Denial of claim for further water damage and roof repairs after hailstorm; delay in claim decision

FirmCapricorn Mutual Limited
Decided2023-03-21
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$750
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for further water damage to his rental property, attributing it to inadequate roof repairs after a 2019 hailstorm. AFCA upheld the denial as the damage came from excluded building defects, but awarded $750 for the ten-month delay in deciding the claim.

The complainant did not prove on the balance of probabilities that the damage resulted from the hail or inadequate repairs, and the engineer's report showed excluded defects, but the unexplained ten-month delay warranted non-financial loss compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial loss

Related

All Capricorn Mutual Limited determinations · Find similar determinations

Text of the determination

Determination Case number 901163 Financial firm Capricorn Mutual Limited Determination | Case number: 901163 Page 2 of 7 Case number: 901163 20 February 2023 1 Determination overview 1.1 Complaint The complainant is a member of the financial firm, which is a discretionary mutual organisation (the mutual). Members have the right to request indemnity in respect of a loss caused by a ‘protected event’ listed in the mutual’s product disclosure statement (PDS) . The complainant lodged a claim with the mutual after his rental property sustained damage in a hailstorm on 3 April 2019. The mutual attended to repairs, including to the property’s roof. As the complainant was dissatisfied with the quality of the repairs, rectification work was undertaken in 2020. On 22 June 2021, the complainant notified the mutual that there were signs of further water damage within the property. He attributes this to the mutual ’ s ineffective repair of the roof following the 2019 hail damage. He wants the mutual to pay the cost of further repairs, including proper roof rectification, and is dissatisfied with the mutual’s claim handling. The mutual denies it is liable. It says the damage claimed is not due to the hailstorm or ineffective repairs. Instead, the damage has been caused by building defects and poor workmanship at the time of construction, so is excluded under the terms of the PDS. 1.2 Issues and key findings Is the mutual required to cover the further repairs? No. The complainant has not proven that the damage claimed is due to the hailstorm or any repair inadequacy. On balance, the damage is the result of excluded factors. Is non-financial loss compensation payable? Yes. The mutual took ten months to deliver its claim decision concerning the further water damage. No explanation has been provided for the delay. I am satisfied that delay was unreasonable and caused the complainant stress and inconvenience. The mutual is to pay the complainant $750 in non-financial loss compensation. Why is the outcome fair? The complainant has not proven the damage claimed is due to a listed protected event or ineffective repairs by the mutual. Instead, the damage is from excluded causes. It would therefore not be fair to require the mutual to attend to further repairs. However, it is fair that the mutual pays the complainant $750 in compensation for the stress its delays caused. 1.3 Determination This determination is substantially in favour of the mutual. Within 21 days of the complainant accepting this determination, the mutual must pay him $750 in non-financial loss compensation. The mutual is not required to take any other steps. Determination | Case number: 901163 Page 3 of 7 2 Reasons for determination 2.1 Is the mutual required to cover the further repairs? No. The complainant has not proven that the damage claimed is due to the hail storm or any repair inadequacy. On balance, the damage is the result of excluded factors. Complainant must show damage due to a protected event or mutual ’s repairs The complainant is required to show, on the balance of probabilities (that it is more likely than not), that he suffered a claimable loss under the PDS. This means he must show the loss was caused by a risk against which the mutual provides protection. The schedule of protection the mutual issued to the complainant confirms he took out home building and home contents protection. Subject to its terms and conditions, the PDS covers the complainant’s property for damage caused by a listed pro tected event. One of those events is ‘storm, wind, rain, hail or snow’ . Once the complainant proves the existence of a claimable loss, the mutual may in its discretion agree to cover the loss. In exercising its discretion, the mutual must act reasonably. Further, the mutual may be entitled to rely an exclusion or limiting condition set out in the PDS. The mutual has the onus of proving on the balance of probabilities the application of the exclusion or condition. If the mutual has authorised repairs and those repairs are insufficient to rectify the damage the mutual has agreed to cover, the mutual is required to undertake further repairs. The party alleging repair inadequacy bears the onus of proof. Complainant says mutual should pay for further repairs It i s not in dispute that the hailstorm caused damage to the property’s roof or that the mutual appointed trades to attend to repairs. The complainant says that in mid 2021, his tenant reported that stains and mould had reappeared on the gyprock in one of the bedrooms. He says his builder told him it was likely water was coming through broken roof tiles or damaged valleys and sitting on the gyprock. He says that the mutual either failed to repair all the hail damage to the roof or that the repairs undertaken were inadequate. He emphasises the initial protracted repair process and subsequent need for rectification work, which he says supports his position. The complainant notes that the property was built in 2017 pursuant to approved plans. He says that the property has been occupied by the same tenant since build completion and that the property has been professionally managed by a property agent. According to the complainant, there were no issues with the roof prior to the hailstorm and the only people who had ever worked on the roof were the mutual ’s trades. The complainant has provided a photo of the roof prior to the mutual ’s repairs which includes an image of a metal clip said to be holding tiles to the valley. He has also provided a post repair photo of the roof and notes that the clip is no longer in place. In addition, the complainant has provided a photo he says shows sunlight coming