Water damage claim partially declined: long-term shower leak excluded as wear, tear and gradual deterioration; temporary accommodation and loss of rent not covered
Text of the determination
Determination
Case number 900895
Financial firm AAI Limited
Determination | Case number: 900895 Page 1 of 9
Case number: 900895 20 February 2023
1 Determination overview
1.1 Complaint
The complainant held a landlord insurance policy (policy) with the financial firm (insurer). On
8 June 20220, a claim was lodged for water damage to his tenanted property.
The insurer has partially accepted the claim. The insurer says most of the damage, including
structural damage to timber bearers and subfloor relates to long term damage due to water
leaking from the shower cubicle.
The complainant is not satisfied with the insurer’s claim decision . He says all the damage is
due to a single event of water overflowing from the shower due to a blocked drain. The
complainant is seeking cover for all the noted damage in addition to temporary
accommodation and loss of rent.
1.2 Issues and key findings
Is the insurer liable for the disputed damage?
No. The available information shows the damage the insurer has declined to cover is because
of long term ongoing water leakage from the shower due to wear, tear and gradual
deterioration of the seals/grout, which is excluded under the policy.
Is the insurer liable for temporary accommodation costs?
No. The policy does not provide cover for temporary accommodation for the tenant. The
policy does include cover for loss of rent, however, the complainant as not established an
entitlement to this loss under the claim.
Why is the outcome fair?
The outcome is fair because the insurer’s liability is governed by the insurance policy which
contains limits, conditions, and exclusions to what is covered. Where parts of the loss fall
outside what is claimable under the policy, it is fair the insurer be permitted to decline cover
for such loss under the claim.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to settle the claim by way of a cash settlement. The insurer is to
increase its final cash settlement to $6,654.28, this includes a 15% uplift ($867.95) on its
current claim settlement offer.
Determination | Case number: 713109 Page 2 of 9
2 Reasons for determination
2.1 Is the insurer liable for the disputed damage?
Policy covers damage caused by insured events, and not otherwise excluded
The policy covering the insured property is an insured events contract. This means the policy
will provide cover for loss or damage to the insured property caused by one or more of the
listed events specified in the product disclosure statement (PDS). Cover under these benefits
is subject to the conditions, limitations and exclusions also provided in the PDS.
Relevant to this complaint, escape of liquid is an insured event. There is no dispute there was
an escape of liquid when the shower overflowed due to the drain pipe becoming blocked.
Accordingly, the complainant has shown an entitlement to cover under the policy. The onus
rests with the insurer to show, on balance, an entitlement to decline or limit cover under the
claim in line with the policy provisions or otherwise.
The dispute relates to the extent of the insurer’s liability under the claim. T he insurer says
there are two separate causes for the damage found and relies on the policy exclusions to
limit its liability under the claim. The exclusions relate to leaks from a shower cubicle,
repairing the item the liquid escaped from and deteriorated grout and sealant. The relevant
policy wording has been quoted in section 3 of this determination.
Consultants’ evidence shows there is more than one leak
The panel is satisfied the available evidence shows the claimed event (blocked drain) is only
one of the reasons for the damage noted to the insured building.
The insurer has provided multiple expert reports including leak detection tests, images of the
shower cubicle and sub floor damage. A particularly compelling part of the testing is provided
by consultants ‘AR’, which featured a spray test while observing the area with a thermal
camera.
This testing showed water escaping from multiple areas of the shower cubicle during a spray
test. This shows the shower cubicle had been leaking during general use, not just when the
floor drain was blocked and overflowed. Further, that this water was leaking into the walls
through deteriorated grout and seals, as well as, rotted timber skirting near the shower
cubicle adjoining the main bedroom.
The panel accepts this information establishes the single event of the shower overflowing due
to the blocked drain is not the sole cause for the noted water damage. It is reasonable to
accept there is damage from both causes. However, it is the extent of the contribution to this
damage which is of significance for the purpose of this complaint.
The panel a cknowledges the complainant’s consultant ‘DA’s’ explanation which says once an
area becomes wet, drying takes time which occurs over many months, instead of weeks. If
the area continues to be dampened by subsequent leaks, this can lead to further damage.
Accordingly, it is necessary to establish whether the disputed damage has only occurred after
the recent overflow event, or if it happened before this.
Determination | Case number: 713109 Page 3 of 9
No dispute overflow from shower was a single one-off occurrence
The complainant says the tenant (JW) stopped using the shower immediately after the
overflow event occurr ed. This is also supported by JW’s witness statement which says she
cannot use the shower until it is fixed.
