Partial denial of storm damage claim (pool, fence, retaining wall, pillars, debris) and claim delay
Text of the determination
Determination
Case number 900979
Financial firm AAI Limited
Determination | Case number: 900979 Page 1 of 9
Case number: 900979 16 June 2023
1 Determination overview
1.1 Complaint
This complaint relates to a claim by the complainant under her home and contents insurance
policy held with the financial firm (insurer), for damage to the insured property.
The insurer accepted the claim for a small part of the fence but denies that part of the claim
that relates to several other matters including the pool, removal of debris, damage to garden
beds, the retaining wall, paving, pillars, the post-box and the remainder of the fence.
The complainant also says that the insurer has delayed and poorly handled the claim.
1.2 Issues and key findings
Is the insurer entitled to deny the complainant’s claim?
Given the terms and conditions of the policy, together with the circumstances of the loss, the
insurer is required to pay the claim for the pool and removal of debris but is entitled to deny
the claim for damage to the remaining items.
Is the complainant entitled to non-financial loss compensation?
Yes. Given the insurer‟s handling of the claim, the complainant is entitled to non -financial loss
compensation of $3,000.
Why is the outcome fair?
Given the terms and conditions of the policy and the circumstances of the loss it would not be
fair for the insurer to deny all the claim.
1.3 Determination
This determination is partially in favour of the complainant.
The insurer is required to comply with the provisions of this determination.
Determination | Case number: 900979 Page 2 of 9
2 Reasons for determination
There has been a full exchange of all material information relied on for the purposes of this
determination and each party has had the opportunity to address all issues.
This complaint has been determined based on what is fair in all the circumstances, having
regard to the relevant law, good industry practice, codes of practice and previous decisions
where applicable.
While the parties have raised numerous issues in their submissions, for the purposes of this
determination commentary has been restricted to those issues considered directly relevant to
the outcome only.
2.1 Is the insurer entitled to deny the complainant’s claim?
Coverage of the policy
The complainant‟s home and co ntents insurance policy covers loss or damage to the home at
the insured address caused by an insured event in the period of insurance.
The coverage provided by the policy is subject to conditions, limitations, and exclusions. This
means that not all loss and damage is automatically covered. Rather, only loss and damage
caused by an insured event, during the period of insurance and subject to the conditions,
limitations and exclusions, is covered.
The full details of the policy coverage, conditions, limitations, and exclusions are contained
within the Product Disclosure Statement (PDS) and Certificate of Insurance (COI).
I am satisfied that the PDS and COI have been provided to the complainant. Therefore, the
insurer is entitled to rely upon the terms of the policy, including its conditions, limitations, and
exclusions, to determine its obligations to the complainant.
Insured events (at page 42 of the PDS) include “Storm”.
The COI confirms that the optional cover for “Accidental damage at home” is incl uded in the
policy coverage.
However, the policy coverage for Accidental damage at home (page 77 of the PDS) has a
specific exclusion for;
loss or damage that is covered under an insured event listed on pages 41 to 48, as
you can make a claim for loss or damage under the applicable insured event
I am satisfied that it is appropriate that the insurer‟s liability for the complainant‟s claim be
considered under the insured event of storm.
It is accepted insurance law that the complainant carries the initial onus to establish, on the
balance of probabilities (that is, more likely than not), a loss which is covered by the terms
and conditions of the policy.
Once the complainant has established a loss which is covered under the policy, the onus
transfers to the insurer to establish the application of a condition, limitation or exclusion upon
which it seeks to rely, to limit its obligations regarding the claim, or to deny the claim.
Determination | Case number: 900979 Page 3 of 9
Circumstances of the loss
The complainant lodged her claim with the insurer on 4 March 2022, advising that the
property had been damaged by a storm, said to have occurred on 26 February 2022.
The exchanged material confirms that the insurer engaged a restoration company (AR) who
appears to have attended at the property on 28 June 2022.