through the roof into the ceiling cavity. Determination | Case number: 901163 Page 4 of 7 The complainant says in light of the points set out above, common sense dictates that the mutual is liable for the cost of repairing the further water damage and rectifying the continuing issues with the roof. Mutual says it is not liable The mutual relies on a causation report dated 16 February 2022 by SC, engineers and building consultants. SC inspected the property on 27 January 2022 and reported:  the tenant advised that no water ingress had occurred after the hailstorm event and following completion of remedial work to the roof  it therefore considered water ingress issues from the roof to have been resolved  the set joint observable along the hallway wall sheets was due to previous and original building defects, unrelated to any insurance repairs  the hallway ceiling cracking was consistent with original building defects and workmanship, namely missing control joint and back-blocking of the ceiling, contrary to applicable Austra lian Standards and manufacturer’s specifications  the hallway ceiling cracking was unrelated to any insurance repairs  the historic mould to the bedroom ceiling pre-dated the hail event and so was therefore unrelated to the hail event  at the time of inspection the paint surface had been removed due to extensive abrasive cleaning by the tenant, however, there was no evidence of mould to the plasterboard within the ceiling space or the bedroom  no remaining hail damage was evident to the roof at the time of inspection. Based on SC’s report, the mutual says the damage the complai nant claimed for in June 2021 is not the result of the hail (or any other) protected event. Rather, the damage was from excluded causes, noting that the PDS specifies on page 97 that the mutual will not pay for damage arising from: (m) wear and tear, gradual deterioration or any gradually operating cause; … (p) defect or built-in faults, faulty designs, plans, specifications, materials, workmanship; Further, the mutual relies on SC’s assessment t hat the roof had been adequately repaired and that none of the further damage claimed is related to the previous repairs undertaken. Mutual is not required to pay for further repairs Based on the available information, I am not satisfied that the complainant has proven that the damage claimed is due to the hailstorm or any repair inadequacy. On balance, the damage is the result of excluded factors. The complainant has not provided any expert reports despite being invited to do so. Further, while the complainant refers to comments by his builder and tenant, he has not provided any statements or communications from them. Nor has he provided a copy of property inspection reports he says support his position. Determination | Case number: 901163 Page 5 of 7 While I acknowledge the c omplainant’s commentary about the photos he provided, he is not a builder. Further, I am not satisfied that the lack of a single metal clip or the appearance of light in an area of the ceiling cavity confirms the mutual failed to attend to repairs or that its repairs were inadequate. On the other hand, SC has provided a report containing detailed analysis and supported by photos as well as extracts from applicable Australian Standards and manufacturer’s specifications. I have found SC’s report persuasive. Accordingly, the mutual is not required to attend to the further repairs claimed. 2.2 Is non-financial loss compensation payable? Yes. The mutual took ten months to deliver its claim decision concerning the further water damage. No explanation has been provided for the delay. I am satisfied that delay was unreasonable and caused the complainant stress and inconvenience. The mutual is to pay the complainant $750 in non-financial loss compensation. AFCA can award compensation for poor claim handling Under paragraph D.3.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400) where the financial firm’s actions have caused an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with the complainant’s expectation of enjoyment o r peace of mind. Mutual has caused stress and inconvenience The complainant says that the mutual has been difficult to deal with and that its delays have been ‘shocking’. He says the mutual took too long to:  assess and repair the hail damage in the first place  attend to rectification works  respond to him in relation to the further water damage he notified on 22 June 2021. From the limited information available, it appears that the mutual authorised the hail damage repairs within four months of being notified of the claim on 9 April 2019. I consider that to be a reasonable timeframe. I am unable to determine from the available information whether the mutual unreasonably delayed completion of repairs or the subsequent rectification works. I accept those processes took an unusual amount of time but I am unable to assess the reasons for that. The following dates derived from the information the mutual has provided are relevant in considering the complainant’s concerns about how long the mutual took in responding to the further water damage claim: 22 June 2021 Complainant sends mutual an email about the further water damage 22 July 2021 Mutual requests its assessor to re-open its file, noting complainant was to provide a quote and images from a builder 10 January 2022 Mutual instructs assessor to appoint an independent building consultant to inspect the property and report on causation 16 February 2022 Date of SC’s causation report 27 April 2022 Mutual issues written denial Determination | Case number: 901163 Page 6 of 7 The mutual took ten months to issue its claim decision. It did so more than a month after SC issued the report that formed the basis of its claim denial. The mutual has not provided any explanation for the delay. I am satisfied that the mutual’s delay in issuing its claim decision was unreasonable. It is clear that delay caused the complainant stress and inconvenience. Accordingly, the mutual is to pay the complainant $750 in non-financial loss compensation. 2.3 Why is the outcome fair? The complainant has not proven the damage claimed is due to a listed protected event or ineffective repairs by the mutual. Instead, the damage is from excluded causes. It would therefore not be fair to require the mutual to attend to further repairs. However, it is fair that the mutual pays the complainant $750 in compensation for the stress its delays caused. Determination | Case number: 901163 Page 7 of 7 Supporting information 2.4 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.