This indicates the shower only overflowed once due to the blocked drain. It also indicates that
there is an understanding the shower cubicle is leaking for reasons which are not connected
to the blocked drain.
However, it is fair to accept the extent of water that overflowed resulted in water leaking into
the ceiling cavity of the loungeroom below and subsequently onto the carpet. The insurer has
accepted this and the damage to the ceiling and lounge room carpet are not in dispute.
Information indicates the shower was leaking before the overflow event
The panel is satisfied the shower cubicle has been leaking for some time and that this had
been occurring prior to the overflow event reported to have occurred in June 2020.
Plumbing consultants ‘BB’ attended the insured property on 15 June 2022 to complete the
initial leak detection work. BB’s report confirms there was already substantial long-term water
damage to the skirting next to the shower . BB’s spray tests and thermal imaging confirm
water was escaping into the wall cavity and onto the ceiling below.
Photos provided by BB clearly show the worn and deteriorated condition of the seals and
grout within the shower cubicle. There is evidence of cracking to the grout in various areas,
deteriorated seals and long-term staining/mould in various areas consistent with water leaking
over an extended period.
In its report dated 18 June 2022, consultants DS confirm having noted water and fungal
damage to sections of the lounge room ceiling as well as the carpet and underlay directly
below. On inspecting the ceiling cavity DS found the ensuite particle board sub-floor
presented with fungal growth (mould), water damage and elevated moisture.
Photos attached to DS’s report confirm the above and support that this damage to the
bathroom sub-floor was consistent with long term water damage and not a single one-off
event. DS also noted and refers to damaged timber skirting to the left-hand side of the shower
cubicle, noted as heavily water damaged and swollen.
The panel finds this information persuasive in establishing the condition of the areas in
question within days of the claimed overflowing event. The panel accepts this information
shows, on balance, that most of the water damage shown is unlikely to be due to the one-off
and recent overflow event.
In formation supports the insurer’s position that not all the damage is covered
In line with the matters discussed above, the panel is satisfied the insurer is entitled to limit its
liability under the claim. This is because the panel is satisfied the sub-floor structural water
damage and associated repairs is more likely due to the ongoing long-term water leaks from
the shower cubicle. These leaks and associated damage pre-date the one-off water overflow
event.
The panel notes DA’s quote includes an extensive scope of works which includes removing
the neighbouring bedroom wall, carpet and a complete strip out of the entire bathroom. DS
maintains this is required to access and repair the water damaged timber bearers, sub-floor
(particle board) and mould remediation works. However, the panel is not satisfied that all
Determination | Case number: 713109 Page 4 of 9
these works relate to or are because of the one-off overflow event for which the claim was
lodged. Rather, on balance, this is pre-existing damage due to the long term water leaks from
the shower cubicle.
The panel accepts, the insurer’s liabilit y only extends to damage which was caused by the
insured event and not otherwise excluded. In this instance, the claimable loss is the damage
directly related to the overflow event. The ongoing leaks fall within the policy exclusions
relating to wear, tear and gradual deterioration.
The panel accepts damage to the lounge room ceiling, light fitting and carpet is consistent
with the overflow event. The panel has considered if the master bedroom wall and carpet
should be covered. However, there is insufficient information of this damage or the extent of
such damage. Further, there is no information to show, if this damage exists, that it relates to
the overflow event.
Without persuasive supporting information, the panel is not satisfied the complainant has
established an entitlement to all the claimed damage including the master bedroom wall and
carpet. The panel notes the master bedroom wall is the same wall where the long-term water
damaged timber skirting exists. The onus rests with the complainant to provide supporting
information to the insurer for its consideration in this regard.
The panel a cknowledges the complainant’s reference to a report from consultants ‘AB’ dated
16 June 2021, which refers to 10% of the total damage being due to the overflow event. This
the complainant believes would include the sub-floor structural damage. However, the panel
is not of the same view nor considers it would be fair in all the circumstances to apply such
interpretation.
The panel accepts AB’s reference is an estimation of the claimable loss as set out in AB’s
liability quote, rather than to the totality of the damage to the complainant ’s preferred scope of
works ( DA’s quote ). The panel is not satisfied the evidence shows, on balance, the overflow
event is the dominant cause for or has contributed to the damage in the sub-floor area.