I note the complainant says this attendance occurred on 30 June 2022. AR‟s report is dated
30 June 2022 and the report details, “Report Date: 28/06/2022”.
While the small difference in the two dates is likely insignificant, what is of significance is that
AR‟s attendance was the first at the property by a representative of the insurer.
I am satisfied that it was a significant weather event in late February 2022, and it would have
tested the insurer‟s resources, but four months is a long time a nd much can happen in that
time.
Reports
AR‟s report includes several photographs and conc ludes;
Based on our site inspection and information obtained AR believe damages are the
result of a storm resulting in a tree to fall and come into contact with multiple fence
panels. AR believe the damages to the pool is from hydrostatic pressure causing the
walls to collapse. The damages to the front concrete is from multiple concrete slabs
not being joined together resulting in cracking to the decorative coating over the top.
The damages to the front pillars and retaining wall has been caused by run off water
building up behind the area resulting in cracks in the render and the pillars to dislodge
from there original position. AR believe if the pillars were connected to a footing the
damages would not have occurred
The insurer‟s assessor (DA) attended on site on 21 July 2022 and provided a report of the
same date.
DA recommended the appointment of an engineer to provide expert review and a causation
report for the pool.
The insurer engaged consulting engineers (KM), who inspected the property on 9 August
2022 and provided a report dated 20 August 2022. The report contains numerous
photographs.
The claim
The complainant says that there are several outstanding matters;
The pool,
Fence repairs,
Retaining wall,
Garden beds,
Collapsed pillars/letter box,
Removal of debris, and
The insurer‟s handling of the claim.
The insurer says that it has accepted the complainant‟s claim for the resultant damage to the
boundary fence.
Determination | Case number: 900979 Page 4 of 9
Based on the exchanged material, I am satisfied that the complainant has established a valid
claim for damage at the property because of the storm that occurred on 26 February 2022.
However, the complainant still carries the onus to show that the specific items for which she
claims are covered by the terms and conditions of the policy and in the circumstances of the
insured event of storm.
The insurer has denied the balance of the complainant‟s claim.
The insurer says that there is a combination of causes of the damage, including;
Inadequate construction and lack of appropriate foundations and drainage to the pool,
Long-term ongoing natural ground movement of the foundations soils due to seasonal
and environmental factors to the driveway/concrete slab,
Concrete shrinkage to the retaining wall and
Lack of reinforcement and control joints and inadequate construction of the front
pillars.
Further, the insurer seeks to rely upon the general exclusions for loss or damage that is
caused by or arises from, or involves;
Wear, tear or gradual deterioration,
Seepage of water or
Water seeping or running through the earth.
Finally, the insurer says that damage to retaining walls or cracking to sealed driveways
caused by storm is specifically excluded under that insured event.
The pool
KM reported;
The conclusion from our Structural Engineering investigation is that the damages to
the swimming pool, cracking to the concrete slab and blockwork retaining wall and
failure of the front pillars are not attributed to the February 2022 flooding event.
The source of the previous leak to the swimming pool liner is not evident and cannot
be attributed to the February 2022 flooding event. The damages to the swimming pool
can be attributed to the construction methods used.
The swimming pool relies on the pool being full of water to resist the horizontal earth
pressure. As the pool continued to leak, this would have allowed the earth pressure to
overcome the resistance provided by the swimming pool water. The heavy rainfall
event in March would have exacerbated the pressure behind the pool as the soil
became saturated and placed additional hydrostatic pressure on the pool walls. This
has resulted in the southern swimming pool liner detaching from the steel pool frame
and collapsing in
There are a lack of subsoil drains visible and the backfill does not appear to be set
cement stabilised sand. There is also a lack of a hydrostatic pressure relief valve in
the pool base. A combination of the above pool construction issues would have
contributed to the failure of the swimming pool by allowing excessive hydrostatic water
pressure to build up behind the pool, which has contributed to the pool liner failing.
