
is because neither party has provided a scope of works that is substantiated or reasonable.
Therefore, this issue should be settled in the manner set out in section 2.1.
The insurer should contribute to the complainants’ temporary accommodation costs as well
as the costs towards the skip bins and asbestos testing.
Are the complainants entitled to compensation for non-financial loss?
Yes. The insurer’s claims handling has caused an unusual degree of stress and
inconvenience. Compensation of $3,000 for non-financial loss is fair in all the circumstances.
1.3 Determination
This determination is partially in favour of the complainants.
The insurer should settle the claim in the manner set out in section 2.1.
The insurer should pay the complainants $3,000 in non-financial loss.
Determination | Case number: 901249 Page 3 of 9
2 Reasons for determination
2.1 What is the extent of the insurer’s liability?
Policy provides cover for insured events subject to exclusions
It is accepted insurance law that an insured has the initial onus to prove on the balance of
probabilities (that is more likely than not) that the loss or damage claimed falls within the
terms of the policy.
The complainants hold a home building insurance policy which covers insured events,
including damage caused by storm. The policy defines storm to mean a single weather event
being, a cyclone or severe atmospheric disturbance. It can be accompanied by strong winds,
rain, lightning, hail, snow or dust.
Relative to the claim, the insurer has relied upon the following conditions.
“ We do not cover:
Extra costs or other losses following an incident covered by your policy extra
costs or other losses (financial and non-financial loss) following an incident
covered by your policy, including but not limited to:
• loss of income or wages;
• medical expenses;
• costs, including the cost of your time, to prove your loss or to help us with your
claim (e.g. phone calls, postage) unless stated otherwise in your policy;
• cost of hiring appliances after yours suffer loss or damage;
• professional, expert, legal, c onsulting or valuation costs unless you obtained our
prior authority to incur these costs;
• cost of replacing or reapplying pest control chemicals and baits in or around the
insured address;
• travel costs;
• cleaning costs unless stated otherwise in y our policy;
• any increase in electricity costs not directly arising from an incident covered by
your policy.”
The onus is therefore on the complainants to establish that the proximate cause (that is the
dominant or effective cause) of the damage being claimed was the storm.
Determination | Case number: 901249 Page 4 of 9
Circumstances of the claim
On 28 February 2022, the complainants lodged a claim after their newly purchased property’s
lower floor was inundated during the well documented heavy rainfall at this time. The previous
owner was still occupying the property at this time and provided the following statement about
the event:
We had very heavy rainfall on Friday, and drainage was coping well. On Saturday
the 26 th about 9am there was a very heavy storm cell which caused a flash flood
to the rear of the house and water came in through the rear door and under the
garage door. We had sandbags around the rear door and garage door but the
water had seeped through. We swept out the water, but three further storm cells
come over during Saturday afternoon.
The flooding extended from the garage and rear door through all downstairs
rooms. There is water damage to 4 bookcases, the carpets and base of the
kitchen units. We had multiple packing boxes filled and ready for removal which
were water damaged with damage to contents.
The insurer appointed an internal assessor (GB) and builder (JL) to report on the damage to
the property. Both attended around 22 March 2022.
JL formed the view the resulting damage to the property was caused by maintenance issues
to the roof and insufficient drainage allowed water to enter the lower floor. JL noted the
property had been cleaned and this made it difficult to report on the damage. JL did note a
slight smell of dampness approximately one month after the event.
JL noted swelling to the ground floor carpentry and specified this was not only to the
kickboard, but to all sections of the kitchen cabinetry. The first-floor timber flooring was
reported to be buckled.
GB reiterated JL’s report. He noted there was no tide line mark and says he was provided
advice that water of 30- 50mm ran through the property’s lower floor. GB was aware the
complainants were set to move in on 26 March 2022, however no consideration was made for
temporary accommodation. GB made the recommendation for a hygienist to attend the site.
However, this never happened.
Reviewing the file notes, it shows the claim was referred internally by the insurer to its
investigations team on 25 March 2022 and later released on 31 March 2022 with no action
taken. The file notes show the complainants contacted the insurer on multiple occasions
requesting updates and noting their dissatisfaction with the insurer’s lack of response and
lack of consideration for temporary accommodation.