Insurer is entitled to decline cover for disputed damage
The insurer supplied a more recent liability quote dated 8 July 2022 from its partner builder
‘AR’ ( following its inspection) recommending an increase on the claimable loss. The insurer is
seeking to fulfil its liability under the claim by way of a cash settlement. This is because most
of the repairs needed are the responsibility of the complainant.
The panel accepts this is reasonable and consistent with accepted industry practice, given
the circumstances. However, considering what is fair in all the circumstances and factoring
the transfer of risk to the complainant in arranging the repairs, the panel feels the insurer
should slightly increase its settlement offer.
The insurer should increase its cash settlement on the basis that it includes an uplift of 15%
on the total of its cash settlement offer. This gives a total payable of $6,654.28 ($5,786.33
plus $867.95).
The insurer is entitled to collect the policy excess as part of the claim, meaning it can deduct
this from the settlement if it has not already collected the excess from the complainant.
Determination | Case number: 713109 Page 5 of 9
2.2 Is the insurer liable for temporary accommodation costs?
Policy does not cover temporary accommodation for tenants
The complainant has also sought cover for temporary accommodation for the tenant while
repair work is under way.
After carefully reviewing the policy, there is no cover provided for temporary accommodation
for tenants. The only cover the complainant may be able to access is for a loss of rent where
the tenant cannot access the property due to building repair work.
Available evidence does not warrant a loss of rent payment
The panel has considered the evidence about the repairs and is not satisfied the complainant
has shown he is entitled to loss of rent currently. This is because the evidence does not show
a loss of rent has occurred. It may be that the complainant suffers some loss of rent when
undertaking the necessary repairs, which he can submit to the insurer for its consideration.
However, at this point, as noted above such loss has not been established in line with the
policy provisions. Finally, the panel notes the complainant’s opinio n that the insurer should be
required to pay his tenant some compensation given she has had to live through all this over
the previous two years. In line with the AFCA Rules, the panel is not able to require the
insurer to pay the complainant’s tenant non -financial loss compensation.
In the interest of completeness, given the available information, it is unlikely the panel would
have required the insurer to pay the complainant non-financial loss compensation. This is
because the panel is not satisfied the insurer’s overall management of the claim was
reasonable in the circumstances.
2.3 Why is the outcome fair?
The outcome is fair because the insurer’s liability is largely governed by the insurance policy
which contains limits, conditions, and exclusions to what is covered. Where parts of the loss
fall outside what is claimable under the policy, it is fair the insurer be permitted to decline
cover for the loss which falls outside the policy terms.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
Determination | Case number: 713109 Page 6 of 9
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant policy wording
Escape of liquid
We cover
Loss or damage caused by liquid leaking, overflowing or bursting from any of the following:
…
any drain, fixed pipes, roof gutters or guttering and rainwater downpipes, drainage and
sewage systems;
…
We do not cover
…
the cost of repairing or replacing the item from which the liquid escaped;
…
loss or damage to, or caused by, a leaking shower floor or base, shower cubicle walls,
shower glass screening or doors;
…
broken, worn or aged tiles or grouting in walls in bathrooms, kitchens or laundries unless
the damage is caused by liquid leaking from pipes in walls or floors (not forming part of a
shower cubicle wall, floor or base);
…
Loss of rent – prevention of access
…
Determination | Case number: 713109 Page 7 of 9
We cover
We will pay the weekly rental amount if we agree your tenant does not have access to the
insured address due to one of the following incidents:
damage to a building, the strata title property in which the unit is located, or a road or
street providing access to the insured address;
…
We will provide cover until the date the insured address becomes accessible, up to a
maximum of 14 weeks or $4,000, whichever is less.
3.1 Expert evidence summary
Record Key points
Insurer’s plumber ( BB )
Report
15 June 2020
mains pressure test passed
basin, toilet, and shower inspected
no silicone behind shower taps
grout and sealing in shower enclosure in poor condition
shower screen has gaps which are allowing water to leak into the
ceiling area on the f loor below.
Insurer’s builder ( A1 )
Report
16 June 2020
ceiling damage is directly below the first - floor shower
skirting board next to the shower has rotted
rot and mould are indicators an ongoing leak for an unknown
length of time
shower enclosure showed severe grout, silicone, and sealant
deterioration
every time someone uses the shower water escapes and adds to
the ongoing damage
no claimable event appears to have caused the damage.
Insurer’s mould expert (DS)
Report
18 June 2020
insured became aware of an issue when wet carpet and ceiling
stain was found in the living area
water and fungal damage ceiling approximately 300mm by 500mm
visible fungal growth and elevat ed moisture to particle board
subfloor under the bathroom at the ti me of the make safe
inspections of the expos ed ceiling cavity showed what appears to
be pre - existing water damages to the base of the ensuite subfloor
unrelated to the recent issue
in the event the claim is to proceed, remediation work includes
strip out o f the ensuite tiled wall linings and floor coverings as well
as impacted timber subfloor to receive PRV clearance.
Insurer’s builder (AB)
Report
16 June 2021
primary cause is a long - term escape of liquid whic h has creat ed
mould in the ceiling cavity – 90%
secondary cause is shower drain overflowing due to being blocked
– 10%
secondary cause occurred because the drain was blocked while
the shower was in use, resulting in an overflow.
Determination | Case number: 713109 Page 8 of 9
Record Key points
Insurer’s plumber (AB)
Report
2 July 2021
leak detection did not locate a leak except in the shower screen
spray test
deteriorated seals have allowed a leak to damage skirting beside
the shower eventually creating an opening for water to leak into
the ceiling cavity below.
Complainant’s builder (DA)
Report
26 May 2022
it appears the blocked drain has backfilled and flooded into the
ensuite wall cavity and bedroom areas
flooded drain has caused some rotting damage and mould to
timber work in the surrounding areas and left bedroom wall area
rot and mould noted to ensuite ski rting board, timber subfloor, and
top of floor joists under the shower
non - visible damage may be present to top of floor sheet under the
shower, bottom of the wall frame being stud and bottom plate, and
other covered areas
possible causes include a roof le ak down wall, tap holes into wall,
tiles allowing wat er behind, shower base lip leaking AND flooding,
this would cause wat er to run under door.
when flooding occurs, the outlet waste/drain would block and
cause water in the base to overflow to the outside floor, then seep
under walls, skirtings, carpets, etc
once under the walls, it takes many months to dry out, not weeks
which can cause mould and rot
as rotting occurs with water from a blocked /flooded drain, the
affected site over time has wat er under or on timber and often is
“ topped up ” (added to) and not allowed to dry out, it is possible the
overflow from blockage has caused this.
repeated flooding will ex acerbate it.
Insurer’s internal asse ssor
(AS)
Report
9 June 2022
assessor agrees the ‘blocked shower base drain’ from a build - up
of debris (i.e. hair clogged in the drain) has been occurring for a
long period of time)
overflow would only happen when shower bas e fills up during use,
but this would not cause long term damage to the particle board
flo oring under the floor tiles
long term damage appears to be due to the shower recess leak
a one - off overflow from the shower base cannot cause rotting
particle board
DA’s quote is unacceptable, and a dual assessment needs to
occur with the relevant parties .
Insurer’s builder (AR)
Report
8 July 2022
mains pressure test failed due to a water leak at the metre at the
front of the property
secondary test showed local plumbing test also failed
shower breach pressure test passed
spray test with thermal camera showed water escaping the shower
recess above the area of damage in the lounge room
no escape of liquid occurring during waste deluge test
Determination | Case number: 713109 Page 9 of 9
Record Key points
site inspection confirms damage due to water escaping due to a
blockage which has since been corrected
water escaping through deteriorated grout and s ealant may be
contributing to building material damage, not otherwise consistent
with a single flooding event.
Insurer’s internal asse ssor
(BP)
Report
22 July 2022
recommending a cash settlement for balance not paid as AR has
made similar findings to A1 which indicates clear long - term
damage from an ongoing shower leak
simulated us e test to area of concern in t he shower cubicle while
monitoring with t hermal imaging confirms a leak from the shower
recess which would damage t he living room area
some damage is due to water leak from the overflow caus ed by
the blockage
complainant should be settled for claimable loss but remain liable
for damage caused by maintenance issues.
Insurer’s internal asse ssor
(BP)
Report
24 November 2022
i t is apparent A1 identified pre - existing damage to the bearers
initially
A1 and ARC separately confirmed a shower recess leak to the
below room
subfloor damage is consistent with long term gradual damage
rather than the one off claimable leak
Complainant’s builder (DA)
Letter
30 November 2022
sheet flooring to the upstairs bathroom will need to be replaced
meaning bathroom finish must be removed to access it
dividing stud wall bet ween the bathroom and master bedroom
contained water and will nee d to be replaced.