Good building practice is to provide hydrostatic relief valves at the base of swimming
pools, subsoil drains behind the swimming pool walls and cement stabilised sand
Determination | Case number: 900979 Page 5 of 9
backfill to minimise the risk of water/hydrostatic pressure building up behind the pool
walls.
The exchanged material confirms that the complainant had only recently purchased the
prope rty. Further, there is no evidence to challenge the complainant‟s statement that after
they moved into the home (24 December 2021) she and her family regularly used the pool
over the holiday period.
The complainant says that no damage or issues were noted and that the pool was
professionally maintained, tested and cleaned on an ongoing regular basis.
Significantly, the complainant says that the pool had water in it at the time of lodging the claim
and only after that time did the water level drop.
There is no evidence to challenge these statements.
On 17 April 2023, the complainant contacted the insurer to advise that debris was blown into
the pool from the storm.
Five and a half months after the storm event and, notwithstanding that KM was unable to
determine the source of the leak from the pool, he was prepared to say that the source of the
leak cannot be attributable to the „February 2022 floo ding event, and that the damage to the
swimming pool can be attributed to the construction methods used.
In my view this is pure speculation that ignores the available evidence;
Up until the time of the storm the pool was regularly used and maintained with no
problems,
There was a significant weather event on 26 February 2022, and
Debris created by the storm was blown into the pool.
As the insurer has chosen not to ascertain the cause of the leak, it cannot exclude the storm
as the proximate cause of the leak and damage to the pool.
Further, despite the evidence of KM, I prefer the evidence presented by the complainant
regarding the construction of the pool, given that there were no problems prior to the storm
and the problems commence from the date of the storm.
The result is that I am satisfied that insurer is required to meet the complainant‟s claim for the
pool under the terms and conditions of the policy.
The exchanged material confirms for me that the pool required replacement.
I understand that the pool has been replaced by the complainant.
The insurer is to cash settle the complainant based upon the amount paid by the complainant
for the cost to replace the pool.
The complainant is to provide proof of payment
To the cash settlement, the insurer is to add interest, calculated in accordance with the
Insurance Contracts Act 1984 (the Act), from the date the complainant took out the loan to
replace the pool, until the date of payment by the insurer.
The complainant is to update the loan details previously provided.
Determination | Case number: 900979 Page 6 of 9
Fence repairs and cracking concrete
The insurer has partial accepted the claim for fence repairs and a quotation in the amount of
$2,717.55, for two boundary fence panels (reduced by 50% for the boundary) and three other
fence panels has been provided by AR.
The complainant says that she has paid for fence repairs and has provided a quotation, dated
11 June 2022, in the amount of $38,080.00.
In his report, KM details;
The cracking to the concrete slab can be attributed to natural ground movement and
the construction joints between the pathway and infill slab not being reflected through
the spray finish. Natural ground movement occurs as the reactive clay soils shrink and
swell due to seasonal moisture variations over the life of the structure. The infill slab
has been poured after the previous pathway slab. The construction joint should have
been reflected through the spray finish. Any differential movement between the two
slabs would result in cracking occurring along this joint.
The cracking to the blockwork retaining wall render can be attributed to concrete
shrinkage over the life of the structure. The pattern of cracking around all of the blocks
are consistent with shrinkage cracks. There are no visible control joints in the retaining
wall. There is likely a lack of horizontal steel reinforcement to the retaining wall to
resist shrinkage. This has resulted in shrinkage cracks in the retaining wall mortar
reflecting through the render finish and the render to detach in multiple locations.
I am not satisfied that the complainant has provided sufficient evidence to establish that the
remaining damage to the fences or the cracking to the concrete was caused by storm.
Based on the available evidence, including the photographs, I am of the view that it is more
likely that the damage to fences is due to wear, tear and gradual deterioration and the
cracking of the concrete paths and driveways is due to natural ground movement, together
with wear, tear and gradual deterioration.