The insurer did not arrange a hygienist as advised, nor did it consider accommodation for the
complainants. This is despite the insurer being made aware that the female complainant was
pregnant and there were concerns with mould and asbestos at the property. The scope of
works and report from (JL) was not provided to the complainant until July 2022 approximately
five months after the claim was lodged.
JL’s initial scope of works from 31 May 2022 was for the sum of $10,103.94. This was later
adjusted to remove the upper floor repairs of $4,610.76. This was mainly limited to some
damage to the kitchen, laundry and patio.
Determination | Case number: 901249 Page 5 of 9
The complainant provided a desktop report from an architect, DR, on 20 July 2022. DR
confirmed the following were damaged by the event:
1. Kitchen (entire)
2. Wall coverings (entire)
3. Doors (all)
4. Carpets (all)
5. Tiled area(s) (all)
6. Ceilings
7. Hot water service
8. Laundry
9. Bathroom
10. Wardrobe 1
11. Cupboard 1
12. Cupboard 2
DR analysed moisture readings and reported extensive mould was prevalent to the lower
floor, effecting the ceilings and asbestos wall sheets which the complainants arranged reports
on. DR also noted the substrate timber panel ceiling had delaminated.
The complainants provided a spreadsheet of the costs they are seeking, which includes:
Accom m odat ion from 18/03/2022 to 04/06/2022: $82.90/day at 78
days $6,446.20
Removalist cost $675.00
A s bestos testing $682.00
Asbestos removal $4,250
Skip bins $1,050
Repl e nishment of termite barrier $1,000
Repair of flooring (upper level) $3,040.00
Flooring and tile removal (lower level) $1,278.00
Hot water service replacement $3,828.79
Water/sewerage service charge $211.14
Temporary wall installation $500.00
Costs to date total $22,961.13
The complainants also provided a quotation for the outstanding repairs totalling $159,500
although they noted this is outdated.
Neither party has substantiated their scope of works
The panel accepts the property was inundated up to 50mm. This information has been
confirmed by the previous owners with photos and a statement in support. Part of the damage
claimed is consistent with this and the insurer’s reports.
Determination | Case number: 901249 Page 6 of 9
The insurer’s offer is inadequate. It makes no allowance for carpets, flooring or doors (beyond
the kitchen). It seems unlikely these areas were not damaged from water inundation. Even if
the carpets were dry when the experts attended, it does not remove the possibility there was
mould underneath. In particular, the panel notes the insurer undertook no testing of this
despite the concerns raised. It also seems unlikely the damage was only limited to the
kitchen, patio and laundry given the evidence is that water extended to all rooms.
However, the panel has concerns with the complainants’ position. For instance, the
information is unclear how the ceilings were affected by water inundation. There is no
evidence that water entered the property through the roof. It is unclear how water inundation
of about 50mm, which was apparently cleaned by the previous owners, could affect the
ceilings so extensively. The parties also accept there were previous issues with the ceiling,
although they dispute the extent of this.
Therefore, the panel is not persuaded the ceilings were damaged by the claimed event.
DR’s evidence is also not persuasive. It does not appe ar DR inspected the property.
Therefore, it is unclear how DR was able to fairly assess such extensive damages. There are
also aspects of DR ’s reports which is not compelling. For instance , DR included the ceiling
with no clear explanation as to how this could be affected by water inundation up to 50mm.
DR also make various assertions which are not clear, including:
the hot water service (HWS) had signs of rust which DR said was not evident prior to the
claimed event – it is unclear what information DR rel ied upon to determine the HWS’s pre -
existing condition
all wall linings being damaged – it is not clear how 50mm of water would affect all walls,
especially in areas where there are skirtings which are likely higher than 50mm
Given this, the panel is not p ersuaded the complainants’ scope of works and quotes are
substantiated or fair.
Claim for building repairs should be settled in this way
Given the issues with the quotes and scope of works, the panel does not accept there is
sufficient basis to determine a fair quantum for the repair costs. Therefore, the panel
proposes the claim for building repairs be settled in this way.
The parties are to engage an expert, such as a building consultant or independent structural
engineer, to provide an opinion as to the scope of works for the likely repairs needed
following the property being inundated by 50mm of water. In forming this view, the expert
should be given access to the property, reports and photographs.
The expert is not required to include the HWS or the ceilings as the panel does not accept
they were likely affected by the storm.
The expert should be one agreed to by the parties and who has not been involved on the
claim before. This is to be done by the insurer providing a list of three experts and the
complainants can choose one from the list. The expert should be appropriately licenced and
qualified to do this.
