Home / Allianz Australia / Determination 901094

Determination 901094

Claim declined for earthquake damage; insurer says damage caused by footing movement, soil reactivity and trees

FirmAllianz Australia
Decided2023-02-02
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainants claimed under their home and contents policy for earthquake-related damage in January 2022. The insurer declined, attributing the damage to footing movement, soil reactivity and trees, and AFCA found the claim was not established.

The complainants did not establish that the earthquake was the proximate cause of the damage, as expert evidence and prior crack repairs showed long-term footing and soil movement.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 901094 Financial firm Allianz Australia General Insurance Limited Determination | Case number: 901094 Page 1 of 5 Case number: 901094 2 February 2023 1 Determination overview 1.1 Complaint The complainants hold a home and contents insurance policy with the financial firm (insurer). In January 2022, they lodged a claim for damage they say was due to the Victorian earthquake on 22 September 2021. The insurer declined the claim because it says the damage is not consistent with the earthquake. It says the damage was pre-existing and has been caused by differential footing movement, soil movement from foundation reactivity and abnormal site moisture conditions due to trees. The complainants disagree with the insure r’s decision and seek that the claim be covered. 1.2 Issues and key findings Is the insurer entitled to decline the claim? Yes. I am satisfied, on balance, that the damage to the property has been caused by differential footing movement, moisture content variations, soil reactivity and the presence of the trees. This supported by the evidence of previous cracking repairs throughout the building. Accordingly, the complainants have not established a valid claim and the insurer is entitled to decline cover. Why is the outcome fair? The complainant has not established a valid claim because the available information does not show the earthquake event caused the damage to the property. It would not be fair in the circumstances to require the insurer to cover the claimed loss. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to take any further action in relation to the claim or this complaint. Determination | Case number: 901094 Page 2 of 5 2 Reasons for determination 2.1 Is the insurer entitled to decline the claim? Yes. I am satisfied, on balance, that the damage to the property has been caused by differential footing movement, moisture content variations, soil reactivity and the presence of the trees. This is supported by the evidence of previous cracking repairs throughout the building. Accordingly, the complainants have not established a valid claim and the insurer is entitled to decline cover. Onus on complainants to establish valid claim The initial onus is with the complainants to establish, on the balance of probabilities (that is more likely than not), that the loss or damage claimed falls within the terms of the policy. This is known as a valid (or prima facie ) claim. Once the complainant has established a valid claim, the onus shifts to the insurer to establish, on balance, the application of a policy exclusion or that it is otherwise entitled to decline the claim under the policy. Provision of policy documents unclear and prescribed contract will apply The insurer’s policy is made up of the policy sched ule and the product disclosure statement (PDS). It is not in dispute that the complainant was insured at the time of the earthquake on 22 September 2021. However, the insurer has not provided, and says it has not been able to locate, a copy of the policy schedule for the period 7 August 2021 to 7 August 2022. The insurer has also provided two PDS documents - one came into effect on 20 August 2021 and the other on 21 November 2021. I am not satisfied that either PDS applies to the claim since both are dated after the 2021/2022 policy likely came into effect. Under section 35(2) of the Insurance Contracts Act 1984 (Cth)(Act), the insurer is obliged to clearly inform the insured of the relevant provisions of insurance cover before the contract is entered into. If this does not occur, section 35(1) will apply and the claim will be considered under the prescribed contract. Section 35(1) requires that the event giving rise to the claim to be a prescribed event as defined in the Insurance Contracts Regulations 2017 (Cth). Based on the information presently available, I am unable to confirm that the insurer notified the complainant in writing of the provisions of its policy before the contract was entered into. Accordingly, I am satisfied, on balance, that the prescribed cover under the Act will apply since home and contents insurance policies are prescribed contracts and earthquake is a prescribed event. Information must show the proximate cause of the damage is earthquake Both the insurer’s PDS and the prescribed contract provide cover for certain ‘insured events’. This means not all loss and damage is automatically covered. Rather, only loss or damage caused by one or more of the insured events, and not subject to exclusions, is covered. When an insurance contract uses the term ‘caused by’, this typically means proximate cause. Proximate cause is a question of fact depending on the circumstances. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause of the loss. Determination | Case number: 901094 Page 3 of 5 Therefore, to establish a valid claim, the available information must show the proximate cause of the damage claimed is the earthquake event. Complainants say an earthquake caused damage to the property The complainants say, following the earthquake, they discovered cracking throughout the internal plaster surfaces, a fracture of a window and movement of the external concrete pavement. No expert reports have been provided by the complainants. Insurer provided reports commenting on the cause of damage The insurer appointed a builder, LSB, to attend the property. LSB also arranged for a structural engineer, LGC, to provide an expert report. LGC’s report says the earthquake event did not cause the damage to the insured property since:  it is located 155 kilometres from the epicentre in an area classified on the Modified Mercalli Intensity Scale as MMI IV (light) which indicates the earthquake forces are not expected to cause damage to buildings;  lateral stability analysis of the building for the imposed earthquake loads confirms the structure has sufficient lateral bracing to resist the maximum earthquake load measured and occurring at the property;  analysis of the lateral loads on the pergola confirms the maximum load is within the axial and bending capacity of the rafter and battens and therefore is not the cause of fracture;  the windows and glazing have sufficient capacity to resist compliant wind pressures which significantly exceed the imposed out-of-plane inertial force from the earthquake;  the imposed lateral earthquake loads are not inducing any stress in the concrete slabs and the observed pattern of cracking is not consistent with lateral movement; and  the imposed earthquake loads are insufficient to cause any damage to the structure and are not the cause of observed building damage. LGC further says:  site investigations and soil tests indicate highly reactive clay foundations with abnormal soil moisture conditions created by groups of medium and small sized trees within close proximity resulting in problem site classification;  preliminary soil investigations indicate that the foundation material of the footing system may be inadequate, contributing to widespread differential footing movement. The investigations indicate that the footing has been founded just onto and not into the natural clay stratum;  the floor level survey results confirm widespread, minor differential movement of the structural footing system of the building. This is consistent with soil movement due to moisture content variations of the reactive clay foundations. These, in turn, are due to site and environmental factors and contributed to by abnormal soil moisture conditions (caused by the trees and potentially contributed to by inadequate founding depth and material into which the footing system has been founded)  the footing system is inadequate for the expected foundation at the site. The pattern of differential footing movement and performance of the building is as expected given the inadequate design of the footing system;  in its opinion, the observed damage has been caused by stresses induced by building movements due to one or more of the contributing factors identified above; Determination | Case number: 901094 Page 4 of 5  differential footing movement, inadequately designed footings and potentially inadequate foundation soils are considered to be the primary cause of the building movement and damage;  given the site reactivity, abnormal site moisture conditions resulting in class P (problem site) classification, inadequate design of the footing system and potentially inadequate foundation soils, it is their opinion that the detected footing movement and subsequent damage has been a long-term and an ongoing issue at the property. This conclusion is supported by the prior crack repairs throughout the building which is consistent with long- term and ongoing building movement;  the damage to the pergola is due to long-term water ingress of the plaster roof due to inadequate waterproofing and fracture of the plastic. This is causing decay of the timber roof batten and subsequent fracture;  the fracture of the glass has been caused by induced stress due to building movement, thermal movements, fatigue stress and spontaneous fracture due to nickel sulphide; and  inspection of the concrete pavement confirms high subgrade reactivity and abnormal soil moisture conditions due to groups of trees in close proximity to the concrete pavement. Soil tests indicate the pavement has been constructed into the fill material which is an inadequate subgrade for the pavement slab. Information does not show damage due to earthquake Having reviewed all the available information, I am satisfied, on balance, that the damage to the property has been caused by differential footing movement, moisture content variations and soil reactivity and the presence of the trees. This is supported by the evidence of prior repairs throughout the building, which is consistent with the damage having being caused over a long period rather than by an insured event. This is particularly so when there is no contrasting evidence which has been provided by the complainant. Accordingly, the complainants have not established a valid claim under the policy and/or the prescribed contract for the earthquake event. The insurer is therefore entitled to decline cover for the claim and is not required to take any further action in relation to the claim or this complaint. 2.2 Why is the outcome fair? The complainant has not established a valid claim because the available information does not show the earthquake event caused the damage to the property. It would not be fair in the circumstances to require the insurer to cover the claimed loss. Determination | Case number: 901094 Page 5 of 5 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.