In this regard, I also note the exclusion (at page 42 of the PDS), for resultant damage to
sealed paths and sealed driveways, caused by storm.
The insurer is entitled to deny the balance of the claim for the fences and concrete cracking of
paths and driveways.
Retaining wall
The PDS (also at page 42) has an exclusion for loss or damage to retaining walls. This
exclusion relates specifically to loss or damage caused by the insured event of storm.
The insurer is entitled to deny this aspect of the claim.
Garden beds
Page 21 of the PDS confirms that plants, trees, shrubs and hedges in the ground are not
covered as part of the home, unless covered under the additional cover for Damage to
gardens and plants.
Page 61 of the PDS confirms that the cost of replacing trees, shrubs, plants, hedges or
garden beds, is not covered if the loss or damage is caused by the insured event of storm.
I am satisfied that the insurer is entitled to deny this aspect of the claim.
Determination | Case number: 900979 Page 7 of 9
Collapsed pillars/letterbox
KM advised;
The pillars were already removed at the time of our inspection. No footing or
reinforcement was visible at the base of the previous location of the pillars. The pillars
were likely not installed in accordance with good building practices and likely did not
have a sufficient connection at the base to allow the pillars to cantilever.
The complainant has not provided evidence to challenge KM‟s position.
The complainant carries the onus to establish that the damage to the pillars and letter box is
covered under the terms of the policy. I am not satisfied that she has met this onus.
The insurer is entitled to deny this aspect of the claim.
Removal of debris
Page 57 of the PDS includes the additional cover for removal of debris;
When we cover loss or damage to the home, we will also cover the reasonable and
necessary costs of:
— demolishing and removing the damaged parts of the home from the insured
address;
— removing debris, including fallen trees or branches, where:
— the debris has damaged the home;
— removal of the debris is required in order to repair the home.
I am satisfied that this additional cover relates to the aspects of the claim that the insurer is
required to cover, in this case, a portion of the fence claim and the pool claim. Given it was a
storm and debris was blown into the pool and likely other areas, then general debris at the
property would be expected.
The complainant‟s level of cover (Classic) entitles her to an amount for removal of debris of
up to 10% of the home sum insured.
The insurer is to cash settle the complainant for the reasonable costs incurred in the removal
of debris, relating to the aspects of the claim that are covered under the policy.
I understand that the removal of debris has been completed.
The complainant is to provide details and proof of reasonable expenses incurred in the
removal of debris. This does not include the time and labour expended by the complainant
and her family.
The insurer is to pay interest, in accordance with the Act, from the date the complainant paid
for the removal of debris, until the settlement is paid.
2.2 Is the complainant entitled to compensation?
Under AFCA‟s Rules, we may award compensation (capped at $5,400) for non -financial loss
where a complainant has suffered an unusual degree or extent of physical inconvenience,
Determination | Case number: 900979 Page 8 of 9
time taken to resolve the situation or interference with their expectation of enjoyment or peace
of mind.
However, we adopt a conservative approach to the award of compensation for non-financial
loss. We expect complainants to be moderately robust and bear the usual stress and
inconvenience associated with an insurance claim. Moreover, non-financial loss is not
intended to be a punishment for any wrongdoing on the part of the insurer
The onus is on the complainant to establish she has suffered a loss because the insurer
mishandled the claim.
The complainant has exchanged a detailed timeline of events. I accept this timeline as
accurate.
I am satisfied that there are significant delays in the insurer‟s handling of the claim that have
not only contributed to the time taken to resolve the claim but also added stress and
inconvenience to the complainant and her family.
In the circumstances it is fair that the insurer pays the complainant $3,000 in non-financial
loss compensation.
2.3 Why is the outcome fair?
Given the terms and conditions of the policy and the circumstances of the loss it would not be
fair for the insurer to deny all the claim.
Determination | Case number: 900979 Page 9 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.