The expert’s costs are to be borne by the insurer.
Once this expert has been engaged and has completed the scope of works, each party can
obtain at least one, and no more than two, quotes based on that scope of works from a party
that has not previously been used to provide a quote from either party. Those must be
actionable quotes.
Determination | Case number: 901249 Page 7 of 9
If only one quote is obtained, then the insurer is to cash settle the claim based on that quote
plus a 15% contingency. If more than one quote is obtained, then the insurer is to cash settle
the claim based on the average of those quotations with a 15% contingency.
The contingency is to address the fact the risks of the works are passing to the complainants
and the likely possibility that there may be variations required during the works.
The panel considers a cash settlement is appropriate given the complainants have already
commenced works which includes areas the panel does not accept is covered (e.g. the
ceilings).
No interest is payable on the final sum payable given the claim should be settled on current
rates.
If the complainants received any contribution from the previous owners towards the claim
related costs, then this can be deducted from the final settlement.
Insurer to contribute $8,178.20 plus interest towards complainant’s costs
The complainants have incurred various costs as set out above. On those points, the panel
notes the following.
The insurer’s expe rt refused temporary accommodation as the complainants were not living in
the property at the time. It is not clear where in the policy this is supported, particularly in
circumstances when there is no dispute the complainants intended to live in the property at
some point.
The policy covers reasonable and necessary temporary accommodation costs. Given the
potential mould and asbestos, and the female complainant being pregnant, the panel accepts
temporary accommodation costs were necessary. Further, the complainants have provided
invoices in support of the additional rent paid whilst waiting for the insured property to be
habitable. There is nothing to indicate these costs were unreasonable.
The period being claimed is from 18 March until 4 June 2022. Given this included the period
where the insurer had yet to complete the assessment, the panel accepts these costs are
reasonable and should be allowed.
It is unclear how the removalist cost is payable. There is no information to indicate the
complainant had furniture in the insured property to remove. If this cost is to remove furniture
from their temporary accommodation to the insured property, this is not payable. This is
because such a cost would have been incurred regardless of the claimed event.
The cost for asbestos testing is reasonable given there is potential for wall linings to be
removed in the scope of works.
The costs regarding asbestos removal, flooring and tile removal and temporary wall are not
payable. This is because if such works were necessary to repair the claim related damage,
they should form part of the cash settlement process described above.
The skip bins should be allowed given this was likely necessary for some make safe works.
The replenishment of the termite barrier is specifically excluded under the policy. The panel
does not accept the available information shows either the HWS or the upper flooring was
damaged by the event. These costs are also excluded.
Determination | Case number: 901249 Page 8 of 9
It is unclear how water and service charges are costs caused by the claim as opposed to
ordinary household expenses. Even if they are losses, they are likely consequential and
excluded under the policy.
Therefore, of the costs incurred by the complainant, the panel accepts the insurer should
contribute $8,178.20. The insurer should also pay interest on this sum pursuant to section 57
of the Insurance Contracts Act 1984. Interest is payable from when the costs were incurred
until payment is made by the insurer.
2.2 Are the complainants entitled to compensation?
AFCA can award compensation in certain circumstances
AFCA’s Rules enable it to award compensation of up to $5,400 to a complainant for non -
financial loss where, because of the unreasonable claims handling, there has been:
an unusual amount of physical inconvenience;
time taken to resolve a situation; or
interference with the complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to compensation for non-financial loss and expects a
complainant to be moderately robust and bear the usual degree of inconvenience when
managing an insurance claim.
Complainant seeks compensation for claims handling experience
The complainants are dissatisfied with their claims experience. They have highlighted the fact
it was stressful, the insurer was difficult to contact, the insurer incorrectly referred the claim to
investigations, the insurer failed to arrange a hygienist or have consideration for their
circumstances.
The available information shows the complainants had difficulty communicating with the
insurer. As outlined in the decision, the insurer failed to fairly assess the claim and did not
arrange a hygienist or any assistance to inspect the asbestos, which was of concern to the
complainants.
However, the panel notes that part of the delays and issues were caused by the dispute itself
where the complainant’s position was not fully substantiated.
Given this, and noting AFCA’s conservative approach, the panel considers it fair the insurer
pays compensation for non-financial loss of $3,000.
Determination | Case number: 901249 Page 9 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim